CURRICULUM VITAE
Personal details
Name : BOOPATHI RAJ.P
Date of Birth : 04/05/1993
Nationality : Indian
Sex : Male
Marital Status : Married
Blood Group : O ‘+‘ve
Languages Known:
English, Malayalam,Hindi,Tamil & Sourashtra
Passport Details:
Passport No. : M1843352
Place of Issue : Madurai
Date of Issue : 21.08.14
Expiry Date : 21.08.22
Permanent Address:
14/23, Srinivasa Perumal Koil Street,
Kamarajar Salai,
Madurai-625009
TAMIL NADU
INDIA
Objective
With an experience in the field of Testing and Commissioning of power system products, I look forward for an opportunity to display my skills in the field of Testing, commissioning, Operation & Maintenance and Execution of projects related to power systems
Professional Details
Professional Qualification:
Bachelor Of Electrical & Electronics Engineering.
Institute : Sethu Institute Of Technology
Duration : June ’2010’ to March ’2014’
Career Profile
Gulf Experience
Organization : Excel Electrical Installation WLL,Bahrain.
Previous : Gulf Genuine Power LLC, Muscat,Oman.
Designation :1) Project Coordinator,
2)Electrical Testing&CommissioningEngineer,
TotalExperience : 6 Years
Software skills
Languages : C, C++, JAVA
Applications : MS Office, MS Excel
Skill Set
Having an experience and knowledge in Testing, Commissioning and of power plant, substation process plant, Co-ordinating the testing kit and man power for whole project. And also having wide knowledge in Switch gear.
BOOPATHI RAJ. P Mobile : +91-960*******
Email: adhtbm@r.postjobfree.com Home : +91-880*******
adhtbm@r.postjobfree.com
Nature of work
Testing and commissioning of all types of switch gear equipments such as Current Transformer, Voltage Transformers,Circuit Breaker, Isolator, Earth Switch and Lighting arresters, Transformer, Unit Transformer, Capacitor banks, Ring Main Unit (RMU), Bus Earthing Truck (BET)
Skilled in all types of scheme checking such as switchgear functional schemes, Bus synchronizing operation, capacitor bank stage controls and interlocks and other control circuit schemes with various systems
Inspection and commissioning of control and relay panel, preparation of Test Report for all equipments in Switch gear sub-station.
Testing and Commissioning of control & relay Panel for Transformers, Bus Coupler and Line feeder.
Testing of CT, PT, Circuit breaker, Isolator, switch gear and Power Transformer.
Tesing of Cables and Busbar [Hi-Pot test]. Experienced to do HV Test for Power Cables and Bus bars rated up to 33kV
Team handling, Co-ordination with client and team members.
Trouble shooting of all Electrical circuits, control and protection circuits.
As-Built Scheme drawing submission, test report submission.
.As-built cable schedule submission and all site activities to satisfy the customer.
Preparing test protocols for substation equipment & obtain customer approval.
Checking of various equipment schemes and Co-ordination with client in as Built Scheme drawing submission, test report submission.
Test kit familiarity
Omicron CMC356,256
Omicron CT Analyzer
FREJA Secondary injection kit
High voltage kit dc hipot 0-100 KV, AC High Voltage (VLF) kit
Contact Resistance kit- T& R, SCOPE
Multifunction CT, PT test kit- Omicron CPC 100
Insulation Resistance Tester – MEGGER, KYORITSU, FLUKE
Primary current injection Kit – Megger PCITS2000/2 - 2000 A
CB Timing Test Kit scope..
Overseas Project Details:
1.ALBA (Aluminium Bahrain) Line-6 Expansion Project, Bahrain.
Customer : ALBA (Aluminium Bahrain)
Client : SIEMENS WLL
ALBA LIVE STATION PERMIT HOLDER:
Alba conducted interview and selected me as a competent person to work and they allowed me to work All live substation (Brown field area).
