Curriculum Vitae
Proposed Position: Civil Engineer
1. Name of Firm:
CONSULECTRA Unternehmensberatung GmbH
2. Name of Staff:
Adil Kurtcu
3. Date of Birth:
11.06.1953
Nationality:
Turkish
4. Education
1972 – 1979 B.Sc. in Civil Engineering, Cukurova University, Adana-Turkey.
5. Membership of Professional Associations:
Member of TMMO (Architects&Civil Engineers) in Turkey
6. Other Training
Studied German Language in Iserlohn & Architecture in Dortmund.
7. Countries of Work Experience (last 10 years)
Mozambique, Ethiopia, Tajikistan, Qatar, Turkey, Afghanistan, Saudi Arabia, UAE
8. Languages (good, fair or poor)
Speaking
Reading
Writing
Turkish
mother tongue
mother tongue
mother tongue
English
good
good
good
German
Fair
Fair
Fair
Arabic
poor
-
-
9. Employment Record
2017-2017 Consulectra Unternehmensberatung GmbH
2017-2017 MVV Decon GmbH
2014-2015 FICHTNER GmbH & Co. KG
2012-2014 FICHTNER GmbH & Co. KG
2011-2012 General Electric - WTG Project
2010-2011 Lahmayer International
2008-2010 FICHTNER GmbH & Co. KG
2007-2008 FICHTNER GmbH & Co. KG
2006-2007 Metag Construction & Trade Co. Inc.
2005-2006 Metag – Yenigun J.V. Co.
2003-2004 Havatek Construction Co.
2001-2002 Guris – Aymir A.D.
2000-2001 Metis – Peker Co
1997-1999 International Center for Commerce and Contracting Co.
1992-1996 International Center for Commerce and Contracting Co.
1989-1991 Moll Arabia Ltd.
1985-1986 Tefken Co.
1983-1985 Oz-Ak Civil Engineering and Contracting Co.
1979-1983 Oz-Ak Civil Engineering and Contracting Co.
1979-1979 Foster Wheeler Co.
Name of assignment or project: PERIP
Year: 2017 - 2017
Client: Mozambiquian Electricity Authoraties (EDM)
Company: Consulectra Unternehmensberatung GmbH
Location: Mozambique
Main project features: Visited and inspected the entire HV substations
Positions held: Civil Engineer
Activities to be performed: Worked as Civil Engineer in entire areas of Mozambique for Consulectra, PERIP project.
Name of assignment or project: EEP
Year: 2017 - 2017
Location: Ethiopia
Client: Ethiopian Electrical Authoraties (EEP)
Company: MVV Decon GmbH
Main project features: 400 kV and 230 kV transmission lines; excavation, concrete works, and tower installations.
Positions held: Civil Expert
Activities to be performed: Worked as Civil Expert for entire areas at Dukem, Debrezeit, Mojo and Ginchi for transmission lines, for 400 kV and 230 kV transmission lines’ excavation, concrete works, and tower installations, in Ethiopia for EEP.
Name of assignment or project: Rectification and rehabilitation works for existing HV substations.
Year: 2014 - 2015
Location: TAJIKISTAN
Client: Tajikistan Electricity Authoraties (Barki Tojik)
Company: FICHTNER GmbH & Co. KG
Main project features: New OH Transmission Lines, new HV substations
Positions held: Resident Civil Engineer & Civil Expert
Activities to be performed: Rectification and rehabilitation works for existing HV substations. Consultant’s Resident Civil Engineer & Civil Expert, for new OH Transmission Lines, new HV substations.
Name of assignment or project: Ain Khalid Super S/S
Year: 2012 - 2014
Location: Doha, QATAR
Client: Qatar Electricity Authorities (Kahramaa)
Company: FICHTNER GmbH & Co. KG for Kahramaa
Main project features: Worked as Consultant’s “Civil Site Engineer”, for Ain Khalid Super S/S, that contains 220/66/11kV GIS & Switchgear building and relevant 200MVA/40MVA Transformers and 1500kVA AUX. Transformers structures mainly. Project had also, 60 MVAR Shunt Reactors, Fire Water Tanks and Fire Water Pump Room, under ground Oil Containment Tank, Substation Internal Roads, Potable Water Tank, Septic Tank, Guard House, Boundary Wall etc.
Positions held: Civil Site Engineer
Activities to be performed: Civil works
Name of assignment or project: General Electric WTG Project “Wind Turbine Generator Project”.
