Updated ** May **** Page * of *
Leopoldo Cienfuegos
PPL PIPING DESIGNER
*********@*****.***
CAREER SUMMARY
Experience as a piping designer/field engineer in the office, as well as in the field. Experienced with several 3D modeling computer programs. Experience on a variety of projects would include:LNG plants,chemical plants, gas plants, oil refineries, compressor stations, separator facilities, pump stations, metering skids, process modularization and storage tank facilities. Knowledge and application of Codes & Standards: ASME B31.3, ASME B31.8, API, ASME/ANSI, ASTM, NFPA AND OSHA. Experience with work share design and production of piping deliverables with various Offices India/Mexico/Philippines
EXPERIENCE
PPL S3D Piping Designer/Field Engineer, Feb 2019-Present TechnipFMC
Ineos Debottlenecking Project OBD2 Ethelene Cracker – Houston TX
• Responsible for verifying and designing Tie-ins in existing plant
• Model Equipment and Update Tie-ins using S3D software and LFM software
• Coordinate design issues with workshare office in Mumbia India
• Model existing piping systems and equipment using S3D software
• Review and walkdown new tie-in locations with client, construction and operations
• Verify layout of new piping and equipment in the existing Ineos plant
• Work with stress dept to resolve pipe support issues
• Assist site construction activities with engineering questions
• Respond to construction RFI
• Revise and As-built Isometrics
• Review quality surveillance and non-conformance reports, respond with engineering dispositions PPL Piping Designer/Field Engineer, May 2015-Feb 2019, CB&I/McDermott
Freeport LNG Project – Freeport TX
• Process Modularization of cryogenic piping and critical equipment for cryogenic piping for expander compressor area during pre-feed/feed and detail design.
• Equipment and piping layout of amine filtration and drain system Pretreatment Facility
• Piping layout out of underground amine drain system
• Perform nozzle orientation for amine reflux and carbon filter vertical drums
• Layout of Cold Box equipment and piping
• Perform nozzle orientation & platform arrangement for amine drain horizontal drum
• Coordinated and ran client model reviews using smart plant review
• Review and coordinate design changes made in Philippines workshare office
• Equipment location plans
• Squad check vendor information and other discipline drawings Updated 23 May 2018 Page 2 of 6
Leopoldo Cienfuegos
PPL PIPING DESIGNER
*********@*****.***
• Coordinated design issue with other disciplines
• Extract nozzle orientation drawings
• Assist site construction activities with engineering questions
• Respond to construction RFI
• Revise and As-built Isometrics
• Review quality surveillance and non-conformance reports, respond with engineering dispositions
• Tri-party walks for Pre-commissioning activities & turnover Sr. PDS Plant Layout Designer, August 2014- May 2015 Burns & McDonnell
Oneok Knox Gas plant – Houston TX
• Layout of de-ethanizer tower and nozzle in Cryogenic area
• Responsible for refrigeration compressor area and cryogenic area
• Coordinated design and flexibly issue with other disciplines
• Updated piping supports using Pelican Forge support modeler Software
• Coordinated piping issues, vendor issues, with our work share office in Mumbai India
• Helped in design and technical issues for modular built pipe racks and structures
• Modeled equipment and piping using PDS
Conoco Phillips – Houston TX
• Responsible for layout of three stage EPG refrigeration compressor and critical piping
• Responsible for routing main cryogenic piping and resolve stress piping issues
• Model piping and equipment using PDS
• Resolve technical issues such as safety, maintenance, operation with client and other disciplines
• Updated piping supports using Pelican Forge support modeler Software
• Use LFM viewer to route piping in existing areas PDS Plant Layout Designer (Area Piping Lead), September 2010-August 2014 Technip USA
Nova Chemical LLDPE project – Houston TX
• Responsibilities included layout of piping and the arrangement of equipment in Nova Chemical LLDPE Polyethylene Joffre plant
• Design & layout of rail barn loading and unloading equipment, DIN conveying piping
• Layout of structure for Dry-end using PDS
• Helped in design basis, technical issues for modularization of pipe racks and structures
• Participated in client model reviews
• Reviewed technical issues on vendor packages for the dry-end. Routed all gravity fed & dilute phase pneumatic conveying lines for the chemical plant.
• Assist overall Project piping lead with project issues, progress reporting, and technical issues. Updated 23 May 2018 Page 3 of 6
Leopoldo Cienfuegos
PPL PIPING DESIGNER
*********@*****.***
Exxon Elite Project – Houston TX
• Responsibilities include layout of piping and the arrangement of equipment in Exxon Elite project in Baytown refinery.
• Performed nozzle and platform orientation for new reactors and drums in the new central processing facility structure.
• Layout of new vacuum distillation piping system
• Layout of new condenser and air cooler
• Submitted isometrics for stress analysis and worked directly with the stress engineers to solve piping flexibility problems
• Interacted directly with other disciplines to solve design issues Basf Tigris Feed Project– Houston TX
• Responsibilities include layout of piping and the arrangement of equipment during plot plat development in Tigris FEED
• Involved in developing proposal package & man-hour estimate for client.
• Modeled equipment and piping using PDS.
• Conceptual layout of dry Catalyst manufacturing blending facility.
• Conceptual routing of conveying piping and loading area.
