CAREER SUMMARY:

More than 30 years of extensive experience in Quality Assurance and Quality Control management, coordination, engineering, supervision, auditing, actual inspection and expediting. Within this duration,

I have worked on various project scopes as specified in “FIELDS OF EXPOSURE” of this CV.

I have been involved in setting up and maintaining the company’s Quality Management System to the requirements of ISO 9001:2008 standard.

I have conducted, assisted and witnessed various levels of auditing, from Internal Auditing of various processes and procedures to external auditing including Vendors’ Quality Audit as per ISO 9001:2008 standard.

Reviewed pre-qualification of project suppliers, contractor and subcontractors.

Performed audit on suppliers, review and approved quality control, plan and inspection test plan, welding procedures and method of statement.

I have been involved in supervising, compiling, maintaining, reviewing and approval of Manufacturer’s Data Records (MDR).

I have also been involved in bid stage activities assessing and qualifying quality requirements.

I have performed and supervised line checking of various piping system, generated and closed out punch list items prior to Pressure Testing and Reinstatement.

I have been directly involved in various quality participation, from hands-on non-destructive testing including film interpretation, actual welding inspection, material receiving inspection issuing OSD when necessary, painting inspection, vendor inspection and expediting of both work and documentation. Developing and maintaining various quality documents including Quality Plans, Inspection and Test Plans, Method Statements, Technical Queries, Welding Procedures, Welders’ Qualification Records, Registers and working procedures for various construction activities. Issuance and close out of Non-conformance Reports and corrective actions.

I have conducted painting/coating inspection and supervision on various materials in compliance to various supplier standards and project specifications

I have conducted material receiving inspection of various project materials and equipment

I have handled multi-national Inspectors while working in Asia and Australia and have always maintained a proactive approach to work.

TECHNICAL QUALIFICATIONS:

CSWIP 3.2.2 – Level 3 Senior Welding Inspector, T.W.I. Cambridge Abington, UK, certificate no. 91344/2 with film interpretation

ISO 9001:2008 Lead QMS Auditor, Bureau Veritas Malaysia, certificate serial no. LA2/15/MY/54546 (IRCA Certified)

Saudi ARAMCO Qualified Welding Inspector, Doc. no. D4725/D4728/SAOC/QC-118 rev.1 / OPD/L-3652/04

Ultrasonic Testing – ASNT-TC-1A Level 2, (API RP2X – all configuration)

Radiographic Testing – ASNT-TC-1A Level 2, (with film interpretation)

Magnetic Particle Testing – ASNT-TC-1A Level 2

Dye Penetrant Testing – ASNT-TC-1A Level 2

TRAINING & SEMINARS ATTENDED:

IRCA Certified ISO 9001:2008 Lead QMS Auditor Training (Bureau Veritas – Kuala Lumpur Malaysia)

Internal QMS Auditors Course (PERA Neville-Clarke – Singapore)

Management Communication Skills Training (JRMMEI – Dubai, UAE)

Management Leadership Skills Training (JRMMEI – Dubai, UAE)

Time Management Training (JRMMEI – Dubai, UAE)

Trainers’ Training Program (MERALCO Foundation – Makati, Philippines)

Senior Welding Inspector’s Course (The Welding Institute, UAE)

Welding Inspector, Steels (The Welding Institute, Philippines)

Weld Supervisors Training (CB&I – Perth, Australia)

Ultrasonic Testing Phase Array Method Training (PROSAFE/Oceaneering – Singapore)

Non Destructive Training Course Level II in UT, RT, MT & PT (SETSCO, Singapore)

Non Destructive Training Course Level II in UT, RT, MT & PT (Industrial Inspection International – Makati, Philippines)

Working at Heights (SERATA Network – Perth, Australia)

Confined Space Entry (SERATA Network – Perth, Australia)

Man Handling / Oil Spill / Fire (SERATA Network – Perth, Australia)

Safety Orientation Course (SOC) Manhole – (CB&I accredited by Ministry of Manpower, Singapore)

