Post Job Free

Resume

Sign in

Civil Engineering Manager

Location:
Bucharest, Romania
Posted:
November 08, 2020

Contact this candidate

Resume:

Page */* - Curriculum vitae of

Stelian Craciun

Curriculum Vitae

.

Curriculum Vitae

Stelian Craciun

Personal information

Permanent / Home Address Iasi, Romania

Telephones +4-072*-***-***

Skype ID stelian.craciun1

E-mail adhm6y@r.postjobfree.com

LinkedIn https://www.linkedin.com/in/stelian-craciun-871879115 Nationality Romanian

Date of birth 28 May 1962

Gender Male

Expertise and experience Management of companies with projects related to the constructions sphere Education 1982-1987 “Gheorghe Asachi” Technical University of Iasi Romania, FACULTY OF CIVIL ENGINEERING Master Degree - Hydrotechnical Engineering 1981-1982 Military service - Sapper Captain Reserve 1977-1981 “Costache Negruzzi” National College - Iasi Romania - Baccalaureate Degree awarded MASTER OF SCIENCE – ENGINEER

Principal subjects/occupational

skills covered

CIVIL ENGINEERING

Qualified manager, with a wide experience, gained from countless projects starting from design to completion both underground and above the ground, covering a wide range of specialties, from housing to commercial, industrial, infrastructure, private and governmental. Team leader with strong communication skills and with a strong ability to quickly adapt to changing, can-do and pro-active approach, proficient with FIDIC forms of Contract, professional in managing all design requirements. tender, project implementation, project scheduling, completion and closing procedures, able to find solutions in respect of deadlines, quality, and safety all within allocated budget.

Professional courses Project Management Professional - Certificate issued by TÜV Thüringen - Germany

- Diploma issued by the Ministry of Education - Romania. QMS ISO 9001 Auditor - Diploma issued by “Qualitas” - Romania Computer skills and competencies MS Office, MS Project, AutoCAD. Mother tongue Romanian

Spoken Languages ENGLISH; FRENCH; RUSSIAN

Personal skills and competences

Glider Pilot International Brevet

Driving license Romanian, Qatar, UAE.

Page 2/5 - Curriculum vitae of

Stelian Craciun

Work experience

Dates Jul 2018 – Present

Occupation or position held Project Director

Main activities and

responsibilities

Provided overall direction and management of completion in Cote d'Ivoire (Francophone country and French official language of the Project) of 65 km of new road thru the tropical forest, crossing rivers, swamps and rock hills, including working drawings, value engineering, provides design calculations and solutions for atypical zones, from Blolequin – Toulepleu – border Liberia. The project summarises:

• over 3 million cubic meters of earthwork (cut and fill, cut and throw, filling with suitable material from borrow pits)

• one concrete bridge over Cavali River with a span of 135 m (3 openings of 45), design and build to ensure stability based on load supply by the client

• Over 250 culverts design and build, precast and cast in situ including hydraulic calculation and stability

• Produce in our own quarry 280k m3 of material for base, asphalt and concrete

• Ensure in the site factories the main materials, asphalt, concrete, cut and bend reinforcement, formwork and the precast elements for the entire project Now the project has been put on hold by the Ivorian Government for an uncertain time. Name and address of employer SBI International AG CI – Cote d’Ivoir Type of business or sector General contractor

Dates Jan 2015 – Jul 2018

Occupation or position held Project Manager

Main activities and

responsibilities

Provide overall direction and management of design and construction projects (MARINA – LUSAIL), monitors on schedule completion within or below budget in accordance with contractual obligations. Manage the Parsons team design to ensure the conformity of the design the projects specs, approval of design. Monitors risks/problems during the design and completion stages and helps develop options to resolve. Monitor scope development, scope management and commercial performance of the project to meet project goals and objectives. The scope has covered all infrastructure works on the public realm for public utility supply, for civil and authority's usage. Assists to plan and define program goals and methods to accomplish them. Represents the client's interests. Name and address of employer Parsons International Limited – Parsons Doha Qatar Type of business or sector Constructions, Environment & Infrastructures Dates Mar 2011 – Jan 2015

Occupation or position held Technical Director

Main activities and

responsibilities

Managing and coordination of specific activities for running of three major projects of existing roads rehabilitation and build new national roads under Red and Yellow FIDIC contracts with the National Administration of Road of Romania. The total amount of the the investments financed by the European Community and Romanian Government exceed over 180 million €. The deadline for two projects was achieved on time, at the end of 2013 and for the third project the company received a letter from the Government that the project will be put in standby. Name and address of employer “Shapir Structures” - Romania Type of business or sector Contractor for road and highway executions Dates May 2009 – Feb 2011

