PROFESSIONAL PROFILE

A Diploma Mechanical Engineer having 20 years’ experience in ( Fabrication ) Boiler, Pressure, Tanks, Pipeline, Structural Steel Fabrication for Industrial Structures like Power plant, Gas Turbine Plant, Petro Chemical plants, Refineries, Airport, Stadium steel structural work and Architectural oriented buildings, & Sheet metal works

ACADEMIC CREDENTIALS:

Diploma in Mechanical Engineering, State Board of Technical Education, Chennai, Tamilnadu - India with First class 74% in the year 1993 April.

College: Swamy Abedhanantha Polytechnic – Thellar – Thiruvannamalai Distric - Tamilnadu. India.

Computer Knowledge : AutoCAD 2D & 3D Modeling, Solidworks2017, MS Office.

Personal Details:

Date of Birth: 21st Jan, 1971

Address: No: 2, Pallavan Nagar, Fist Cross Street

Kama raj Nagar Post, Avadi- Chennai-600 071

Tamil Nadu - INDIA

Languages Known: Tamil, English and Hindi

Since - 21/07/1994 to 20/07 /1995

Position: Technician Apprentice

Organization: LOCO WORKS – SOUTHERN RAILWAY (GOVT OF INDIA) – PERUMBUR -Chennai

Trainee in various Departments like Welding Shop, Machine Shop, Millwright Shop, & Coach Fabrication Shop.

Since- 20/11/1995 to 11/09 /1998

Position : Production Engineer

Organization : M/s IAEC INDUSTRICES (MADRAS) LTD – Chennai – 49

Manufacture of IBR Boilers, Pressure Vessels, Tanks, Burners, Pipe Line Etc...

in package Boilers, Water Tube Boilers, Pressure Vessels, Tanks, Burners,

In various industries. Material specification ASTM - A 516-G-70,

Welding Process – SMAW, SAW, GTAW, FCAW

Work Details

Execution of Fabrication in the Work shop as per the production Methods.

Material Arrangement as per drawing.

Production follow-up as per the Production Plan schedule.

Follow the Quality procedure in the production Area

Man power Control and Allegation.

Co-ordination with QA/QC Dept. in inspection.

Welding inspection by conducting various NDT measures.

(RT, UT, MPT, LPT)

Since - 15/12/1998 to 05/02/2001

Position: Supervisor (Piping)

Organization: M/s Stewards & Lloyds of India Ltd. – Chennai -Thousand light

I was involved with M/s Stewards & Lloyds of India Ltd. in Pipe Line Fabrication and Erection for NUCLEAR POWER CORPORATION LTD. (NPCL) at Kaiga, Atomic Power Station Project - 3 & 4 units near Karwar (Karnataka) in INDIA

Work Details

Supervision & Execution of the Production in shop floor.

WPS Arrangement

Material Planning & Procurement.

Co-ordination with QA/QC Dept. for inspection.

Reporting the daily activities directly to the Production head.

Coordinating between site, clients, consultants, QA/QC – authorities

Follow the NDT in Piping Activities

Since- 20/05/2001 to 08/02/2008

Position : Quality Engineer

Organization : M/s Padma Engineering Steel Construction Pvt. Ltd, Chennai

Ambattur Industrial Estate

I was involving in M/s Padma Engineering Steel Construction Pvt. Ltd. Construction of Various Architectural oriented Steel structures Buildings, Stadium Steel Structural Buildings i.e. Columns; Beams, Platforms, Roof girders, crane girders, roof trusses etc. were fabricated and erected. M/s Ashok Leyland,

Hyundai motors ltd, Hanilier Ltd, RIL, Ashaki India Glass Ltd, Lady Andal school Etc…

Work Details:

Material (MS plate, Beams, PFC, and Angles) planning based on drawings received. Plate (IS 2062 Gr. B) verification with respect to Test Certificate, heat no., etc.

Planning of systematic work.

