Post Job Free

Resume

Sign in

Power Plant Welding

Location:
Coimbatore, Tamil Nadu, India
Posted:
November 08, 2020

Contact this candidate

Resume:

S.MAHENDRAN

adhna1@r.postjobfree.com

****-962-***-****

CURRICULUM VITAE

Post Applied : NDT INSPECTOR

Years of Experience : 12 YEARS

Skill Set in NDT : ASNT LEVEL – II in

RADIOGRAPHIC TESTING

(RPP CARD HOLDER FROM SAUDI ARAMCO, CARD NO: 4202) ULTRASONIC TESTING

MAGNETIC PARTICLE TESTING

DYE PENETRANT TESTING

Experience Details

MAKAMIN PETROLEUM SERVICES COMPANY:

In MAKAMIN working as a NDT Technician in various ARAMCO client’s projects contractors are BIN- QUARAYA, FLOWSERVE, AL-HAMMAM, MACE, MAKAMIN PSD, AICCO, PSIS etc., Duties and Responsibilities:

Conduct the radiographic testing in the pipeline weld joints.

Conduct the radiographic testing in the flow line weld joints.

Conduct the magnetic particle testing in weld joints.

Conduct the penetrant testing in the stainless steel material fillet weld joints. INDUSTRIAL SUPPORT SERVICES COMPANY (ISS):

In ISS, working as a NDT Technician in various petrochemicals plants such as, Saudikayan, Ar-razi, Yansab, Luberef (Jeddah & Yanbu), Rabigh Power Plant – 2 Construction.

Clients are: Olayan Descon, Anabeeb, Saudi Binladin Group, GSCC, Harrispye, Bobcock, Al-Zamil Industries, SWCC, SABIC, Doosan, etc.,

Duties and Responsibilities

Conduct the radiographic testing in the boiler-tubes, pipelines, storage tank construction.

Interpretating the radiographic films.

Verify the WPS before welding.

Witness for the welding process.

Witness for the hydro-test process.

Conduct the visual inspection on the pipe fit-ups.

Preparation of drawings required for the thickness measurements and arranging the documents.

Preparation of weld mark-up drawing for pipelines.

Conduct the thickness measurements on pipelines, tanks, boiler-tubes, heat-exchangers, vessels, etc.,

Conduct the radiographic testing of the pipelines, tanks, boiler-tubes, furnace tubes, etc.,

Interpretating the radiographic films.

After finishing the daily works make the reports and sent to the superior. In Saudikayan (2012):

Conduct the UT thickness measurements of vessels, heat-exchangers, boiler-tubes, pipelines, etc.,

Cooling tower blade inspection.

Conduct the video-scope inspection for the boiler-tubes, heat-exchanger tubes, etc.,

Verify the WPS before welding.

Witness for the welding process.

Witness for the hydro-test process.

Verify the materials suitable for welding.

Conduct the visual inspection in the pipe fit-ups and fittings.

Conduct the penetrant test in both visible and fluorescent methods.

Conduct the magnetic-particle test in both dry and wet methods.

Conduct the hardness test in the P-9 pipelines before and after welding.

Conduct the hardness test in the non-metal materials.

Witness for the hydro-test process.

Make the drawings for the pipelines, vessels and equipments.

Prepare daily-reports everyday and submit to the supervisor. In Ar-razi (2012):

Witness for the welding process.

Did the penetrant test in the pipelines before and after welding in turn-around shutdown. In Yansab (2012):

Conduct the penetrant test in the boiler-tubes, furnace tubes and pipelines.

Conduct the radiographic testing in the boiler-tubes, furnace tubes and pipelines.

Interpretating the radiographic films.

Conduct the thickness measurements in the pipelines. In Saudi Binladin Group (2012):

Conduct the radiographic testing in the boiler-tubes and pipelines.

Interpretating the radiographic films.

Conduct the penetrant test in the weld joints.

Verifying the WPS before welding.

Witness for the welding process.

Witness for the hydro-test process.

Prepare the QC documents.

In Al-Zamil Industries (2012):

Conduct the magnetic-particle testing in the tank bottom plates and tank T-Joints.

Conduct the penetrant test in the pipe weld joints.

Witness for the welding process.

Conduct the UT thickness measurements in the tanks and vessels. In SWCC (2012):

Conduct the radiographic testing in the boiler-tubes and pipelines.

Interpretating the radiographic films.

