CURRICULAM VITAE
S.VANNIAPERUMAL
Phone No. : +919*********,
Email: adhtnz@r.postjobfree.com
Skype ID:vanniaperumal.raj
Commissioning, Operation and Maintenance Execution
Of Thermal and Gas Power Plants.
Career objective:
•To play a challenging creative role with a commitment to company excellence.
•To grow along with the organization and become a leader of the repute by effectively contributing the goals of organization.
Total Experience : 13 years
Present Employer
Indian Oil LNG Pvt. Ltd., Ennore, Chennai.
LNG gas CPP Shift Engineer O&M.
Past Employer #1:
M/s Surya Dev Alloys And Power Pvt, Ltd., Gummidipoondi
160MW Coal Based Thermal Power Plant CCR Operation and Maintenance
Past Employer #2:
M/s Hyundai Heavy Industries Co. Ltd., Saudi Arabia
4*720MW CCR OPERATOR
Super Critical Power Plant
Past Employer #3
M/s BGR ENERGY SYSTEM LTD.,
2*660MW Super Critical Boiler Commissioning NTPC Solapur.
Past Employer #4
M/s THERMAX LTD., B&H Group,
160MW,70MW power plant Commissioning and Operation.
Past Employer #5
M/s. CETHAR ltd., Trichy
AFBC,CFBC and WHRB boilers and Power Plant Commissioning Engineer.
Present Employer:
CONCERN : Indian Oil LNG Pvt. Ltd.,
Designation : Shift Engineer – CPP Operation
FROM : December -2019 to November 2020
Job Responsibility:
Gas Engine operation, Cold, Hot and Warm light off for Gas Engine
Responsible for field and SCADA and PLC operation in CPP.
Handle emergency situation of desk operation confidently and continuous monitor parameters of desk operation.
Control and maintain auxiliary equipment, such as Engine, pumps, compressors, cooling towers, heat exchangers, filters, lubricants, air, and auxiliary power.
Make adjustments or minor repairs, such as tightening gland and pipe joints; report any need for major repairs
Monitor and inspect power plant equipment and indicators to detect evidence of operating problems
Regulate equipment operations and conditions such as water levels based on data from recording and indicating instruments or from computers.
RMS maintenance of CPP & its Auxiliaries
CPP Operation with Island mode and regulate equipment operations according to the LNG process.
Maintain Spares for Power and plant and BOP Equipment’s.
To prepare Sop’s, Daily progress report, Defective report, Trip report for CPP.
Past Employer #1:
CONCERN : M/s Surya Dev Alloys And Power Pvt, Ltd.,
Designation : Senior Engineer – Operation and Maintenance
CAPACITY : 160MW (CFBC Boiler coal fired )
FROM : December -2017 to December 2019.
Job Responsibility:
Boiler operation, Cold, Hot and Warm light off for BTG.
Responsible for field and DCS operation of BTG
Handle emergency situation of desk operation confidently and continuous monitor parameters of desk operation.
Control and maintain auxiliary equipment, such as boilers, pumps, fans, compressors, cooling towers, condensers, feed water heaters, filters, and chlorinators, to supply water, fuel, lubricants, air, and auxiliary power.
Make adjustments or minor repairs, such as tightening gland and pipe joints; report any need for major repairs
Monitor and inspect power plant equipment and indicators to detect evidence of operating problems
Regulate equipment operations and conditions such as water levels based on data from recording and indicating instruments or from computers.
To prepare Sop’s, Daily progress report and Defective list for CPP.
To complete maintenance and Shut down work in boiler such as tube failure, thickness mapping, and shutdown inspection.
Past Employer # 2:
Concern : M/s Hyundai Heavy Industries Co. Ltd.,
Designation : Boiler DCS/CCR OPERATOR
Period : June 2016 to June 2017
Project Details:
SL.NO
NAME OF THE PROJECT
CAPACITY
1
AL Shuqaiq Steam Power Plants (SEC)
2880MW (4*720MW)
AL Shuqaiq, Saudi Arabia (Super Critical)
Plant Details:
1)Boiler : 4*2214 TPH,256barg, 5400CMitsubishi Hitachi Super Critical Sliding Pressure Operation Once Through Boiler,DFO and HFO tangential firing
2)DCS : Emerson Ovation
3)Turbine :4*720MW,250barg,537.20C,
Re-heat –47bar, 5390C
4)Generator : Hydrogen cooling,Sealing oil system, Stator water cooling
5)Cooling System : Open cycle
6)TG Make : GE, German
Job Responsibility:
P & I dwg,pressure parts and pipeline supports drawing checking for before boiler light up
Pre-Commissioning of Plants and its auxiliaries as per manufacture’s specification
Rectifying the practical problems rising in pre commissioning of boiler and all rotary equipment’s.