Welding inspection by conducting various NDT measures.

WPS Preparation, Welder Qualification

Preparation & submission of Welding Inspection Report.

Site Inspection & Reports activities.

Reporting to client

In House Fabrication Inspection Report Preparation (Dimensional, Visual & Test)

Material Inspection, In House fabrication Stage Inspection Reports

Since April-2008 to July-2010- ETA Mechanical LLC (ETA- ASCON GROUP- Dubai,

Supervisor (Steel Structural Fabrication)

Project: Al Aweer Gas Turbine Power Project – Phase –II

Owner: Dubai Electricity and Water Authority. (DEWA)

Client: Siemens- ETA Power Project Consortium.

Consultant: Mott Mc Donald

Work Details

Supervision of Steel Fabrication

To plan the daily Production Activity

Labor management.

Material arrangement for production

Co-ordination with QA Dept. for inspection

Co- ordination with client & Consultant

Project: DOHA INTERNATIONAL AIRPORT – QATAR

Six gate VIP Terminal Expansion

New transit Building, New Arrival

Owner: QATAR AIRWAYS

Client: GULF CONTRACTING COMPANY WLL – QATAR

Project: NEW DOHA INTERNATIONAL AIRPORT (NDIA) – QATAR

Air Line Engineering Building (Canopy Steel Structure) CP-20

Owner: QATAR AIRWAYS

Client: GULF CONTRACTING COMPANY WLL - QATAR

Consultant: KEO

Engineers: BECHTEL

Project: QATAR PETROLIUM (QP)

New Pump House Steel Structural (QP-REFINERY)

Owner: QATAR PETROLIUM

Client: GULF CONTRACTING COMPANY WLL - QATAR

Consultant: Mott Mc Donald

Work Details

Daily Site activates plan

Co- ordination with client & Consultant.

To plan about daily/ weekly/monthly schedules ( Fabrication, Erection)

Material management.

Labor management.

Interaction with clients/ Third party A

Since Jan 10 - 2012 to Jan 28 - 2014 - Galfar Engineering & Contracting SAGO – Oman As Mechanical Supervisor (Oil & Gas)

Project: Fahud Gas Early production Pipe line

Client: Petroleum Development of Oman. (PDO)

Details

Hookup Pipeline Fabrication in Workshop ( DSS & Oil Line )

Flow line welding in site

To plan the Daily Activity in Fabrication shop & Site

Material arrangement for Production as per drawing

Welder Qualification arrangement as per the WPS

Pipe,fittings & Valves Inspection arrangement before fabrication

Labor management in Workshop and Site

Co-ordination with QA Dept. for inspection Activity

NDT ( RT, UT, MPT, LPT ) and Bolt torque test follow-up

Pigging and Hydro Test arrangement

Coating Supervising ( CANUSA Sleeve )

Co- ordination with thread Party inspection.

Pipe Support Steel Structural steel Fabrication

Safety follow-up in both Site and Workshop

Permit work system follow-up in site

Welding joint report co-ordination with QC People for RT

Lowering activity arrangement in Site.

Since Jun 24 – 2015 to – May 10 – 2018 Valisons & Co – Mumbai

As FACTORY PRODUCTION MANAGER - KHOPOLI

Manufacturing And fabrication of Bunk & Portable cabin Container, Certified Container (DNV)

Site office Container

Large Size Site Office Container for various Industries, Construction/ shipping /Oil & Gas /

Petrochemical, Government oriented sector, etc…

Design, Fabrication & Sheet Metal Construction

Pluming, Carpentry, Electrical, and everything

Material Planning

Design

Fabrication

Since Sep 18 – 2018 to Till Date – NFA FAB CORPORATION LLP – NUNGAPAKKAM

AS FACTORY MANAGER – KATTUR

Manufacture of Fire fight Equipment’s

Fire door

Fire reel Hose Box

Fire proof windows

Firefighting Pipe line systems