Confined Space Entry Training (JRMMEI – Dubai, UAE)

Advance Safety Auditing (British Petroleum – Vungtau, Vietnam)

Basic Safety Training (IDESS – Subic Base, Philippines)

Hazard, Observation and Communication – HOC (Safety Seminar by Halliburton – Batangas, Philippines)

FIELDS OF EXPOSURE:

ONSHORE

Fabrication of Fired Heaters to Canadian Standards CSA

LNG Plant construction and rehabilitation

Fabrication of Heat exchangers

Coal Fired Power Plant construction and rehabilitation

Petrochemicals Refineries plant construction and rehabilitation

Fabrication of Waste Heat Recovery Unit (WHRU)

Shipbuilding and conversion (FDPSO and FPSO) to classification society rules such as ABS, DNV & Lloyd’s Register and PED Requirements

Ethylene Cracker Complex construction

Construction of Steel Building Structures to AISC and AWS D1.1 Standards

Fabrication of Pressure Vessels to ASME VIII and AS 1210 standard

Construction of storage tanks API 650 standard

Fabrication of jackets, modules, piles and other topside facilities

Fabrication of piping spools to various codes including ASME B31.3 and AS 4041

Assembly of Steel Structures to AS 4100 and AS 1554.1 standards

Calm Buoy Fabrication to DNV standards

Onshore Pipelines installation and rehabilitation to API 1104, DNV-OS-F101 and ASME B31.8

Material Receiving of various project materials to various project specification

Pressure testing of Relief Valves

Factory Acceptance Test of various valves

OFFSHORE

Offshore Installation of pipelines, risers, jackets, modules and other topside facilities to API, ASME & BS/EN standards

Hook-up and commissioning of topside facilities to API, ASME & BS/EN standards

OTHER AREAS OF EXPOSURE

External and Internal Auditing to ISO Standards

Bids and Proposals – assessing, qualifying and costing of quality requirements

Expediting of actual work and documentation to project delivery schedule requirements

Construction supervision

CODE FAMILIARIZATION:

DNV-OS-F101, DNV-OSS-102, DNV-OS-C401, DNV-OS-D101, DNV-OS-E201, AS1554.1, AS 1554.6, AS 4100, AS 4041, ASME I, ASME II, ASME V, ASME VIII, ASME IX, ASME B31.3, ASME B31.8,API 650, API 1104,API RP2A, API RP2X,AWS D1.1, IACS, PED, Shell DEP, Canadian CSA and other Standards

WORK HISTORY:

ONQUEST ENGINEERS – San Dimas CA, USA

Site Quality & Construction Coordinator

IPL/Fluor Propane Hydrogenation Project, Canada – Fabrication of four (4) Fired Heaters 10-FH-4001, 10-FH-4002, 10-FH-4003 & 10-FH-4004. Scope of work includes steel supply, fabrication of heaters structure and stack, refractory supply and installation.

Liaise with client, supervised company and contractor’s Inspectors, and conducted audits on contractor’s quality system application applicable to all disciplines and various work procedures.

Involved in sub-contractors’ pre-qualification audit prior to inclusion.

Ensure that project personnel and equipments qualification/certification are valid and up-to-date as per project requirements

Generated technical queries and method statements for client’s approval.

Reviewed technical queries and method statements from contractor prior to submission to client for approval

Conducted random welding audits to WPS requirements and RT film interpretation to CSA Standards.

Lead root cause analysis and close out of non-conformances, and lead progressive implementation of lessons learned from non-conformances.

Conducted trainings to company and contractor’s project personnel to ensure awareness of project requirements.

Conducted meetings with client, company and contractor’s project personnel to ensure issues are raised, addressed and prevented from recurring.

Lead compilation, reviewing and approval of Manufacturer’s Data Records (MDR).

Work Location: ABOITIZ Fabrication Shop, Balamban Cebu Philippines.