Year: Oct. 2011 - Feb. 2012
Location: Balıkesir-TURKEY
Client: Turkish Electricity Authorities (TEDAS)
Company: GENERAL ELECTRIC
Main project features: Technical Advisor as Consultant. for 52 numbers of Wind Turbine Generator Project.
Positions held: Civil Technical Advisor
Activities to be performed: Worked as Civil Technical Advisor as Consultant.
Name of assignment or project: 4 Numbers Substations, (132/33/11kV and 132/11kV) for FEWA.
Year: April 2010 – 31 August 2011
Location: Fujairah - UAE
Client: UAE Electricity Authorities (FEWA)
Company: Lahmayer
Main project features: Substation Switchgear Buildings, Transformers (100 MVA) foundations with RC Fire Wall, Fire Water Pump Room, Fire Water Tank Foundation, Boundary Wall, Roads, Water and Waste Water Lines with Manholes, Septic Tanks/ Holding Tanks, Water Tanks.
Positions held: Resident Civil Engineer & Civil Expert
Activities to be performermed: Consultant’s civil site manager.
Name of assignment or project: Transmission System Expansion Phase VIII (220/66/11kV), for Qatar Electricity & Water Corporation Fichtner GmbH & Co. KG for Kahramaa.
Year: 2008-2010
Location: Doha, QATAR
Client: Qatar Electricity & Water Corporation (KAHRAMAA)
Company: Fichtner GmbH & Co. KG.
Main project features: Completing the Construction of 4 Nos. of Substations, as Consultant’s Civil Site Manager from Qatar Power Transmission System Expansion Phase VIII (220/66/11kV), for Qatar Electricity & Water Corporation (KAHRAMAA)
Positions held: Consultant’s civil site manager.
Activities to be performed: Project was having Substation Switchgear Buildings, Transformers (100 MVA) foundations with RC Fire Wall, Fire Water Pump Room, Fire Water Tank Foundation, Boundary Wall, Roads, Water and Waste Water Lines with Manholes, Septic Tanks/ Holding Tanks, Water Tanks.
Name of assignment or project: Construction of 4 numbers of Substations.
Year: 2007-2008
Location: Doha, (State of Qatar)
Client: Qatar Electricity & Water Corporation (KAHRAMAA)
Company: Fichtner GmbH & Co. KG.
Main project features: Completed the Construction of 4 Numbers of Substations at ‘’Mesaieed Industrial City’’ including 220/132/66/11 kV, 220/66/11 kV and 66/11 kV in the Mesaieed Industrial City of Qatar under contract No. GTC/123/2006 – Qatar Power Transmission System Expansion – Phase VII Packages 2, 3, 4
Positions held: Civil Site Manager
Activities to be performed: Completed the Construction of 4 numbers of Substations at ‘’Mesaieed Industrial City’’ including 220/132/66/11 kV, 220/66/11 kV and 66/11 kV in the Mesaieed Industrial City. Project was having Switchgear Buildings, Transformers (315 MVA) foundations with RC Fire Wall, Fire Water Pump Room, Fire Water Tank Foundation, Boundary Wall, Roads, Water and Waste Water Lines with Manholes, Septic Tank/ Holding Tank, Water Tank.
Name of assignment or project: “Border and Uniformed Police Head Quarters Project for Afghani Government.
Year: 2006-2007
Location: Zaranj, Afghanistan
Client: Afghan Military
Company: Metag Construction & Trade Co. Inc.
Main project features: Infrastructure project, comprising all civil works
Positions held: QA/QC Manager – Civil Works
Activities to be performed: Infrastructure project, comprising all civil works for diesel power plant, fuel storage stations, pumping stations, administrative buildings, clinics, general storage and maintenance buildings, logistic supply point, water well, water and waste water lines and structures with treatment plant, trash points, parking areas, asphalt roadways and perimeter stone walls.
Name of assignment or project: “Zafaar Head Quarter Project for Afghan Army at Herat and Kandahar in Afghanistan”
Year: 2005-2006
Location: Kandahar, Afghanistan
Client: Afghan Military
Company: Metag – Yenigun J.V. Co.
Main project features: Infrastructure project for Afghan Army, comprising all the civil works
Positions held: Senior Principal Civil Engineer & Project Manager
Activities to be performed: An infrastructure project for Afghan Army, comprising all the civil works for diesel power plant, fuel storage stations, pumping stations, administrative buildings, clinics, general storage and maintenance buildings, logistic supply point, water well, water and waste water lines and structures with treatment plant, trash points, parking areas, asphalt roadways and perimeter stone walls.