• Bulk piping material take-off
Oxy Chemicals De-Oiling Project– Houston TX
• Responsibilities include layout of piping and the arrangement of equipment in Occidental Muk Project in Dehydration and De-oiling unit in Oman
• Performed nozzle and platform orientation for Ion exchange storage tank in the central processing facility. Modeled equipment and piping using PDS
• Submitted isometrics for stress analysis and worked directly with the stress engineers to solve piping flexibility problems
• Extracted isometrics from the model. Smart Plant was used to review additions and changes in the model. Model reviews with client.
• Locate and sketch tie points from existing client drawings using LFM Viewer.
• Responsible for reviewing design changes made in workshare office in Monterrey Mexico Sr. Piping Designer, December 2009-September 2010
CRA Engineering
Enterprise Storage Facility Revamp– Houston TX
• Layout of filter separator vessel and metering piping
• Layout of metering piping and instruments on skid package units in the existing storage facility using Bentley Auto plant 3D & Cadworx.
• Located and field verified tie-in points for new process lines
• Sketched tie-in points in field and submitted to our office for design. Verified that hot-tap locations and tie-in points were able to be executed by contractor in the field
• Field routed new process lines in existing EPCO Mount Belvieu plant. Updated 23 May 2018 Page 4 of 6
Leopoldo Cienfuegos
PPL PIPING DESIGNER
*********@*****.***
• Responsible for construction support
Sr. Piping Designer, February 2009-December 2009
Shaw E&C
Dow Chemical RTIP FEL Project– Houston TX
• Responsibilities included the layout of piping and the arrangement of equipment in several areas that included process separation trains in a unit for Dow Chemical and RTIP FEL project
• Lay out of piping for the high pressure S&T heat exchangers and high pressure air coolers
• Modeled equipment and piping using PDS, 3D software.
• Bulk Material take-off for initial estimate.
• SPR Model Reviews with client.
Sr. Piping Designer, April 2008-February 2009
Technip
Valero Saturated Refinery Gas recovery Unit Expansion– Houston TX
• Responsible for the layout of piping and the arrangement of equipment in Process Modules in Valero Saturated Gas Recovery Unit Expansion in Port Author, Texas.
• Responsibilities included module structure for blowdown system and equipment.
• Participated in reviews for modular construction and transportation.
• Squad checked vendor drawings for piping in several areas and set nozzle orientation for drums.
• Interacted with other disciplines to solve inter-discipline issues. Sr. Piping Designer, December 2007-March 2008
Aker Plant Services Group
Bigler Expansion Project – Deer park TX
• Performed piping studies and the preliminary layout of equipment on a Bigler expansion project in Pasadena TX
• Field verified dimensions for drawings and tie points on existing lines.
• Lay out pumps and pipe in the existing process plant using PDMS 3D modeling.
• Responsible for an area that consisted of several shell and tube heat exchangers, drums and towers.
• Oriented the nozzles and platforms on several towers. Ran clash review reports and resolved clash problems
Sr. Piping Designer, January 2007- December 2007
Fluor
Lion Oil Refinery – Sugarland TX
Updated 23 May 2018 Page 5 of 6
Leopoldo Cienfuegos
PPL PIPING DESIGNER
*********@*****.***
• Responsibilities included piping studies and the preliminary layout of equipment on a Lion Oil Refinery crude unit expansion project in El Dorado, Arkansas.
• Oriented the nozzles and platforms on several towers. Ran clash review reports and resolved clash problems.
• Lay out pumps and pipe in the existing process plant using a laser mapping viewer.
• Interacted with engineers and other disciplines on solving problems. Squad checked vendor drawings and issued drawings for construction
Piping Designer, November 2003-January 2007
Triad Engineering
Enterprise Storage Facility – Baytown TX
• Duties included laying out equipment and pipe at an Enterprise products storage facility and refinery
• Also, layout of meter piping and instruments on skid package units and stick built meter piping and instruments in the existing storage facility.
• Created plans, sections and isometrics using AutoCAD 2004 (Flex Tabs Iso, Flex Tabs pipe, Flex Tabs Flow).
• Layout pig launchers and receivers and the associated piping coming from the underground pipeline using 5D bends in an existing storage facility. Designed natural gas piping going to the wellheads and from the well heads to the degasser
• Shot elevations at the existing plant for new equipment and piping. Layout of new pump stations and developed construction drawings
Piping Drafter/ Designer, March 1999-November 2003 BGI
DuPont Nemours Chemical Site – LaPorte
• Field Verify Dimensions for Drawings and tie-in points. Elevation Survey & Dimension Calculations and P&ID walk downs.
• Estimated Material and labor cost for customers. Fast pipe software and MCA (mechanical contractors association) labor manual.
• Draft existing piping systems for DuPont Engineers.
• Design systems from AutoCAD Software (2000 Lite, 2002, 2005 lite) Cadworx. Create a BOM and submit to purchasing department.
Updated 23 May 2018 Page 6 of 6
Leopoldo Cienfuegos
PPL PIPING DESIGNER
*********@*****.***
EDUCATION& SOFTWARE
San Jacinto College 1998-2000
S3D Piping & Equipment Hexagon
Plant Design Software (PDS)
Cadworx
Orthogen
PDMS
Autoplant Bentley
LFM Scan
Pelican Forge support Software
Smartplant Review
Navisworks
Flexcad 2D software
Mircostation
Autocad