January 15, 2018 to January 31, 2020

ONQUEST ENGINEERS – San Dimas CA, USA

Site Quality & Construction Coordinator

IHI/ELBA Liquefaction Project, Savannah Georgia – Fabrication of two (2) Heating Medium Heaters F-4001 & F-4002. Scope of work includes steel supply and fabrication, coil fabrication, refractory supply and installation.

Liaise with client and contractor’s Inspectors

Ensure that project personnel and equipments qualification/certification are valid and up-to-date as per project requirements

Reviewed technical queries and method statements from contractor prior to submission to client for approval

Conducted random welding audits to WPS requirements and RT film interpretation to AWS D1.1 and ASME B31.3 standards.

Lead root cause analysis and close out of non-conformances, and lead progressive implementation of lessons learned from non-conformances.

Conducted meetings with client, company and contractor’s project personnel to ensure issues are raised, addressed and prevented from recurring.

Involved in reviewing and approval of Manufacturer’s Data Records (MDR).

Work Location: NARA KIC Fabrication – Pohang, South Korea

January 22, 2017 to July 06, 2017

SITESKILLS INTERNATIONAL – Clark Freeport Zone, Pampanga Philippines

Quality & Construction Superintendent

South Pacific Employment Institute (SPEI) Safe Live Process Plant project (SLPP1) – Fabrication of 1 unit SLPP including steel structure, piping and pressure vessels fabrication and installation.

Supervised Inspectors and conducted actual welding inspection and RT film interpretation.

Conducted random welding audits to WPS requirements and RT film interpretation to AWS D1.1, ASME VIII and ASME B31.3

Supervised welders’ qualification tests

Supervised/conducted actual line checking of various piping system, generated and closed out punch list items prior to Pressure Testing and Reinstatement.

Conducted inspection at various vendor suppliers

Compiled, reviewed and approved reports for the Manufacturer’s Data Records (MDR).

Work Location: Clark Freeport Zone, Pampanga Philippines

October 19, 2015 to December 04, 2016

DANA PETROLEUM UK – Qidong Jiangsu, China

Quality Coordinator

Western Isles Development FPSO Project including Fabrication of Modules, Piping and Installation of Machineries.

Conducted actual welding audits to WPS requirements and RT film interpretation to ASME B31.3.

Supervised/conducted actual line checking of various piping system, generated and closed out punch list items prior to Pressure Testing and Reinstatement.

Conducted inspection at various vendor suppliers inside and outside China.

Work Location: COSCO Shipyard – Qidong Jiangsu, China

December 12, 2014 to December 12, 2015

CB&I KENTZ JOINT VENTURE (CKJV) – Perth WA, Australia

Quality Coordinator

Chevron’s GORGON Project Fabrication and assembly of welded and bolted Steel Structures, fabrication and installation of Propane Storage Tank piping system, and fabrication and hydrostatic testing of Hook-up spools.

Supervised Inspectors and conducted actual welding inspection and RT film interpretation.

Conducted actual bolt tightening inspection cross checks

Conducted random welding audits to WPS requirements and RT film interpretation to AWS D1.1 and ASME B31.3

Witnessed welders’ qualification tests

Supervised/conducted actual line checking of various piping system, generated and closed out punch list items prior to Pressure Testing and Reinstatement.

Conducted inspection at various vendor suppliers

Reviewed and approved reports for the Manufacturer’s Data Records (MDR).

Work Location: AMC Yard & CIVMEC Assembly Yard – Henderson WA, Australia

February 07, 2013 to October 31, 2014

AUSCLAD GROUP (AGC) – Kwinana WA, Australia

Quality Coordinator

Fabrication of spools for Chevron’s Gorgon LNG Project, Barrow Island Australia

Supervised Inspectors and conducted actual welding inspection and RT film interpretation to ASME B31.3.

Conducted random welding audits to WPS requirements.

Generated technical queries and method statements for client’s approval.

Supervised line checking of various piping system, generated and closed out punch list items prior to Pressure Testing and Reinstatement.

Conducted meetings with company’s project personnel to ensure issues are raised, addressed and prevented from recurring.

Reviewed and approved reports for the Manufacturer’s Data Records (MDR).