Executions Oil flushing for rotary equipment’s such as RAPH, Axial fans
Execute the rotary equipment Pre-Commissioning & Commissioning Activities such as Axial Fan, Rotary APH, Turbine and Compressor.
Execute the Card Board bursting in HFO & LDO line
Execute the Air Tightness Test(ATT) for Duct
Executions of chemical cleaning as per procedure
Execute the boiler hot & Cold clean-up
Observing proper operation and feedback signals through DCS for all equipment’s
Expertise the Super Critical plant light Up
Control and maintain auxiliary equipment, such as boilers, pumps, fans, compressors, cooling towers, condensers, feed water heaters, filters, and chlorinators, to supply water, fuel, lubricants, air, and auxiliary power
Expertise in Start-up Cold & Hot Circulation process of Condensate (CEP, Ejector, GSC, LP heaters), Feed water(Deaerator, HP heaters)& boiler water systems
Kept in service and monitor Auxiliary steam system, Deaerator initial heating, gland steam system line up, Vacuum pulling(Ejector System)
Expertise in start-up for Air and Flue gas system (ID,FD & GR fans)
Expertise in Start-Up and kept in service for SCAPH system
Expertise in DFO & HFO system taking in Service
Expertise in start-up of Furnace Purge
Expertise in start-Up of DFO & HFO leak test
Expertise in HFO heating process and start-up of steam tracing system
Expertise in Boiler burner Light- OFF
Expertise in line up and start for Boiler circulation Pump and observing proper operation
Expertise in maintaining the Water separator level and controlling the Water separator drain control valve(WDC) in auto and manual mode
Expertise in HFO Burner Change Over
Expertise in feed control valves change over and keep in auto mode depends on load
Ensure the Steam purity and give the clearance for TG rolling
Expertise in boiler operation in various mode such as Boiler Manual, Boiler Input demand (BID)
Expertise in Plant normal operation in Initial Pressure control mode
Expertise in safe shutdown for boiler feed water, steam, air and flue gas system, fuel firing, and condensate system.
Past Employer #3:
Concern : M/s BGR ENERGY SYSTEM LTD.,
Designation : Senior Mechanical Engineer (COMMISSIONING)
Period : October 2015 To June 2016
SL.NO
NAME OF THE PROJECT
CAPACITY
1
NTPC SOLAPUR SUPER THERMAL POWER PLANT
1320MW (2*660MW)
Plant Details:
1)Boiler : 2*2100 TPH,267barg, 5680C Hitachi Super Critical Sliding Pressure Operation Once Through Boiler, Coal Firing,Opposite firing.
2)DCS : Hitachi
3)Fan : Axial fans Howden
4)RAPH : Alstom
Past Employer # 4:
Concern : M/s THERMAX LTD., B&H Group,
Designation : Senior Mechanical Engineer (COMMISSIONING)
Period : May 2013 TO OCT 2015
COMMISSIONED PROJECTS:
SL.NO
NAME OF THE PROJECT
PERIOD
CAPACITY
1
M/s Surya dev Alloys Pvt. Ltd., Gommidipundi Tamilnadu 2*80 MW
2014 May to OCT 2015
2*330 TPH 95 ksc, 5450C Coal fired IR-CFBC boiler
2
M/s WELSPUN POWER LTD., Gandhidham, Gujarat
Two Month (March 2015 To May 2015)
350Tph 100 ksc,5450C Coal fired IR-CFBC boiler
3
M/s DCW Tuticorin tamilandu
Nov 2013 to Jan 2014
56TPH AFBC Bed plate type
4
M/s SHREE SHYAM ISPAT
Aug 2013 to Oct 2013
50TPH Bottom Hopper AFBC Boiler Coal fired
5
M/s ILC Iron and Steel Ltd.,
May 2013 to Jul 2013
17MW AFBC Bottom Hopper Boiler coal fired
Job Responsibility:
Pre-commissioning & Commissioning for various types of power plants such as CFBC,AFBC.
P & I dwg,pressure parts and pipeline supports drawing checking for before boiler light up
Pre-Commissioning of Plants and its auxiliaries as per manufacture’s specification.