Name of assignment or project: Rehabilitation & Renewing of Tanks and pipelines for Turkish Petroleum Office Company.
Year: 2003-2004
Location: Turkey
Client: Turkish Petrolium Company
Company: Havatek Construction Co.
Main project features: Rehabilitation and renewal of fuel tanks and pipe lines, construction of new transformer / power supply buildings and refuel stations.
Positions held: Principal Civil Engineer
Activities to be performed: Rehabilitation and renewal of fuel tanks and pipe lines, construction of new transformer / power supply buildings and refuel stations.
Name of assignment or project: Water and Waste Water Project
Year: 2001-2002
Location: Tarsus, Turkey
Client: Tarsus Municipality
Company: Guris - Aymir A.D.
Main project features: Installation of potable, non-potable and storm water lines with house connections and sewage lines up-to and including the respective water treatment plant.
Positions held: Site Manager – Civil Works
Activities to be performed: Installation of potable, non-potable and storm water lines with house connections and sewage lines up-to and including the respective water treatment plant.
Name of assignment or project: Boarding School Project (YIBO Construction)
Year: 2000-2001
Location: Batman, Turkey
Client: Turkish Education Ministry
Company: Metis - Peker Co.
Main project features: Civil works and power supply facilities for boarding primary school
Positions held: Project Manager – Civil Engineer
Activities to be performed: Civil works
Name of assignment or project: Construction of Disabled Children Rehabilitation Center
Year: 1997-1999
Location: Jeddah, Saudi Arabia
Client: Saudi Education Ministry
Company: International Center for Commerce and Contracting Co.
Main project features: Civil works, installation and commissioning of complete infrastructure including Transformer and Switchgear buildings for the Disabled Children Rehabilitation Center.
Positions held: Senior Principal Site Manager – Civil Works
Activities to be performed: This project involved all civil works, installation and commissioning of complete infrastructure including Transformer and Switchgear buildings for the Disabled Children Rehabilitation Center.
Name of assignment or project: Construction of Beach Palace for His Royal Highness Prince Mohammed Bin Naif.
Year: 1992-1996
Location: Jeddah, Saudi Arabia
Client: Royal Highness Prince Mohammed Bin Naif
Company: International Center for Commerce and Contracting Co.
Main project features: Civil and Architectural works, installation and commissioning of complete infrastructure including complete Jetty and Marina, Swimming Pool with related facilities, Diesel power plant and associated switchgear buildings for the Beach Palace of His Royal Highness Prince Mohammed Bin Naif.
Positions held: Principal Site Manager – Civil Works
Activities to be performed: Civil and Architectural works, installation and commissioning
Name of assignment or project: Construction of High Voltage Substations at Thager and Al Falak
Year: 1989-1991
Location: Saudi Arabia
Client: Saudi Electricity Authorities (SCECO)
Company: Moll Arabia Ltd. (Leonard Moll)
Main project features: Installation of Substations including Transformer and Switchgears buildings for 400 kV Substation at Thager and 275 kV Substation at Al Falak in Jeddah.
Positions held: Civil Site Engineer
Activities to be performed: Civil works, installation and commissioning
Name of assignment or project: Taif City Water and Waste Water Project
Year: 1985 - 1986
Location: Saudi Arabia
Client: Taif Municipality
Company: Tefken Co.
Main project features: Potable, non-potable and storm water drainage lines with house connection
and sewage lines with septic tanks for Taif City in Saudi Arabia.
Positions held: Civil Site Engineer
Activities to be performed: Civil works, installation and commissioning
Name of assignment or project: Poject Management services as freelance Civil Engeneer
Year: 1983 - 1985
Location: Turkey
Client: Turkish Municipalities
Company: Oz-Ak Civil Engineering and Contracting Co.
Main project features: Worked as preparation of design, drawings and contracting of public housings and commercial buildings.
Positions held: Civil Engineer and Project Manager
Activities to be performed: Civil works and rendered Project Management services.
Name of assignment or project: Housing Projects
Year: 1979-1983
Location: Turkey
Client: Turkish Municipalities
Company: Oz-Ak Civil Engineering and Constracting Co.
Main project features: Construction of Housings
Positions held: Civil Engineer and Project Manager
Activities to be performed: Completed various Housing Projects
Name of assignment or project: Construction of Thermal Power Plant
Year: 1979-1979
Location: Turkey
Client: Kahraman Maras Electricity Authorities
Company: Foster Wheeler Co.
Main project features: Construction of Thermal Power Plant
Positions held: Quality Control Civil Engineer
Activities to be performed: Thermal Power Plant