SH9(220KV),SH7(33KV),SH5(132KV),SH6(220KV),SH4(33KV),SH1,SH2(11.5KV),CR3 these all the live substation in ALBA under LINE-6 project
a)SH7 : 33KV CT,VT Testing, GIS,CRP Panel scheme checking, CT,VT secondary injection, 120 MVA Transfomer stability test & commissioned successfully.
b)SH9 : 220 KV CT,VT Testing, LCC & protection panel scheme checking, CT,VT secondary injection, reactor stability test, co-ordinating with SCADA & check signals & commissioned successfully.
c)SH1 : Adding 4 numbers of 60 MVA Trafo tested and commissioning process going on & isolator modification done and tested & commissioned.
d)SH2 : Isolator modifaction done tested and commissioned successfully.
e)SH6 : R96A,R96B 450 MVA series reactors commissioned successfully. R96C & D testing going on.
f)SH5 : TIB95A,TIB95B testing all completed & energized .
g)LVAC : 415V LVAC, DCDB battery charger tested and commissioned successfully.
h)CR3 : Manual control panel, manual syncro panel wiring and testing.
2.AL-Hassan Switchgear Manufacturing Company,Muscat,Oman.
MV and LV panels tested and commissioned successfully.
3.33KV Live primary Substation, Khasab,Musandam Governate,Oman.
Customer : Rural Area Electricity Company(RAECO)
Client : Saudi National Contracting Company (SNCC)
4.LOA( Limit of Access) Permit Holder: 33KV Control and Relay Panel (CRP) installed, Cable Layed, Cable Termination under supervision in Live primary substation.
33KV Control and Relay panel Control Cable scheduled and tested Successfully.
5.132KV Gas Insulated Switchgear (GIS),Khasab, Oman.
Customer : Rural Area Electricity Company ( RAECO)
Client : Saudi National Contracting Company (SNCC)
132 KV GIS Control Cable Schedule prepared and checking Succesfully.
6.33KV/11KV Substation, Al Suwaiq, Al Batinah Governate,Oman.
Customer : Mazoon Electricitiy Company (MZEC)
Client : Eastern Overseas LLC (EOS)
33KV,11KV switch gear,Control and Relay panel, LT and HT Cable tested and commissioned successfully
7.11KV Switchgear, Adam Airport, Typoon facility project.
Customer : Ministry of Defence (MOD)
Client : Lasern and Toubro Oman LLC
11KV Panels CT,VT, Breaker,Busbar,and all individual equipments tested and commissioned successfully
Ring Main Unit (RMU) tested And commissioned successfully.
LV (415V)panel tested And commissioned succesfuly.
Capacitor bank tested and commissioned successfully.
33KV,11KV intertrip done successfully and intertrip checked and appreciated by client.
8.11KV Switchgear, DUQUM, Permanent Accomodation of contractors project.
Customer : Rural Area Electricity Company (RAECO)
Client : Al Raffa trading and contracting LLC
11KV Panels CT,VT, Breaker,Busbar,and all individual equipments tested and commissioned successfully
9.PDO Project, Central Processing Facility (CPF) at Khazzan site project.
Customer : British Petroleum (BP)
Client : Petrofac and CCC (Consolidated Contractors Co LLC)
33KV Cables and 3.3KV Cables both AC(VLF kit) and DC HI-POT test completed scccessfuly.
10.Al Assar Switchgear manufacturing company
11KV Panels functional checked, Interlocks checked and hi pot test successfully completed
11.11KV Switchgear, Adam Airport, Typoon facility project.
Customer : Ministry of Defence (MOD)
Client : Lasern and Toubro Oman LLC
MCC panels tested and successfully under witness of CML ( Commissioning Management Company)
12.EPC Construction of NEW KHASAB POWER STATION 6 x 13.265 MW in Musandam Governorate project.
Customer : Rural Area Electricity Company (RAECO)
Client : Al Jood Trading & Contracting LLC
Generator to GCP ( Grid control panel), CCP ( common control panel),132 KV Grid wiring ( status checking)and testing.
Generator CT VT Equipments, NCT, Stability test for DG & Transformer
completed successfully.
13.6.6 KV Switch gear at STP (Sewage water treatment plant) GALA, AL ANSAB
Customer : HAYA ( Oman waste water service company)
Client : 1) Doosan heavy industries & construction Co LLC
2) Lasern and Toubro India
6.6 KV Panels CT,VT, Breaker,Busbar,and all individual equipments tested and commissioned successfully
14.PDO (Petroleum Development of Oman) Project, GWES project at Khazzan site project.
Customer : British Petroleum (BP)
Client : VOLTAMP
1600KVA transformer testing and Neutral CT testing completed successfully.
15.33KV/11KV Upgrading Ghadafan PSS in North Batinah Governorate at sohar .
