Muhammad Kamran Khan
Site Coordinator
Company
Siemens Pakistan Engg.Co.Ltd.
Department
GP SD SPT
Postal Address
B-72, Estate Avenue, S.I.T.E, Karachi, Pakistan.
Phone
Mobile
adhos6@r.postjobfree.com
Areas of expertise Responsibilities
Project Execution & Commissioning
Oil & Gas Plants, Buildings Maintenance & Operation Supervision.
Supervision of all 132/11KV S/S electrical Activities related to the erecting-Commissioning and Testing. equipment such GIS, Transformers IDTs, ETs, Batteries 48V,110V and 22O DC Volts, Earthing System, lighting protection, overhead cranes, small power, Protection, Transformers, LV/HV GIS PJB Protection and Control Panels, MV and control cable laying and termination modification work as built and Red Mark drawing work.
13.8kV Switch Gear Panels Installation & Pre-commissioning.
34.5kV Switch Gear Panels Installation & Pre-commissioning.
Control Panel & wiring Modification Work.
Cable laying and termination HV, XLPE.
LV/HV Test.
Substation Automation System Installation & Fiber optic cable laying and Verification.
Foundation Earthing, GIS structure Earthing & Testing.
water treatment Plant rotating Electrical & Mechanical Equipment Maintenance & trouble shouting like Pumps, Motor 11kv,DG set 11kv Switch Gear, Transformers Distribution systems, Compressors
Control Building & Admin Building Etc…
Transformer Maintenance &Testing tap changer, Transformer LV Bushing installation & replacement.
Coordination with the consultant, Contractor, Sub contractors, vender and Site Managers for rectifies the site issues.
SANG work in energized Substation protection, AVR, Fault Recorder, DC system Battery Bank, 11 KV SWGR Panels with DEWA.
ETs and IDTs 132kv GIS Erection Assembling & dismantling. LV/HV testing SF6 gas filing, cable laying, termination & testing,11kv SWGR
.
Electrical Asset engineer in National Refinery self-generation project installation & Medium voltage 11/3.3KV Swgr low voltage 415 V, battery charger and UPS, power, control cable, control system Diesel Generator set 4MG Watts & Gas Turbine 7MG Watts.
Shut down maintenance and dismantling and re installation of transformers, 11KV SWGR control wiring insulation test.
Ensure adherence to HSE standard/requirements as per company guidelines and contractual requirements
HSE Trainings in Karachi & Tando Adam.
1, Risk Assessment & Management.
2, Hazards Identification Awareness.
3, UEP Control of Work Standards & Golden Safety Rules.
4, HITRA.
5, Emergency Response Planning & Preparedness.
6, Aramco Certified Work Permit Receiver.
Work History
Dec 2018 – Present Site Coordinator for Dolmen City Tower A & B Project, Karachi
June 2018- Nov 2018 E & I Site Supervisor UEP Oil & Gas Tando Adam Sindh.
May 2013-May 2018 Electrical Technician for KJO Kuwait Gulf Oil Co.
& SA Aramco Oil & Gas Bulk Plant with AlBusaili Co.
May2011 – May 2013 Site Supervisor for Supply, installation, testing, commissioning and maintenance of . 380KV&115KV Satellite &10J 13.8 & 34.5 KV S/S at Yanbu Siemens SA
Jun 2008- Mar 2011 Site Supervisor for Supply, installation, testing, commissioning and maintenance of
132 KV /11KV S/S Siemens Dubai Projects.
Oct 2007 – May 2008 Site Supervisor at DHA Grid Station Siemens PK Karachi.
May 2006 – Sep 2007 Power & Desalination Plant Combined Cycle DHA Cogan Siemens PK, Karachi
Oct 2005 – Apr 2006 Site Supervisor at Thatta Cement Factory Siemens PK Karachi.
Aug 2003 – Sep 2005 E/Technician at Switch Board Siemens PK Karachi.
Jan 2001 – Aug 2003 E/Technician at UBL, KPT, Bhit Gas Project, Dadu Oil field,Tangri Oil field
With Siemens PK Karachi.
Nov 1999 – Dec 2000 E/Technician at Younus Textile with Siemens PK Karachi.
Feb 1999 – Oct 1999 Installation & Commissioning of Transformer at Habco Power Plant with Siemens
PK Karachi.
Dec I997 – Jan 1999 Site Supervisor for National Refinery self-generation project
7.5 MW Turbine & 4MW Diesel Generator.
May 1992 – Nov 1997 E/Technician at Karachi Air Port with Trust Aviation Services Pvt Ltd.
Major Projects
Supply, installation, testing, commissioning and maintenance of Sub-station electrical works and Electrical Installation works at Dolmen City Tower A & B
Role / responsibility: Site Coordinator
Start: Dec 2018
End: Project is in finishing phase
Supply, installation, testing & commissioning of REDA Pump Electrical &
Instrumentation Installation work at UEP Oil & Gas Plant Tando Adam Sindh.
Role/ Responsibilities : Site In charge
Start: Oct 2017
End : Oct 2018
Maintenance & Operation works at WaterTreatmrnt Plant Alkhfji KJO & Aramco
SA Gulf Operation.
Role : Responsibilities : Maintenance Supervisor
Start : May 2015
End : May 2017
Maintenance & Operation at SA Aramco Oil & Gas Plant Jezan.
SA Gulf Operation.
Role : Responsibilities : Maintenance Supervisor
Start :13 Mar 2013
End : 15 Mar 2015
Supply, installation, testing & commissioning fort 132 / 11KV S/S Yanbu .
Siemens SA.
Role: Responsibilities Site Supervisor.
Start: May 2011
End: May 2013
Supply, Installation, testing & Commissioning for 132 /11 kv S/S at Siemens Dubai Dewa Dubai Projects Dubai.
Role: Responsibilities Site Supervisor.
Start: May 2008
End: Mar 2011
Supply, Installation, testing & Commissioning for DHA Grid Station at DHA Karachi with Siemens PK Karachi.
Role: Responsibilities Site Supervisor.
Start: Oct 2007
End: May 2008
Supply, Installation, testing & Commissioning for Power & Desalination Plant at DHA Cogan Siemens PK Karachi.
Role: Responsibilities Site Supervisor.
Start: May 2006
End: Sep 2007
Supply, Installation, testing & Commissioning for Thatta Cement Factory Mixer Plant Installation with Siemens PK Karachi project.
Role: Responsibilities Site Supervisor.
Start: Oct 2005
End: Apr 2006
Supply, Installation, testing & Commissioning for Self Generation Power Plant 7.5 MG Gas Turbine & 4 MG DG Set at National Refinery with Siemens TD project.
Role: Responsibilities Site Supervisor.
Start: Dec1997
End: Jan 1999
Education
DIPLOMA OF ACCOCEATE ENGINEER 1989 T0 1991/92.
Languages
Urdu, English, Arabic