Over 14 years of experience in pipelines petrochemical, refinery, This includes turnarounds, new construction, capital projects, and fabrication shop’s Knowledge of pipe fabrication, welding processes, welding qualifications and non-destructive testing, and a successful history of interface with field personnel, management, and clients. Involved in interactive planning with all discipline leads to coordinate daily activities to avoid cost and schedule delays. Maintained projects standings, installed quantities and schedules to coordinate system walk downs and turn over’s. Experienced at reading and understanding blueprints, isometric drawings, structural general arrangement, and plant P&IDS. Review specifications, procedures, work schedules and standards for assigned work. Including AWS, ASME B31.1 & B31.3 codes. Maintained a work relationship with craft and supervision in all disciplines as well as developing / maintaining motivated crews through effective employee relations and strong leadership. Have the ability to make judgment calls, solve problems and assume responsibility. Strong background in supervision of many large projects. Excellent leadership, communications and relationship building skills. Elite communicator specializing in conflict resolution, problem solving, and collaborating across functions to ensure operational excellence.

Professional Experience

TKS Industrial Company – Madison Alabama – Mazda/Toyota Automotive Manufacturing

October 2020- November 2020

Site Piping Superintendent

Coordinated, scheduled, and supervised work executed by craft personnel within construction project.

Monitored construction activities to ensure quality and safety standards were adhered to while achieving maximum work efficiency.

Planned and scheduled equipment purchases and rentals. Purchased company provided tools required for pipe fitting and rigging.

Planned and established work schedules, assignments, and production sequences to meet project goals, as well as organized production operations and activities with other departments.

Scheduled material deliveries.

Oversaw system fabrications, installations and layouts for specifications.

Maintain and updated data, such as timeline progress, production, and cost records, and prepare management reports and weekly updates.

Directly support project and construction management with planning and utilization of proper means and methods for all construction activities.

Observing daily work load activities of piping subcontractors, constantly assessing their performances

Working with the engineering department when piping modifications were necessary in the designs

Maintaining a highly professional environment among subcontractors in terms of productivity, deadlines and site safety

Supervising quality of installation, testing and turnover of completed areas.

Communicate changes and document field change notifications.

Document certificates for materials purchased by vendors.

Provide and witness inspection test packages during the course of startup activities.

Handled all field office documentation which included client time sheets, payroll, etc.

Ensure construction is undertaken in accordance with approved drawings, plans and procedures.

Liaise between the project manager and the technical disciplines involved in the project.

Monitor and report progress against contractual milestones.

Develop innovative and practical design solutions to technical problems.

Review and agree on proposals for mechanical completion.

Conduct regular progress and coordination meetings with the contractors.

Provide the detailed construction input and review for the preparation of bid documents and the evaluation of the contractors.

Control cost to set budgets.

North star Energy services – Midland Texas – Enterprise Products/Exxon Mobil Pipeline July 2020 – September 2020

Piping general Foreman

Supervised 5 pipe foreman with each foreman having a crew of 8 to 12 employees (Pipefitters, Rig welders, Crane Operator, Helpers)

Assigned foreman’s with daily critical path items to be completed per priority and per schedule driven deadlines.

Assisted foreman’s with material take off requisitions per bill of material on Isometric drawings.

Managed coordination with other crafts to complete project flawlessly

Reviewed supervisor’s daily progress reports to ensure proper percentages were being met on a daily basis.

Led contractor safety meetings daily to raise the awareness on every individuals mind and instill the safety culture in them.

Assisted foreman and pipefitters in any critical jobs functions as far as Tie ins, hydro test, commissioning.

Coordinated hydro testing dates and tie in dates with operations, engineering, and QA/QC.

Performed internal walk downs with supervisors to ensure system is complete and ready for our QC to walk down and turn over to the client.

Update tracker weekly to show progress on each line fabricated and at what current percentage it is on.

North star Energy services – Mont Belvieu Tx - Enterprise Products October 2019- March 2020

Senior Piping general Foreman

Supervised 5 pipe foreman with each foreman having a crew of 8 to 12 employees (Pipefitters, Rig welders, Crane Operator, Helpers)

Assigned foreman’s with daily critical path items to be completed per priority and per schedule driven deadlines.

Assisted foreman’s with material take off requisitions per bill of material on Isometric drawings.

Managed coordination with other crafts to complete project flawlessly

Reviewed supervisor’s daily progress reports to ensure proper percentages were being met on a daily basis.

Led contractor safety meetings daily to raise the awareness on every individuals mind and instill the safety culture in them.

Assisted foreman and pipefitters in any critical jobs functions as far as Tie ins, hydro test, commissioning.

Coordinated hydro testing dates and tie in dates with operations, engineering, and QA/QC.