Execute the Air Tightness Test(ATT) for Duct
Execute the no load trail & Load trail for all rotary equipment’s.
Execute the Pre-commissioning & Commissioning for boiler Feed water pump.
Executions of refractory dry out as per procedure and observe the expansions
Executing alkali boil out as per procedure to remove foreign matters and oil content in water as per required measurements (in PPM)
Execute the chemical cleaning activities as per procedure
Carry out steam blowing process with recommended pressure and temperature up to acceptable steam quality
Checking of entire spring supports (sliding, fixed) as per supplier’s specification and Buck stay for proper expansion
Inspecting of boilers and all rotary equipment’s, while commissioning such as Bearing lubricant & Temperature, cooling water systems, vibrations, etc
Observing proper operation and feedback signals through DCS for all equipment’s
Expertise in line up for rotary equipment’s lube oil system
Expertise in commissioning, Start-Up and kept in service for SCAPH system
Expertise in start of HP & LP bypass valve and observing proper operation
Ensure proper operation and maintenance of boiler in load condition and kept in observation
Expertise for safety valve floating.
Executing Soot blowing system (LRSB &RSB) commissioning activities were done.
Daily and weekly progress reports were send, while boiler commissioning.
Planning the erection &commissioning activities and make work schedule for the erection & commissioning team.
Preparation of action plan, attending customer complaints.
To Attend daily Customer & Vendor meeting While Plant Commissioning
Planning and scheduling planned and unplanned work.
Maintain Documents at site for while commissioning & Plant stabilization
Make the Protocols for after commissioning of all individual equipment’s.
Make the Schedule for Shutdown Jobs & complete the jobs at scheduling time.
Past Employer # 5:
Concern : M/s. CETHAR ltd., Trichy
Designation : Junior Engineer Commissioning
Period : May 2008 to Sep 2012
COMMISSIONED PROJECTS:
SL.NO
NAME OF THE PROJECT
PERIOD
CAPACITY
1
M/s Monnet ispat steel ltd.,
Raigarh,C.G. 90 MW
2008 May to 2009 December
2*120 TPH, 86 KSC 515 0C Coal fired AFBC boiler
2
M/s Inderjit Infrastructure ltd., wardha (80 MW)
2010 January to 2010 July
4*90 tph, 79 ksc, 5100 C Coal fired AFBC boiler
3
M/s orient cement ltd., devapur,(A.P.) 2*25 MW
2010 July to 2012
January
2*114 TPH, 89.46 KSC, 5200C Coal fired CFBC boiler
4
M/s STEEL AUTHIORTY OF INDIA,SALEM
2012 February to 2012 September
30 TPH coal fired AFBC boiler Process. EPC husk fired
Educational Profile:
Course / Degree
Institution / University
% of Marks
Year of Passing
B.TECH
Rajasathan Opern University
Correspondence course
Final Year
D.M.E., (MECH)
V.S.V.N.POLYTECHNIC College, Virdhunagarkamaraj University Madurai.
85.25%
with
Distinction
April ‘2008
SSLC
St.Mary’s.Hr.sec.school,
Vickramasingapuram
81.6%
April ‘2005
Computer Knowledge:
Packages : MS Word, Ms Excel, MS PowerPoint, AUTO CAD 2003
Certifications:
2nd Class Boiler Attendant in Tamilnadu.
Personal Profile:
Father’s Name : Mr. V. SIVARAMAKRISHAN
Date of Birth : 26th JUL 1990
Nationality : Indian
Sex : Male
Marital Status : Married
Languages known : Tamil, English, Hindi, &Tenglu
Permanent Address : No.9a, Ramasamy Street,
Sengottai, Thirunelvelli – 627809.
Mobile: +91-960*******
PASS PORT DETAIL:
Name : VANNIAPERUMAL
Passport no. : K860916
Date of issue : 02/11/2012
Date of expiry : 01/11/2022
References:
1. Mr.Shanmugavalliappan, 2.Mr.A.Thiagarajan Asai Thambi
Manager/Commissioning Manager/Commissioning,
M/s ISGEC ltd.,(IJT) M/s Thermax ltd.,
Chennai,Tamilnadu Pune, Maharashtra
Mobile: +91-989******* Mobile: +91-841*******
Declaration
I hereby declare that the particulars above by me are true to the best of my knowledge and belief.
Yours truly,
Place : Chennai
Date : 26/10/2020 (S.VANNIAPERUMAL)