Post Job Free

Resume

Sign in

Power Plant Manager

Location:
Bhubaneswar, Odisha, India
Posted:
November 14, 2020

Contact this candidate

Resume:

BINOD KUMAR SAHOO

TOP Management Power Professional in (O&M) characterized as strategist, can do approach & visionary with excellence in Erection, Testing, Commissioning, Operation & Maintenance with focus on accomplishing organizational goals and objectives.

Email: adhtuu@r.postjobfree.com/ adhtuu@r.postjobfree.com

Mobile: +91-789*******/732-***-****

Key Skills Profile Summary

Erection

Testing

Commissioning

Operation

Maintenance

SAP Implementation

Techno-commercial Proposals

Business Development

Training

Team Building & Leadership

A result-oriented professional with more than28.6 years of experience in erection, commissioning, operations & maintenance services in plants of station capacity 1740MW, 3400 MW,1400 MW,4620 MW,600 MW,420 MW. With unit size of 210MW,300MW,330MW,600MW and 660MW.

A high energetic professional with high self-confidence, self-motivated, good motivation power, high determination power, and aggressive positive attitude, extensive experience & sound technical knowledge with strong analytical and problem solving skills, team builder, communicate ideas effectively, sound managerial capability, having Strong inclination towards Corporate values, world class Safety and Environment Management System exposure, good planner, honest & high activeness to achieve my worthy goal.

I am the best professional to lead any team, where I can utilize my all skill power to grow up the organization & to consistently maintain a high quality of output

Pioneer in leading end-to-end procurement functions involving identification of opportunity, techno-commercial comparative proposal, measurement & contracts.

Excellence in finalizing Annual Operation & Maintenance Contracts, standard formats development of contracts & procurement and coordinating pre & post award activities

Skilled in SAP implementation

Expert in defining and developing joint strategies for successful and cost effective delivery models.

Experience in developing integrated management system in line with ISO and SOPs to operate systems more safely and profitably.

An effective leader with excellent communication, negotiation, intrapersonal and team building skills

Best solution provider during critical situations, thinking out of the box with can do approach having high determination & motivation power.

Career Timeline:

HOD Maintenanace (Manager Plant Maintenance in AES)

July 2018 continuing

AVP (ELECTRICAL-O &M)

DEC 2013

July2018

GEBERAL MANAGER (ELECTRICAL)

SEPT 2010

DEC 2013

DY.GENERAL MANAGER (ELECTRICAL)

APRIL 2009

SEPT 2010

MANAGER (ELECTRICAL)

JUNE 2007

APRIL 2009

DY. MANAGER

APRIL 1994

MAY 2007

ASST ENGINEER

JAN 1992

APRIL 1994

OPGC LTD/AES 1740MW

Jindal Power Ltd, Tamnar

GMR Kamalanga Energy Ltd, Dhenkanal

Adani Power Ltd, Mundra

Lanco Amarkantak Power Ltd,Korba

Odisha Power Generation Corporation Ltd

Grid Corporation of Odisha

Skills

Communicator

Thinker

Collaborator

Innovator

Intuitive

Team Leader

Education

First Class B.E.(Electrical), IGIT Sarang, Utkal University in the year 1991.

26 weeks Graduate Engineers (Thermal) Programme at NPTI, Neyveli. (PETS)

Chartered Engineer

Training & Certifications

2 weeks training on 210 MW simulator for Operation at NPTI,Badarpur, India.

3 Month power plant (Electrical) Training IN CHINA

15 days relays setting & protection training at CHINA

5 days special training at ABB Switzerland

15 days Excitation/LCI training at BHEL, Bangalore

One week generator protection at ABB Bangalore

One week SCADA training by AREVA, Noida

One week training on generator excitation NTPC, PMI Noida

7 days in house training on Power System Protection by YASH CONSULTANCY.

5 days training on Boiler Performance Optimization by NTPC, PMI, Noida.

3 days seminar on Transformer Organized by APTA, Hyderabad

5 days advanced First Aid Training by Multi Disciplinary Center on safety, health & environments.

Work shop on Total Productive Maintenance by IIPM, Kansbahal

Date of Birth- 18/01/1969

Key Result Areas

Commissioning, testing of 2X660MW and O&M of 2x660 and 210MW to achieve my organisation Goal.

Taking the leadership role for smooth operation of Esteem Organisation, by take care of day to day maintenance with proper strategic planning, motivation, Can do approach and converting team into a royal ideal family to achieve the same in a time bound period

Taking leadership role over from Construction team to O&M team

Responsible for all statutory clearance for unit light up, synchronization and up to completion of COD.

Establish safety & statutory compliance in line with Global AES EHS standard.

Develop the AMC contracts for O&M team including budgeting.

Budgeting for 10 years AES.

Taking leadership role in team building for O&M.

RisK assessment

OPGC Ltd/AES

Spare parts management & Mandatory Spares Management

Leadership role in engineering review of technical issue and modification, Relay setting calculation and implementation.

SAP Implementation

PM module implementation

Leadership role in getting clearance from GRIDCO, OPTCL, ERLDC, POSOCO,CEA, Boiler Inspector, Factory Inspector and all Govt Official.

Smooth operation of 3400Mw power Plant as HOD Electrical and O&M maintenance of BTG,BOP, Transmission line of 400KV,400KV substation, Mines,Raw water pump house which 60KM away from the plant.

