Ahmed MagdyAbdelghany
E-mail: adhhci@r.postjobfree.com, adhhci@r.postjobfree.com
Address: *,** ******* ***** **** compound 127 khaldya, Giza Egypt Telephone:(202-******** (home)/01157773233-01278718539 (mobile) Objective
Seeking a challenging position in the field of construction at a reputable progressive organization where my Personal skills and my background can be developed and well utilized. Profile:
Civil and Arch. Engineer in the field of Construction with strong technical information developed through 8 years of experience in construction sites in mega projects and also in Mechanical Installation and Maintenance HVAC & F.F & Plumbing & Infra Structure and Swimming Pools, and I have many solutions of executive for these fields & I execute these systems through Several classifications of Buildings such as Public areas &Malls & factories & Administrative & Residential…. etc. Buildings, proven self-starter with strong leadership and communication skills developed through development courses and executive positions held in sites, I have knowledge and experience using international codes and standards also computer skills include Microsoft office, AUTOCAD, I have a good back ground about using Autodesk I have very good knowledge of LEED AP & green buildings or renewable energy and also I have very good knowledge of Project management and planning, I have a good back ground with dealing Primavera. Education
January 2012The faculty of engineering Cairo university
Bachelor of Construction Engineering and Management
Grade: good, cumulative GPA (2.26)
Graduation project: New Abu Qir Power Plant
Grade: B+(85% < B+ < 90%)
Graduation project deliverable:
1. Project description
2. Scope definition and work break down structure (WBS) 3. Quantities take off
4. Study of alternatives (using the analytical hierarchy process and the simple scoring methods)
5. Method statement
6. Activity listing, resource identification, and duration estimating 7. Activity sequencing (logic diagram)
8. Computerized scheduling (using primavera P6)
9. Resource profiles and allocation
10. Project cost and s-curve
11. Cash flow and over draft analysis
12. Quality and safety plans
Page 2
13. Risk plan
14. Contract analysis and comparisons with standard forms (FIDIC) 15 What if scenario
High school (AMERICAN DIPLOMA Graduate)
DAR EL TARBIAH SCHOOL ZAMALEK GIZA EGYPT
Middle school
Manor house school
Courses:
PMP (project management profession)
Arab contractors training center: level 1, 2 and 3 Experience
Trainings:
Summer trainee 1: Noddana Consultant, in South Africa (2010) (Approved in the transcript)
Project: Multi level parking of Cresta shopping center.
Duration: 3 weeks
Location: Johannesburg the heart of the affluent residential nodes between Sandton to the Northeast and Ransburg to the Northwest.
- Construction methods:
Post tension slabs
Concrete works
Piles
Summer trainee 2: Arab contractor, (2011) (approved in the transcript)
Project: Development of embaba airport land
Duration:2 months
Location: Southern area by "bridge Ahmed Orabi"
- Construction methods:
Piles
Bridges
Tunnel
Traditional concrete building
Page 3
Work experience:
Employer: Arab contractor investment
Project name: October princes compound (206 villa)
Consultant: APG
General Contractor: arab contractor
Owner: arab contractor investment
Job Title: site engineer
Start Month / year: 5/2012 to 4/2013
Responsibility:
Traditional concrete building 12 villas
Water tank
fence
Pilaster
Painting
Blockwork
Wooden doors
Infrastructure
Employer: OrascomBesix
Project name: Mall of Egypt
Consultant: Medhatabouzad
Owner represented: David Langton
General Contractor: orascom besix
Owner: Magedelfuttem
Job Title: site engineer
Start Month / year :5/2013 to1/2016
Responsibility:
Page 4
Civil work traditional concrete building from foundation (isolated footings) from excavation
Check bill for sub-contractor, and preparing project invoices.
Backfilling
Gantry ramp,stair ramp and tenant pads (roof team)
Block work (roof team)
Plaster and painting (roof team)
Repair for block work and screed (roof team)
Insulation (combo system) (roof team)
Columns cladding (pilaster) (portal A,B)
Reflected celling (portal A,B)
Stones
Keystone
Metal doors
Employer: alshafar contracting
Project name: cairo festival city
Consultant: Alamar
Owner represented: Hosny pacer
General Contractor: alshafar
Owner: elfuttem
Job Title: Sr. site engineer
Start Month / year :2/2016 to 1/2018
Responsibility:
Mobilization
Submit progress reports to the Project Manager and Consultant.
Check bill for sub-contractor, and preparing project invoices. Page 5
Concrete building (32 j 3500m3,50 k 3200m3) from foundation( raft)
Insulation: cooled apply, membrane and cartonel
Backfilling
Reflected celling
Stones
Ceramic
Duct banks (L.v and fiber optics)
Valve chambers (chilled water,air,declaration)
Inspection chambers
Pump room for lake
Excavation and earth work
Fountains
Employer: Alatia holding
Project name: Alatia industrial factory
Consultant: Dr hossam taha consultation
Owner: alatia holding
Job Title: Project manager
Start Month / year :1/2018 to 3/2019
Responsibility:
Review all the projects' specifications Bill of Qty. related to the scope of work.
Inspect the executed work against the project specifications and Quality Control Standard and procedures.
Follow up preparing shop drawings, coordination drawings and submittals.
Monitor safety performance of all personnel on site and recommend improvements to safety procedures.
Follow up execute of time schedule and determine responsibility of the subcontractors for any failure to implement the contract items at the deadlines even be held accountable, and also speed to take preventive measures to prevent the occurrence of serious errors. Page 6
Finishing administrative building (plaster, painting, reflected celing, ceramic, stones, dry mix façade)
Plumbing (kastle, smart and masr elhegaz)
Feeding water (B.R black and green)
Manholes,rain drain and IC
Firefighting (fire tank)
Light current, UPS, dash board’s insulation and Earthling system.
Transformer, L.V and MDB rooms.
Boiler
Generator installation.
S.O.G around the factory and administrative building.
HVAC (split and consile) .
Employer: Orascom construction
Project name: Aburawash Waste water treatment plant
Consultant: AAW
General Contractor: Orasqualia construction
Owner: CAPW
Job Title: Senior site engineer
Start Month / year :4/2019 still working
Responsibility:
Mobilization
Excavation work and leveling and PLT test and sand cone test under PC.
Biological reactors 3 and 4 rafts and walls.
Submit progress reports to the construction Manager.
The secondary clarifiers no, 2 (10 rounded tanks 1300m3 raft and slipforms for walls)
Install and pouring encasement of 1200mm (sludge inner pipe) and 900mm(outtake pipe) and 300mm(out take pipe)
Install of power duct
Page 7
Install of slives and cantilevers (using capllers)
Install of steel structure above the tanks
125 secondary recirculation and excess sludge pumping station,124 secondary sludge outlet measurement,123 secondary clarifiers outlet water channels,122 secondary clarifiers,121 secondary clarifier distribution chamber.
119 turbo compressors and biological treatment electrical building.
Earthing
Skills
Computer skills:
Primavera P6
Quantity takeoff
AutoCAD
Expert in Microsoft office
Personal Attributes:
Negotiator
Personal skills:
English (Excellent)
Arabic (Excellent)
French (Fair)
Personal data:
Military status Exempted
Date of birth: 17/5/1987
Nationality: Egyptian Citizen
Marital status: Married
Excellent communication and presentation skills
Team player and flexible
Hard worker and Fast Learner
Page 8
REFERENCES FURNISHED UPON REQUEST