Post Job Free
Sign in

Piping Engineer

Location:
Calabar, Cross River, Nigeria
Salary:
NGN 2,500,000.00
Posted:
November 06, 2020

Contact this candidate

Resume:

EKWEOZOR, VICTOR ATOMBA

RESIDENCE:

* ***** ******

Rumuwhara

Oroigwe Port Harcourt.

Rivers State

> Job Title: Lead Construction Supervisor (Structural/Piping & instrumentation)

Contact Phone No: 081********/ 080********, / 080********,

1. PERSONAL DATA:

DATE OF BIRTH: JANUARY 30, 1968

PLACE OF BIRTH: ONITSHA, ANAMBRA STATE

STATE OF ORIGIN: ANAMBRA STATE.

2. QUALIFICATIONS DATE:

1.FEDERAL UNIVERSITY OF TECHNOLOGY, OWERRI

B. ENGR. MATERIALS AND METALLURGICAL ENGINEERING (1987-1992)

2.FEDERAL POLYTECHNIC IDAH, BENUE STATE

ORDINARY NATIONAL DIPLOMA (O.N.D) PRODUCTION

METALLURGY (1984-1986)

3.ACADEMIC PUBLICATION/LITERATURE:

1.The use of Basic Slag on Soil Conditioning

(Final Year Project Work) (1992)

2.Cathodic Protection of Pipeline

(Final Year Seminar) (1992)

4. PROFESSIONAL WORK EXPERIENCE

27 Years Professional work experience in Petroleum Industries as follows:

4.1 Company: ADDAX PETROLEUM DEV. COMPANY LIMITED.

4.1.1 Status: Lead Construction Supervisor (Structural, Piping &

Instrumentation).

4.1.2 Period: January 2006 to Date

4.1.3Project Handled:

4.1.3.1Supervision of ADPP Revamp Project and Demolition/ Dismantling of TPU NPDC Process Equipment’s and interconnecting piping OML-123. Supervised Pre-fabrication and installation of ADNB-ADNA topside piping and ADNB-ADNA 12” Pipelay and Commissioning activities. 2019-2020. OML 123. Platform Upgrade and Modification of Topside Piping’s. ADSW to ADPP 4” Riser Repair, EBNE/ADRP-1 4” Riser Repair, 2018 OML 123 Conversion of KTM-20H Gaseous Well to Gaslift Line. 2017 OML 123 Conversion of 6” Production line to ADNH 4 Gas lifts line Dismantling of ruptured 12” Production line from ADNB to ADRP-1 at seabed to Riser Flange limit. Design and Fabrication of Platform Structural lifting beam at ADPP and EBPP.

4.1.3.2Supervised Pre-fabrication and installation of 2016 OML 123 Platform Upgrade and Modification of Topside Piping’s. Design and Fabrication Platform Structural and Piping.

4.1.3.3Supervised Pre-fabrication and installation of 2015 OML 123 Well hook-up at Adanga North B PLATFORM on Well Number ADNH-21H-23H,24H, ADNH-16ST1, ADNH-12STI and ADNH-10ST1, Platform Upgrade Deck Extension and Surfo Boat landing work at Oron WH Platform, Adanga North B Platform, Adanga PP and Ebughu PP. Gaslift Upgarde Work at Oron WHPP, KTM-B Platform Decks and Manifold Extension and Well Head Control Panel Instrument Installation and Hook-up Project.

4.1.3.4Supervised Pre-fabrication and installation of 2014 OML 123 Well hook-up at Adanga North A/B PLATFORM on Well Number ADNH-6,7H. ADNH-16,17H, 18H, 19H, and 20H. Platform Upgrade Structural Deck Extension and Boat landing at Akam PP and Oron West South Platform.

4.1.3.5Supervised Pre-fabrication and installation of 2013 OML 123 Well hook-up at KTM-B PLATFORM on Well Number KTM-7H, 8H, 9H, 10H, 11H, 12H, 13H 15H, 16H, 17, 18, 19H, 20H, 21H, and 22H, Deck Extension and Test Separator and associated piping work at Oron West South Platform,