Customer : Majan Electricity Company ( S.A.O.C)
Client : SFO (Sharikat Fanniya Oman LLC)
11KV,33KV Siemens GIS Panels, CT,VT, Breaker,Busbar,and all individual equipments tested and commissioned successfully. 20 MVA Transformer, Capacitor bank, RTCC scheme check, LVAC testing and commissioned successfully.
16.EPC Construction of Network and Substation in MASIRAH in sharquia Governorate
Customer : Rural Area Electricity Company (RAECO)
Client : Arjuwan Shetti Muscat LLC ( ASM)
ControlCable schedule preparing,laying, termination and testing of all equipments.
17.3X 20 MVA Amerath Primary Substation in Amerath Muscat Governorate
Customer : Muscat Electricity Distribution Company (MEDC)
Client : Oman National Engineering & Investments Company ( ONEIC)
ControlCable schedule preparing,laying, termination and testing of 33V,11KV,transformer,capacitor bank equipments.
18.Ibri IPP(Independent Power Plant) in Ibri Governorate
Customer : Ad-Dhahirah Generating Company SAOC
Client : Sepco, Larsen & Tubro Electromech LLC
Transformer,motor,LV panels,cranes,HVAC panel and MV panels,LOTO Scheme testing and Commissioned Successfully.
Domestic Project Details :
19.33KV/6.6KV SubStation, NMDC, Donimalai, Karnataka
Client : HDOL.
6.6KV substation was successfully commissoned, Successfully charged.
Tests done:Interlock check for all feeders,6.6KVSwitchgearEquipments (CT,PT,Busbar,Isolator, Breaker,APFC panel,VFD Panel) test.
20.Neyveli Thermal Power Limited,Tuticorin, Tamil Nadu
Client : BHEL.
Overall commissioning of Electro Static Priciptator ( ESP) panel.
21.BMM ( Bharath Mines and Minerals) Isphat Ltd, Hospet,Karnataka
Client : BMM
Oxygen plant and SMS water plant 11KV and 33KV H.T Panel successfully commissioned and charged, successfully commissioned.
Tests done: 11KV, 33KV,415V LT Panels successfully commissioned and charged.
Achievements
In a short time company promote me as a PROJECT CO-ORDINATOR in current working company.
Got good testing engineer certifactes and prizes from BP( British Petroleum), Petrofac, CCC, L&T Electromech,SIEMES, ALBA & ESBI
Got YUVASRI KALABHARATHY award for Good behavior and Academic Performance.
Award a gold medal from TAMILNADU EDUCATION MINISTER for best academic performance in 10th standard.School Topper Certificated award by MADURAI DISTRICT COLLECTOR.
Department Topper and University Rank holder at SETHU INSTITUTE OF TECHNOLOGY
Leadership Quality
To Coordinate the testing team and testing kit at GULF GENUINE POWER LLC MUSCAT.
Students Coordinator and Class Committee member in Sethu Institute of Technology.
Paper presentation committee member in EESORFEST’ 2013 EEE student association at SIT
Hobby
Singing Devotional song
Astrology
Education
COURSE
INSTITUTION
BOARD/UNIVERSITY
YEAR OF PASSING
MARKS B.E (EEE)
Sethu Institute Of Technology
Anna University
2014
86.00%
HSC
Sourasatra Boys Higher Secondary School
State Board
2010
88.25%
SSLC
Sourasatra Boys Higher Secondary School
State Board
2008
95.6%
Industrial Trainning
Name of the Industry
Duration
Areas of Exposure
TANTRANSCO
7 days
Switching Station (220KV)
AIRPORT
7 days
Communication & Navigation Process
MCNOLD TRANSFORMER
5 days
Making transformers
AAVIN
5 days
Boiler, Packing Process
Co-Curricular activities
Paper presented in National Conference at SCAD College of Engineering, Tirunelveli on “Proof of concept of smart fault current controller with Super Conducting coil using smart grid”.
Achieved Merit certificate in Essay competition held at Sri Rama Krishna Mission at Madurai.
Extra -Curricular activities
Active member in National Service Scheme at Sethu Institute of Technology.
Participated in the one day National level technical symposium on “Recent Trends In Power System” at Sri Krishna College of Engineering Coimbatore.
Participated in State Level Quiz Competition at Vellamal College of Engineering, Madurai.
Declaration
I hereby declare that all the details furnished above are true to the best of my knowledge and belief.
Date : Yours truthfully
Place : (P.BOOPATHI RAJ)