Modification in GRP/HT&LT Switchgear/ESP/IPBD/Transformer/VFD system to avoid spurious tripping and modification hydraulic system of belt drive in CHP and last stage LP turbine cooling system in 250 MW turbine.

Modification in AVR & ABT panel to avoid card failure during DC earth fault.

Relay coordination throughout the plant. Solving Design issue, Planning, monitoring etc.

Inventory management, budgeting, PM, Innovation, Statutory compliance & Cost control.

SAP implementation in 4x600MW unit.

Energy Billing

Taking leadership role to implement world class standard in Safety and Statutory Compliances

Taking leadership role to getting clearance and any type of work related to esteem organisation with CSEB, PGCIL WRLDC, POSOCO,CEA, Boiler Inspector, Factory Inspectors and with all Govt Official.

Design, Engineering, Drawing Approval of 4x350MW unit including transmission line and 400KV substation. LILO, Start-up Power, All Statutory clearance, 33KV Substation, Construction Power, Erection, Testing & commissioning of all equipment’s, Project progress, Start-up power, Coordination with OPTCL, GRIDCO, POWER GRID,CEA,ERLDC,ERPC etc.

Synchronising permission from statutory authorities.

Project L2 & L3 level schedule planning & execution in time.

Annual budget, Coordination & execution with EPC contractor & his Subcontractor.

Erection, testing, commissioning & O&M of 400KV Switchyard, GT,ST .UAT,TG, Boiler,BOP and ALL Switchgear successfully.

Synchronizing of the 1st & 2nd unit successfully with completion of COD.

SAP implementation.

AMC contract finalisation for O&M activities.

Inventory management & budgeting.

Implementation ISO18000.

Smooth completion, commissioning, testing & Synchronization of 330/660 MW unit generator & 400KV, 220 KV switchyard with its all auxiliary like HT/LT swgr, motor, actuators,Esp,TG & Boiler, Transmission lines etc.

Resolving the major hot spot problem by realignment of isolators, replacement of the conventional aluminium into single piece copper isolators.

Replacement of Porcelain Insulator by silicone insulators, CT clamps, and ordinary bolt by hot rolled SS BOLT.

Resolving the excitation problem by appropriate setting of under excitation & PSS.

T Breaker Control & Protection Ckt to put in transfer bus Breaker.

Modification of G

Preparation of spares management & inventory management.

Implementation of preventive/predictive maintenance & CBM based maintenance practice

Completion of erection, commissioning, testing, charging & O&M of 400KV switchyard system

Completion of erection, commissioning, testing of Generator(300MW), Excitation system, & Generator Protection system

Completion of erection, commissioning, & testing & charging of 400KV Generator Transformer & Unit aux. Transformer Smoothly Completed erection, commissioning, testing & charging of ESP(EPIC-III) Smoothly Completed erection, commissioning, & testing all type electrical actuators like SIPOS,ROTOK,AUMA & LIMITORQUE

Completion of erection, commissioning, & testing & charging of 1250AH battery bank, 550Ah battery bank, 340AH battery bank & their battery charger.

Completion of erection, commissioning, testing & charging of 400KV Station Transformer.

Completion of erection, commissioning, testing & charging of HT/LT Switchgear Supplied by AREVA & Control & Switchgear

Managing the project from the engineering to commissioning stage

Design/engineering review, procurement and installation activities of Plant Electrical Packages and its timely completion.

Dealing with consultants, vendors and others for compliances and conformances.

Calibration, testing & commissioning activities of 2x300 MW Plant Electrical Packages by maintaining appropriate safety and quality measures.

Preparation of Mandatory spares parts & additional spares parts & its Procurements.

Major overhauling of Generator transformer & Generator, 7 Nos of Annual overhauling of HT/LT Motors, & HT/LT Switchgear.

Successfully erection, commissioning & maintenance of the VFD System in Seal Air Fan.

Member of the Heat rate task force at Ib Thermal power station.

Member of technical committee to review and suggest the Standard Operating Procedure (SOP), Standard Maintenance Procedure (SMP) for EMS: ISO 14001 & Safety: OSHAS 18001 Certification and also a certified IMS internal auditor.

Implementation task force member for Work Permits & confined space permit, QC, 5S’, STOP (Safety Training Observation Program – DuPont) Program.

Team member of QIP (Quality Improvement Project) for Milling System & BFP reliability study and enhancement of equipment reliability & availability.

Impart departmental training to non-executives for operational work in turbine area (Hydrogen purging, CO2 Filling, N2 filling, Stator water flushing etc.), boiler area & ash handling area for better performance and system reliability.

Team leader of quality improvement team of Electrical Maintenance to enhance the reliability & efficiency of the equipments.

Team leader of 5S team to implement 5S in Electrical maintenance Dept. & also the safety & OHSAS coordinator.

O&M of 220 KV /132/33 KV Switchyard

Erection, commissioning, testing, maintenance & charging of 33KV Substation.

Erection, commissioning, testing, maintenance & charging of 11KV Substation.

Erection & maintenance of 33KV Line & 11 KV overhead lines.

The information furnished above is true to the best of my knowledge and belief.

Place: -Banaharpali

Binod Kumar Sahoo

Date-19/10/2020

Signature



Contact this candidate