4.1.3.6Supervised Pre-fabrication and installation of 2011 OML 123 Deck Repair Work, Installation and Hook-up of Adanga South Water Injection Platform and associated Piping, Well Hook-up of (Oron West-South PP and Adanga North ‘B’ PP) and Platform Upgrade (Shut down Work at Ebughu PP Manifold Modification, Akam Pax Pump Change out and Metering Spools Modification, ORWH PP Deck Extension Project Oron WS Production and Test Manifold Valves Replacement. Supervised Pre-fabrication and installation of 2008 OML123 Well-Hook-up and Platform Upgrade and OML124, Izombe Flow station Flare down Project. Supervised Pre-fabrication and installation of Ebughu East Platform Well Hook-up 2007 OML 123 (Well EBE- 5H, 7H, 15H, 16 H, 17H), Oron PP (ORW-6H, 7LS 7ST. 10H, 11Hand 13H), Adanga North (Well ADN-5H) Adanga South Platform (Well ADS-11H, 13H, and 14H). Platform modifications. Supervision of installation and Hook-up of 4” and 6” Flexible Hose from AND-EWT to ADRP-1, OML 123 FPSO Shut Down Work (Knock Adoon),OML124 Izombe- Ossu Manifold Extension, Adanga Well Hook-up 2006. (Well 16 –21), Pre-fabrication and Installation Catcher Net for Calabar Base Helideck, Repair of Fender at Calabar Base Millerio Jetty, General Platform Upgrade (Repair and Replacement of Corroded section 6” and 8” Bogi –Ebughu Risers, Platform Deck Modification)

4.2 Company: SAIPEM CONTRACTING NIGERIA LIMITED

4.2.1 Status: Senior QA/QC Engineer Supervisor.

4.2.2 Period: October 2005 to January 2006

4.2.3 Project Handled:

4.2.3.4Pre-fabrication of Carbon Steel, Duplex Stainless Steel Pipeline and Stainless Steel Piping

and Flow lines for SPDC Soku De-Bottlenecking Project from October to date.

4.3 WECO ENGINEERING & CONSTRUCTION LIMITED

4.3.1 Status: Senior QA/QC Engineer Supervisor.

4.3.2 Period: October 1996 to July 2005

4.3.3 Projects Handled:

4.3.3.1Fabrication, Assembly and Load out of Okan/Ewan Tripod Platform

Jackets and Deck structures from October 1996 to June 1997 for

Chevron Nigeria Limited.

4.3.3.2Prefabrication and load out of Meren II and Parabe Platforms Manifolds, Separators, Surge, Skimmers, Chemeletrics, Flare Scrubber Vessels, Piping including Pipeline pumps piping and structural deck extensions from December 1996 to November 1997 for Chevron Nigeria Limited.

4.3.3.3Prefabrication of Piping, Installation of Piping, Equipment/Modules of Escravos Terminal Expansion Project from December 1997 to February 1998 for Chevron Nigeria Limited.

4.3.3.4Fabrication, Assembly and Load out of Etim “D” & Ubit “K” 4 Leg Wellhead Jackets, Boat landings, Riser guards and Risers from March 1998 to October 1998 for Mobil Producing Nigeria Unlimited.

4.3.3.5Prefabrication of Piping, Installation of Piping, Equipment/Modules of Escravos Gas Expansion Project from September 1998 to October 1999 for Chevron Nigeria Limited.

4.3.3.6Installation of Glycol Contactor, Compressor Module, Process Module, Generator, Sump Tank and Glycol Regeneration Skids and Hook-up of their various interconnecting piping and Tie-in’s and Commissioning for Escravos Gas Expansion Project from February 2000 to December 2000.

4.3.3.7Ebughu Upgrade which involved installation of separator and its interconnecting piping, tie-in the new lines to the existing production platform and installation of new metering skid, Preparation of Hydrotest Packages. Hydrotest of the lines, Hand-over Packages Prepare “As-Built” and lines modifications for ADDAX PETROLEUM DEVELOPMENT LTD. From January 2001 to March 2001.

4.3.3.8Fabrications and Installation of Abiteye and Olero Community Power Station Buildings and Piping and Okan 63/Delta South Water Injection Deck Extension, Conductor Guide and various interconnecting Piping For Chevron Nigeria Limited Offshore Locations from April 2001 to January 2002.

4.3.3.9Fabrication, Assembly and Load out of Adanga Jacket and Deck Extension Platform include Installation of Anode, and Boat landing, for Addax Petroleum Development Ltd, from January 2002 to March 2002.

4.3.3.10Fabrication, Assembly and Load out of Yoho “YA_ Initial Wellhead Platform include

Conductor Guide, Boat landing Docking Pile, Anode installation, Riser Clamp and

Expedite the clearance, storage, traceability of materials, Physical inspect and check

on all condition of Client supplied materials, Generate and maintain a records of all

Clients supplied materials and ensure return of unused and Project surplus to the Client,

Received Project Materials according to Heat Number and Mill Certificate and

Prepare materials Shortage list to be procured locally for EXXON MOBIL

Platform Jacket from March 2002 to Aug 2002.