In GSCC (2012):

Conduct the radiographic testing in the boiler-tubes and pipelines.

Interpretating the radiographic films.

In Harrispye (2012):

Conduct the radiographic testing in the boiler-tubes and pipelines.

Interpretating the radiographic films.

Conduct the hardness test in the P-9 materials before and after welding. JEONG POONG SAUDI ARABIA LLC. (JPSL) :

Worked in Jeong Poong Saudi Limited (JPSL) as a Material controller in Marafiq expansion project Unit5 and Unit6, Yanbu. Hanwha is the client. (From July 2011 to December 2011). Duties and Responsibilities

Supervise the material department in the warehouse.

Materials receiving and send to site as per request from construction side.

Material shipping status verify from client side.

Material Inspection during shipping and receiving time any damage found and make a report.

After receiving the materials make the inspection request to client side.

Involved in checking of the drawings and releasing for construction.

Make the updated status of the materials every-day. Make the schedule for the shifts of cranes, forklifts, man-powers, etc., To govern smooth project operation activities.

Preparation of all records and weekly progress reports related to work.

Maintaining database for manpower and production activities. JUBAIL ENERGY SERVICES COMPANY (JESCO):

Worked in Jubail Energy Services Company (JESCO) as a MT technician in Saudi Arabia for 1 year (2010- 2011).

Duties and Responsibilities

Pre-service inspection of seamless pipes by MPI in JESCO. Saudi Arabia.

Pre-Service Inspection of seamless pipe ends in pipe plant by using MT method. (Fluorescent and Dry).

Make the clear reports.

If any relevant defects found during inspection, compare to the acceptance standards it is accepted or rejected and Make the clear reports.

AL-MUZAIN (ZAIN INTERNATIONAL):

Worked as a Piping Foreman in SAUDI KAYAN in Saudi Arabia (2009-2010). Duties and Responsibilities

Responsible for fabrication of structures.

Checking the fitted materials in fabrication site for given dimensions

Coordinating with QC Department for NDT activities.

Checking the placement and alignment in erection.

Made the visual inspection for pipe fit-ups for welding and bolting.

Involved in carrying out Welder Qualification. (Preparing Welders Certificate/ Card as per the Code and specification).

ERAM ENGINEERING:

Worked as a NDT Technician in IBN RUSHD in Saudi Arabia (October 2009). Duties and Responsibilities

Take-out the thickness measurements in heat exchangers, pipelines and storage tanks.

Made Penetrant test in weld joints in inside of the aromatic reactor and make the reports. MB INSPECTIONS.

NDT inspector (UT SPCECIALIST) and NDT Trainer Since July 2014 Duties and Responsibilities:

Prepare inspection Schedule for incoming call letters to conduct NDT.

Verify customer Procedures and cross verifying it with job requirement.

Reviewing and co-ordinating all the reports (After performing inspection in PT,MT,RT)

Training new comers and Students at WQC in regard of NDT (PT, MT, RT, and UT).

Performing UT on Jobs as per customer requirement.

Evaluating Reports of UT as per customer procedure and relevant international standards.

Guiding young Engineers and supervisors in performing UT on complicated joints (T,K,Y joints)

Also training students in Basics of welding and advanced NDT methods.

Preparing documents dossier as per customer requirement and various international standards. INDUSTRIAL RADIOGRAPHIC INSPECTION COMPANY:

Worked as a Radiographer in IRICO, Coimbatore, India, for 2 years. (2007-2009). Clients are Bharat petroleum chemicals limited, Indian oil corporation, PK Industries, Texmo Industries, SV Industries, etc.,

Duties and Responsibilities:

Did the Radiographic testing in various size of the castings of valves, engine parts, motor parts, etc.,

Did the Radiographic testing in pipe weld joints in various number of sizes. Personal Details

Name : MAHENDRAN SINGARAVELU

Date of Birth : 10/07/1986

Sex : Male

Marital Status : Married

Nationality : Indian

Qualification : B.Sc., Physics, Bharathidasan University, Tamilnadu. Computer Knowledge : Microsoft Office, Adobe Pagemaker, Photoshop Passport number : R 5758066 (Valid upto 2027)

Language Known : English, Malayalam, Hindi, Tamil

Permanent Address : D2/C, Srinagar, Vadaseri Road, Mannargudi -614 014. Tiruvarur Dt., India.

S.MAHENDRAN



Contact this candidate