Work Location: AGC Fabrication Shop – Kwinana WA, Australia

November 18, 2011 to February 06, 2013

ONQUEST ENGINEERS – San Dimas CA, USA

Site Quality & Construction Coordinator

Chevron’s Gorgon LNG Project BWI Australia, six (6) - Waste Heat Recovery Units (WHRU) Construction Project

Liaise with client, supervised company and contractor’s Inspectors, and conducted audits on contractor’s quality system application applicable to all disciplines and various work procedures.

Involved in sub-contractors’ pre-qualification audit prior to inclusion.

Ensure that project personnel and equipments qualification/certification are valid and up-to-date as per project requirements

Generated technical queries and method statements for client’s approval.

Reviewed technical queries and method statements from contractor prior to submission to client for approval

Conducted random welding audits to WPS requirements and RT film interpretation to AWS D1.1 and ASME B31.3.

Lead root cause analysis and close out of non-conformances, and lead progressive implementation of lessons learned from non-conformances.

Conducted trainings to company and contractor’s project personnel to ensure awareness of project requirements.

Conducted meetings with client, company and contractor’s project personnel to ensure issues are raised, addressed and prevented from recurring.

Lead compilation, reviewing and approval of Manufacturer’s Data Records (MDR).

Work Location: Metaphil Yard – Cebu, Philippines

February 02, 2010 to October 15, 2011

SHELL EASTERN PETROLEUM PTE LIMITED – Singapore

Inspection Engineer (Mechanical & Piping)

Pulau Bokum Ethylene Cracker Complex construction Project

Supervised contractor’s Inspectors, and conducted audits on contractor’s quality system application applicable to all disciplines and various work procedures.

Conducted welding audits to WPS requirements, actual welding inspection and RT film interpretation to ASME VIII and ASME B31.3.

Involved in root cause analysis, close out of non-conformances, and progressive implementation of lessons learned from non-conformances.

Performed line checking of various piping system, generated and closed out punch list items prior to Pressure Testing and Reinstatement.

Reviewed and approved reports for the Manufacturer’s Data Records (MDR).

Work Location: Pulau Ular, Singapore

October 06, 2008 to January 30, 2010

PROSAFE PRODUCTION PTE LIMITED – Singapore

Site Quality Assurance Lead

Refurbish and Conversion of AZURITE FDPSO Proj. including fabrication and installation of Topside Modules

Liaise with client, supervised company and contractor’s Inspectors, and conducted audits on contractor’s quality system application applicable to all disciplines and various work procedures.

Involved in sub-contractors’ pre-qualification audit prior to inclusion.

Ensure that project personnel and equipments qualification/certification are valid and up-to-date as per project requirements

Generated technical queries and method statements for client’s approval.

Reviewed technical queries and method statements from contractor prior to submission to client for approval

Conducted random welding audits to WPS requirements and RT film interpretation to AWS D1.1, ASME VIII and ASME B31.3.

Lead root cause analysis and close out of non-conformances, and lead progressive implementation of lessons learned from non-conformances.

Conducted trainings to company and contractor’s project personnel to ensure awareness of project requirements.

Conducted meetings with client, company and contractor’s project personnel to ensure issues are raised, addressed and prevented from recurring.

Lead compilation, reviewing and approval of Manufacturer’s Data Records (MDR).

Work Location: Keppel Shipyard – Jurong, Singapore

August 27, 2007 to October 04, 2008

J.RAY MCDERMOTT – Dubai, United Arab Emirates

Vendor Coordinator/Expeditor

RELIANCE Fabrication of Pressure Vessels, Heat Exchangers and Rectangular Storage Tanks Project

Supervised contractor’s Inspectors, and conducted audits on contractor’s quality system application applicable to all disciplines and various work procedures.

Conducted welding audits to WPS requirements, actual welding inspection and RT film interpretation to ASME VIII.

Involved in root cause analysis, close out of non-conformances, and progressive implementation of lessons learned from non-conformances.

Performed progressive and final inspection, generated and closed out punch list items prior to Pressure Testing and Reinstatement.