Page 3/5 - Curriculum vitae of

Stelian Craciun

Occupation or position held General Manager

Main activities and

responsibilities

I’ve applied all the procedures and opened a branch in UAE. Was obtained all necessary approvals and licenses for the branch to perform building design and completion activity in Emirates according to the laws of the UAE. After receiving the license, personally, I had a management contract with Flora for Agricultural Service from Al Ain. During this time the company get contracts for design and build hardscape and landscape, greenhouses, access roads to and from the highway. The most important clients were Minister of Foreign Affair of UAE, Sharjah City Hall, Rocco-Forte Hotel from Abu Dhabi, Al Ain Mall. The branch was cancelled after some dispute with local sponsor .

Name and address of employer “Tungal Metrou” - Dubai Branch - UAE Type of business or sector General Contractor

Dates Apr 2008 -May 2009

Occupation or position held Technical Director

Main activities and

responsibilities

Ensured the management and coordinate Projects completion activities, from design, tendering, planning and control for entire Tungal Group of Companies (app1500 employees) The most projects and contracts of the Company coming from private investment. Until the beginning of 2009, the average company monthly income was exceeding 10 million €.

• The contracts for the structure design and turnkey project

• Contracts for design and completion works pedestrian subway projects, below the major traffic arteries without stopping traffic – Structural and architectural designer along the duty General Contractor based on (design and build) Yellow Fidic rules.

• A turnkey contract design and build, for the project of 4-star hotel – General Contractor

• A contract for design and completion of concrete structure executions at “Liberty Mall” Bucharest, approx. 50,000 m2

(General Contractor was JV “Mivan” and “Kier” Romania)

• Design and build, underground parking over 10,000 sqm Name and address of employer Group of Companies “Tungal Metrou” - Romania Type of business or sector General Contractor

Dates Apr 2007 – Apr 2008

Occupation or position held Technical Director

Main activities and

responsibilities

Responsible for preliminary specific design activities before start execution of two projects a real estate investment in Bucharest and Sibiu - Romania, with a value of investment exceeding 500 million €, which amounted to 750 apartments - Shapir - owner and developer

• Activities on site that have not started and are still on waiting. Name and address of employer “Shapir Romania” (multinational company) Type of business or sector

Owner and developer for Real Estate projects

Dates Apr 2004 – Apr 2007

Occupation or position held Chief Engineer

Main activities and

responsibilities

Responsible for preliminary activities design and executions of 2 national projects under Yellow FIDIC contract for rehabilitating of 80 km National Road and 120 km of County Roads especially in the mountain area.

• Rehabilitation of 35 km from DN 17 in the mountain area. Project amount 35 mil € - Consultant “SCEAUTORUTE” - France

• Rehabilitation of 45 km from DN 1 on the plateau area and sub-Montana area. Project amount 36 mil € - Consultant “SPEA Engegneria” - Italy Page 4/5 - Curriculum vitae of

Stelian Craciun

• Rehabilitation of 120 km of county roads, under Red FIDIC contract, in the hill and sub Montana area, after calamities in spring 2005. Projects with amount 13 mil € was completed in 5 months - Consultant “Consilier Construct” - Romania Name and address of employer “AshRoich” Romania (JV Ashtrom and Roichman - multinational company) Type of business or sector

Infrastructure General Contractor

Dates Mar 1995 – Apr 2004

Occupation or position held Production Director

Main activities and

responsibilities

Managing and coordination the functions of relevant departments, economic, quality assurance, human resources, production activities, tendering, planning and control for the company. Watching efficiency for the company and created a controlled system that meets requirements for efficiency and maximum profit in conditions of safety, quality, time and assigned budget. During that time the quality management system was certified by two organizations accredited in Romania, “Romanian Railway Authority” and “QUALITAS” Time when specific works has extended in the company, if most of incoming until ‘96th came

from subway works, after ‘96th

we extended activities to projects in civil building works, like main contractor or subcontractor for residential buildings, schools, hotels, office buildings, bank branches, drinking water supply stations and networks for few villages, production and storage halls for industrial park, villas, roads and bridges. Could include a list of over 200 projects:

• Hotels: “Holiday Inn”, “Sky Gate” – Consultant “EC Harris” - England

• Office Buildings: “Union International Centre 2”, “Neo City”, “Unimed”, “Lafarge” Headquarter

• Canadian Embassy offices in Romania – Consultant “Avrig35” Romania

• Vodafone Headquarters. - Quality Award is given by the Government of Romania

• Subway new tunnels TBM method - 1200 m double way

• Subway stations - 5 station built by top-down method

• Subway double way tunnel - 12 km hand over to “Metrorex” (administrator of the subway)

• Branches of Banks

• Road rehabilitation - 45 km infrastructure DN2 – Consultant “Search Corporation” - USA

• Road bridges - monolithic and stressed beams - Consultant “Search Corporation” - USA

• Turnkey project residential complex in Bucharest – “American Village”, “Floreasca View”

• Complex works inside the slurry walls or piling.

• Works with deep foundations by drilling pilots or Kelly walls

• Production and storage halls

• Renovate and consolidation of buildings of heritage – “National Bank of Romania”, Monastery

• Build concrete plants for “Carpat Beton”, “Holcim” in Bucharest Name and address of employer “Tungal Metrou” Bucharest - Romania Type of business or sector

General Contractor

Dates May 1993 - Mar 1995

Occupation or position held Project Manager

Main activities and

responsibilities

Responsible for managing and coordination activities for works completion, interior and facades on existing structures (done before 1989) for residential buildings with 5, 8 and 10 floors into the heart of Bucharest with one total for more than 500 apartments Name and address of employer “Tungal Metrou” Bucharest - Romania Type of business or sector General Contractor

Page 5/5 - Curriculum vitae of

Stelian Craciun

Dates May 1990 – May 1993

Occupation or position held Project Manager

Main activities and

responsibilities

Development of Bistrita River the 4th

stage, upstream from the Izvorul Muntelui storage lake with a total installed power of 30.5 MW and an output of 125 GWh/year. The Piriul Pantei – Galu, is the first stage of this section which turn into count a 51m water head and it includes a 1 million c.um storage lake, a 3 span dam equipped with radial gates, an underground 8.3 km head-race and 20MW HPP. The works have already started but now they are in stand-by.

The second stage of this section is Topoliceni - Poiana Teiului and it includes the Topoliceni dam ith a storage lake of about 800k cu.m. The dam is equipped with a fish leader. The water tower is above ground s cylinder type 26m diameter and 18m high. The HPP is half buried type it the penstocks and the valve in the same body. The main duties were the Management of the multidisciplinary teams. Within completion work was included:

• Excavations in alluvia – 800,000cu.m

• Excavations in rock – with heavy equipment’s and with dynamite – 50,000cu.m

• Underground excavation with heavy equipment and dynamite blasting – 78,000cu.m

• Earthworks, slurry walls, moulded walls, fillings

• Concrete structures – 105cu.m

• In-depth sealing injections – 30,200 m

Name and address of employer “Hidroconstructia SA” - Bacau Branch - Romania Type of business or sector General Contractor hydropower complex Dates

Dec 1987 – May 1990

Occupation or position held Project Manager

Main activities and

responsibilities

Managed the completion of hydrotechnical works for Irrigation System Project serving more than 100,000 ha, part of one of Romanian National Project and the main works were for:

• Bringing water by gravity in the system thru 2 metallic pipes 2000mm diameter

• Structure for Main pumping station - underground

• Pool for water discharging and sucking

• Open channels for the inside system, water transport

• Pumping stations - to put under pressure irrigation network Managed the completion of the Project of “Industrial Water supply for the new Industrial Area in Buzau City” – Romania. In the Project were included works of:

• The concrete structure of the Stations for water capture from the river

• The concrete structure of Decantation pool – part of the treatment plant

• The concrete structures of water Filtration station – part of the treatment plant

• The concrete structure of water pumping station from the treatment plant to water tank

• The concrete structure of the water tank, semi-buried and post-stressed for a total net capacity of 10,000 m3

,

Name and address of employer “National Company for Accomplish and Exploitation of Works for Improve Quality of Agricultural Soil” - Buzau - Romania

Type of business or sector

Accomplish and Exploitation of Works for Improve Quality of Agricultural Soil Dates Oct 1987 - Dec 1987

Occupation or position held Trainee Engineer - Assigned by the Romanian Government to “National Company for Accomplish and Exploitation of Works for Improve Quality of Agricultural Soil” - Buzau - Romania



Contact this candidate