4.3.3.11Supervision of Adanga Topside Installation works which involved installation of 8” &

6” Pig Launcher and its interconnecting piping, tie-in the new lines to the Manifold &

Production Headers, Installation of Davit Crane, Preparation of Hydrotest Packages,

Hydrotest of the new lines, Hand-over Packages and Prepare “As-Built” for

ADDAX PETROLEUM DEVELOPMENT LTD. From Aug., 2002 to Nov 2002.

4.3.3.12Fabrication, Assembly and Load out of Oron EWT and EBNE Platform Guide, Boat

landing, Decks and Frames, Anode installation, Expedite the clearance, storage,

Traceability of materials, Physical inspect and Quality check on all condition of Client

Supplied materials, Generate and maintain a records of all Client supplied materials

and ensure return of unused and Project surplus to the Client, Received Project

Materials according to Heat Number and Mill Certificate and Prepare materials

Shortage list to be procured locally for ADDAX PETROLEUM DEVELOPMENT

LTD from Aug 2003 to April 2004.

4.3.3.13Fabrication, Assembly and Load out of Tripod Jacket Deck, Piles and Flare boom

Include Anode installation and Expedite the clearance, storage, traceability of

Materials, Physical inspect and check on all condition of Client supplied materials,

Generate and maintain records of all Clients supplied materials and ensure return of

unused and Project surplus to the Client, Received Project Materials according to

Heat Number and Mill Certificate and Prepare materials Shortage list to be procured

Locally for Technip EPC 1A Project EXXON MOBIL Platform Jacket from

May 2004 till Date.

4.3.3.14Fabrication and load out of Meji B Riser & Compression Platforms Manifolds, piping

and Bridge Landing, Cellar and Sub-Cellar Decks and Helideck from June 2004 to

Date for Chevron Nigeria Limited

4.3.1 Duties Covered:

4.3.1.1Planning, Organizing and Co-ordinating QA/QC Activities especially Dimensional Checks of

Structures and Piping.

4.3.1.2Developing QA/QC Plans and Procedures for different Projects.

4.3.1.3Liasing with Client Representatives on Quality matters.

4.3.1.4Co-ordinating the Third Party Inspection Companies

4.3.1.5Preparing WPS and Qualifying same, Preparing Material Control Procedure, Painting Procedure, Hydrotest Packages, Hydrostatic Testing Procedure, Dimensional Control Procedure and Welders Qualification for different Projects.

4.3.1.6Carrying out Project QA/QC Audit during and after Project Execution.

4.3.1.7Establish and maintain an overall materials delivery report indicating status and estimated arrival dates of all free issue materials, log all material related documents (including inspection certificates and drawings into and out of the Material Department.

4.3.1.8Planning/Scheduling, Preparing a Work Break down Structure (WBS), Participate on tenders in respect to costing. Preparation of cut sheets for structural prefabrications, fabrication design work plan procedure, work break-down structure and other project document.

4.4 Project Support As Project Engineer:

4.4.1 Period: February to July 1999

4.4.2 Project: Obite Gas Project Pipelines and Cables Network for Elf Petroleum

Nigeria Limited.

4.4.3 Duties: Planning/Scheduling, Preparing a Work Break down Structure (WBS),

Control of Fabrication and Installation in accordance with Schedule,

Coordinating Pigging, Hydrotesting, Swabbing, Vac Drying and Innerting

of 12” & 14” Pipelines and Flow lines. Preapare section budget and authorized

work within financial authority level. Develop and implement maintenance

Procedure, work instruction and contribute to the development of third

Party services contracts to support field maintenance activities.

4.5 Company: McDermott – ETPM Warri.

4.5.1 Status: Procurement/Logistics

4.5.2 Period: October 1995 – 1996

4.5.3 Projects Handled:

4.5.3.1Prefabrication of Piping, Load out, Demolition and Installation of Interconnecting

Piping, Separator, Surge, Flare scrubber, Chemeletric and Skimmer Vessels,

Maintenance of Pumps; Generators and Pipeline systems. Installation of Pumps,

Compressors, Deck extensions, Instrumentation and Electrical Units during Meji

Production Platform Upgrade for Chevron Nigeria Limited from October 1995 to

March 1996.

4.5.3.2Prefabrication of Piping, Load out, Demolition and Installation of Interconnecting Piping, Separator, Surge, Flare scrubber, Chemeletric and Skimmer Vessels, Pumps, Compressors, Deck extensions, Instrumentation and Electrical Units during Okan Production Platform Upgrade for Chevron Nigeria Limited from April 1996 to August 1996.