Expedite document submission and actual work progress to project schedule requirement

Reviewed and approved reports for the Manufacturer’s Data Records (MDR).

Work Location: PETRA Fabrication Shop – Shah Alam, Malaysia

February 01, 2007 to August 20, 2007

PROSAFE PRODUCTION PTE LIMITED – Singapore

Vendor Quality Coordinator/Expeditor

POLVO and UMUROA FPSO Projects including fabrication and installation of topside modules

Supervised contractor’s Inspectors, and conducted audits on contractor’s work procedures.

Conducted welding audits to WPS requirements, actual welding inspection and RT film interpretation to ASME VIII and ASME B31.3.

Involved in root cause analysis, close out of non-conformances, and progressive implementation of lessons learned from non-conformances.

Performed line checking of various piping system, generated and closed out punch list items prior to Pressure Testing and Reinstatement.

Expedite document submission and actual work progress to project schedule requirement

Reviewed and approved reports for the Manufacturer’s Data Records (MDR).

Work Location: Keppel Shipyard – Jurong, Singapore

August 27, 2006 to January 30, 2007

OTHER PROJECTS:

PT GEOCEAN – Jakarta, Indonesia

Sr. QA/QC Engineer

26ӯ Export Trunk line Severe Sour Service for TOTAL INDONESIE Sisi-Nubi installation Project

Work Location: Jakarta, Indonesia

March 28, 2006 to August 21, 2006

J. RAY MCDERMOTT – Dubai, United Arab Emirates

Senior Quality Control Inspector

DOLPHIN ENERGY LIMITED (DEL) Process Decks and Jackets fabrication Project

Work Location: McDermott Yard JAFZ – Dubai, United Arab Emirates

July 2004 to March 27, 2006

J. RAY MCDERMOTT – Dubai, United Arab Emirates

Senior Quality Control Inspector

Al Khafji Joint Operations (KJO) – IWJ2 & IWJ3 Decks and Jackets fabrication Project

Work Location: McDermott Yard JAFZ – Dubai, United Arab Emirates

May 06, 2004 to March 27, 2004

MCDERMOTT CASPIAN CONTRACTORS INCORPORATED – Baku, Azerbaijan

Senior Quality Control Inspector

Azerbaijan International Operating Company / BP West Azeri Modules and Pipelines fabrication Project

Work Location: AIOC Yard – Baku, Azerbaijan

March 02, 2004 to May 05, 2004

SINGLE BUOY MOORING (SBM) – Dubai, United Arab Emirates

Vendor Quality Coordinator/Expeditor (Structural and Piping)

(SNEPCO) BONGA Buoy - Turn Table and Bearing Support Structure fabrication Project

Work Location: LAMPRELL Yard JAFZ – Dubai, United Arab Emirates

Structural Inspector

Conversion and Refurbishment of FPSO ATLANTIC and FPSO MYSTRASS Projects

Work Location: Dubai Dry-docks – Dubai, United Arab Emirates

July 2002 to February 2004

BRITISH PETROLEUM – Vietnam

Inspector (Structure & Piping)

Nam Con Son Terminal and Pipeline construction Project

Work Location: Vungtau, Vietnam

July 2001 to July 2002

FOSTER WHEELER PHILIPPINES CORPORATION – Philippines

Quality Assurance/Quality Control Supervisor

Philippines Shell Petroleum Corporation (PSPC) Malampaya Onshore Gas Plant construction Project

Work Location: PSPC Refinery – Batangas, Philippines.

February 2001 to July 2001

CREST ENGINEERS AUSTRALIA – Vietnam

Quality Assurance Engineer

JVPC Rang Dong WHP N1 Extension Platform Fabrication and Offshore Hook up Project

Work Location: PTSC Yard – Vungtau, Vietnam

July 2000 to October 2000

MC CONNELL DOWELL – Batangas Philippines

Senior QA/QC Inspector

First Gas Power Plant to Shell Pipeline installation Project

Work Location: Batangas, Philippines.