Performed internal walk downs with supervisors to ensure system is complete and ready for our QC to walk down and turn over to the client.

Update tracker weekly to show progress on each line fabricated and at what current percentage it is on.

optimized process design (opd)- Mont Belvieu Tx - Enterprise Products April 2019- October 2019

Quality Control lead

Validate all pre-hydro test packages built by the package builders to ensure that all isometric drawings and P&ID’s reflect one another and all correct documents are in the packages.

Assign priority pre hydro test packages to QC Techs to walk down and create punch list items for the field to correct.

Assign post hydro test packages to QC Techs to walk and create punch list for the field.

Validate punch list items created by QC Techs to ensure proper verbage was being used to ensure the field had a clear understanding of what needed to be corrected.

Assist in coordinating all forms of NDE, PT, RT, UT, hydro testing, pneumatic testing & in service testing.

Attend high level meetings to represent the quality control portion of the project / express any ideas that may help push packages over to the client in a timely manner.

Performed PSSR walk through with QA, OPS and engineering to ensure the clients expectations are being met and that each system is 100% completed and ready for start up.

Assist in all commissioning and start up functions, air blows, loading of catalyst and etc.

Update tracker/ schedule to show progress of each system and the current phase they are in.

Walk down systems with client QA to sell priority packages.

tepco – Mont Belvieu Tx – Enterprise Products November 2016 - April 2019

planner/coordinator

Assist in the development of turnaround work scope

Planned detailed work packages for stationary equipment & piping

Validate job plans to ensure correct man hours, material and inspection activities are included

Change management

Worked with schedulers to help define logic of turnaround activities

Ensure contractors are providing accurate updates to promote schedule compliance

Coordination of all planned turnaround work scope

Facilitate walking down contractors for quotes of all planned activities

Review schedule to find areas of opportunity to better optimize the overall plan

Bilfinger tepsco – Mont Belvieu Tx – Enterprise Products And Oneok August 2013-November 2016

Planner/General FOREMAN

Working daily with the client operations management team, operations, and engineering to assist in any priority jobs in the schedule that needed assistance with contractors’ manpower.

Planned and coordinated all contractors commissioning activities such as air blows, steam blows, chemical cleaning, inspections of boilers, catalyst loading, installation of demister pads, pump alignments, strainer installations, PSSR walk throughs, blinding of equipment such as vessels, towers, drums, and exchangers.

Generated and built work packages with list of planned activities for contractor to be able to perform cost effectively and in a timely manner.

Attended management meetings, to discuss cost delays, safety incidents / topics, budgets, material, manpower needs, equipment needs, man hours, production, progress, schedule and overall path forward to finish project on time and on budget.

jv industrial – Honolulu Hawaii - Chevron February 2013-august 2013

qa/qc inspector

Work daily with engineering, construction, and client personnel to ensure that all the project specifications were met.

Monitored all field construction activities, and ASME code work to ensure compliance with the project requirements.

Verified that all pipe, welding, and process systems are complete per the drawings and specifications before final turnover to plant operations.

Sold off hydros and restorations to QA & Operations.

Make sure the correct drawings revisions were being used.

Weld mapped and flange mapped drawings.

Coordination of all NDE activities

Reviewed NDE on packages before pressure test.

Assembled turn over books for the clients.

turner industries – Baytown Tx – Bayer Chemical January 2012–February 2013

qc inspector

Assembled pipe and mechanical QC packages.

Validated QC packages for correct nde, test pressure and correct material ordered per spec.

Weld mapped Iso’s & P&ID’s drawings.

Coordinated all XRay’s, PT’s, hydro’s, shear waves, etc...

Built turn over books for the clients.

Monitored the different phases of pipe and steel fabrications, and installation.

Sold off hydros and restorations to QA & Operations.

tepsco – Falls City Tx – Enterprise Products March 2011-January 2012

Foreman

Supervised and coordinated activities of a 62 mile long 24” natural gas pipeline.

Evaluated work execution for compliance productivity and quality.

Read and interpreted instruction and documentation and planned the work activities.

Read isometric drawings orthos and P&IDS to further assist employees complete job task.

mei – Baytown Tx – Exxon Mobil September 2007-March 2011

pipe fitter

p2s – Texas City Tx – BP Chemical February 2006 –September 2007

pipe helper/pipe fitter

Education

OSHA 30 Certification

1013T Primavera P6 REV 15.2 Basic Turnaround training

San Jacinto College; plate 1 & 2 welding classes

P2S Level II PT, MT & UTT Certifications

Turner Industries VT Certification

MEI Results Based Supervision Training

Computer Skills

SAP Software

MS Office (Outlook, Word, Excel, Access, Power Point),

WorkPac (Planning Software)