4.5.3.3Prefabrication of Piping, Load out, Demolition and Installation of Interconnecting Piping, Separator, Surge, Flare scrubber, Chemeletric and Skimmer Vessels, Pumps, Compressors, Deck extensions, Instrumentation and Electrical Units during Okan Satellite I & II Production Platform Upgrade for Chevron Nigeria Limited from September 1996 to October 1996.

4.5.4Duties Covered:

4.5.4.1 Preparing Project Bill of Material, Generating Material Take Off List, Procure after Market Survey and Co-ordinate Material receiving and Sent to Different Locations/Department that requested for the Materials Interpret document such as Safety Rules, Operating System, maintenance and other Correspondent.

4.6 Company: Offshore Pipelines International Incorporated (OPI)

4.6.1 Status: Field Engineer – QA/QC Option

4.6.2 Period: April 1993 to April 1995

4.6.3 Projects Handled:

4.6.3.1Fabrication and assembly of Okan, Meren and BOP Living Quarters

Platform, Nigeria Standard Caisson Wellhead Platforms, Opuekeba

Production, Treater and Utility Platforms, for Chevron Nigeria Limited

From April 1992 to March 1994.

4.6.3.2Fabrication and assembly of North Apoi “J” and Okubie “A” Production

Platforms for Texaco Overseas Petroleum Company of Nigeria from

September 1993 to March 1994

4.6.3.3Fabrication and assembly of Edop Debottlenecking Gas Producing Platform for Mobil Producing Nigeria Unlimited from April 1994 to October 1994

4.6.3.4Refurbishment of Santa Fe Key Bermuda Drilling Rig from November 1994 to March 1995.

4.6.4Duties Covered:

4.6.4.1Interpretation, assisting in the follow up of Construction Drawings and Fabrication monitoring per approved Client Specifications, Codes and Standards.

4.6.4.2Preparation of NDT Drawings, Pressure/Leak Testing on Process Piping and

Pipelines.

4.6.4.3 General Supervision and Inspection of Fabrication Works, Welder and

Welding Procedure Qualifications.

4.6.4.3Dimensional Control, Material Control and Visual Weld Inspection per approved Fabrication Procedures.

4.6.4.4Prepare Material Take-off with AFC Drawings; separate the Long lead Items from bought out materials those to be Air freighted and Marine Cargos. This when receive Inspection check are made to ascertain the good condition of the materials will deliver to the requisitioned.

5.0 Company: Offshore Pipeline Inc. Onne, Rivers State

5.1 Status: Procurement/Material Control (NYSC)

5.2 Period: 1992 – 1993

5.3Inspection of materials, if conformed to specification provide materials take-off and

Specify materials shortlist. Documentation of mill certificate of materials required for

The project, Inspection of materials and traceability in accordance with heat codes

and Heat number. Procure according to specification by the requisitioner after Market

Survey.

6.0 Company: Chevron Nigeria Limited

6.1 Status: Field Engineer (I.T.F.)

6.2 Period: JUNE1990-NOVEMBER 1990.

6.3 Maintenance of different types of Pump and valves at Abiteye Flow Station,

Collection of Oil samples at various Well Head and test for API Gravity and report

to Escravos for further verifications. Monitoring/Control of the Pressure and

Temperature of the Production Vessels and Pumps. Carrying out individual well tests

and Laboratory analysis. Carrying out meter proving/calibration Carrying out

Routines, Preventive, and a breakdown Maintenance of a reciprocating gas

Compressors and Water Pumps. Services of Caterpillar engine (gas, diesel pumps)

General Maintenance of Pipeline and equipments. Supervision of Wax Cutting,

Setting of valves, Gas lifting operations, swaging operation, fishing operation, sand

balling, Swabbing operation, and Down Hole running of electronic gauge.

Interpretation of the result and the production of the reports. General Maintenance of

Tools and Equipments.

COMPUTER PROFICIENCY: Familiar with the following computer packages:

Microsoft Word, Excel, Access, AutoCAD, Microsoft Project and

Power Point.

ASSOCIATION: ASSOCIATE MEMBER – AMERICAN WELDING SOCIETY (A.W.S)

ASSOCIATION OF CORROSION ENGINEERS

NIGERIAN SOCIETY OF ENGINEERS

MATERIALS / METALLURGICAL SOCIETY OF

NIGERIAN.

HOBBIES: READING, HORTICULTURE AND SWIMMING.

REFEREE: AS REQUESTED BY CLIENT



Contact this candidate