August 1999 to April 2000

OCEANEERING / SOLUS SCHALL – Scotland, United Kingdom

Welding/NDT Inspector

Statoil Asgard Transport Project Phase 2 and Statoil Subsea pipeline installation project

Work Location: ETPM LB200 North Sea – Kristiansand, Norway

British Gas E + P EGA Development

Work Location: ETPM Yard – Rotterdam, Netherlands / ETPM LB200 North Sea – Scotland, United Kingdom

Statoil Asgard Transport Project

Work Location: ETPM LB200 North Sea – Stavanger, Norway

February 1998 to June 1999

BROWN AND ROOT INTERNATIONAL SERVICES – Batangas Philippines

Welding Supervisor

Philippine Shell Petroleum Corporation (PSPC) Gas Turbine No. 3 Construction Project

Work Location: PSPC Refinery – Batangas, Philippines

August 1997 to December 1997

QED INTERNATIONAL SA – Abu Dhabi,United Arab Emirates

Multi Discipline Inspector/Film Interpreter

QGPC PS-1R Platform and Pipeline installation project

Work Location: Qatar Offshore, Qatar

April 1997 to July 1997

IPCO - ASAL JV Seconded by QUALINSPEC INC/OPIS – Kuala Lumpur, Malaysia

Quality Control Supervisor

IPCO - ASAL Joint Venture Pipeline installation Project

Work Location: Perlis, Malaysia

January 1997 to April 1997

QED INTERNATIONAL SA – Abu Dhabi, United Arab Emirates

Welding/Multi Discipline Inspector

Dubai Petroleum Company 20ӯ and 28ӯ pipelines installation project

Work Location: DB27 Barge Dubai Offshore – Dubai, United Arab Emirates

July 1996 to August 1996

QED INTERNATIONAL SA – Singapore

Welding/Multi Discipline Inspector

Yukong Project on board KP1 for the installation of 60ӯ pipeline Project

Work Location: Ulsan, South Korea

ZADCO New Gas Plant Project

Work Location: Zirku Island – Abu Dhabi, United Arab Emirates

TOTAL WP4, WP5 and WP6 jacket and platform Project

Work Location: McDermott DB 51 Derrick Barge – Bongkot, Thailand

December 1994 to February 1996

ATLANTIC GULF AND PACIFIC COMPANY – Batangas Philippines

QA/QC Supervisor

National Power Corp. / Mitsui Engineering Services Power and Fuel Barge Fabrication Project

Work Location: AG&P Yard – Batangas, Philippines

February 1994 to December 1994

OFFSHORE PIPELINE MARITIME INTERNATIONAL– Manama Bahrain

Multi Discipline NDE Inspector

International Petroleum of Bukha Ltd. (IPBL) Platforms and Jackets Fabrication Project

Work Location: Manama, Bahrain

June 1993 to December 1993

AL MUTAWA SAMYONG NDT COMPANYLIMITED – Al Khobar KSA

NDT Inspector

Saudi ARAMCO Abu Ali GOSP and all Northern Area restricted facilities maintenance project

Work Location: Al Khobar, Kingdom of Saudi Arabia

August 1992 to May 1993

INDUSTRIAL INSPECTION INTERNATIONAL INCORPORATED – Batangas Philippines

NDE/Welding Inspector

Black Micro Corp./EE Black Ltd. Project, Saipan Commercial Center.

Work Location: Saipan, USA

NEDRILL Work ship No.1 project annual maintenance shutdown while docked

Work Location: Cebu Shipyard – Cebu, Philippines

Nasipit Lumber Company (NALCO) annual maintenance shutdown

Work Location: Nasipit Agusan del Sur, Philippines

National Power Corporation for the Power House Shutdown project.

Work Location: NPC Power Plant – Calaca, Philippines

Philippine Shell Petroleum Co. (PSPC) for “on call” maintenance projects.

Work Location: PSPC Refinery – Batangas, Philippines

Caltex Refinery Philippines for “on call” maintenance projects.

Work Location: Caltex Refinery – Batangas, Philippines