Post Job Free

Resume

Sign in

Engineer Power Plant

Location:
Cairo, Cairo Governorate, Egypt
Posted:
November 02, 2020

Contact this candidate

Resume:

Ahmed MagdyAbdelghany

E-mail: adhhci@r.postjobfree.com, adhhci@r.postjobfree.com

Address: *,** ******* ***** **** compound 127 khaldya, Giza Egypt Telephone:(202-******** (home)/01157773233-01278718539 (mobile) Objective

Seeking a challenging position in the field of construction at a reputable progressive organization where my Personal skills and my background can be developed and well utilized. Profile:

Civil and Arch. Engineer in the field of Construction with strong technical information developed through 8 years of experience in construction sites in mega projects and also in Mechanical Installation and Maintenance HVAC & F.F & Plumbing & Infra Structure and Swimming Pools, and I have many solutions of executive for these fields & I execute these systems through Several classifications of Buildings such as Public areas &Malls & factories & Administrative & Residential…. etc. Buildings, proven self-starter with strong leadership and communication skills developed through development courses and executive positions held in sites, I have knowledge and experience using international codes and standards also computer skills include Microsoft office, AUTOCAD, I have a good back ground about using Autodesk I have very good knowledge of LEED AP & green buildings or renewable energy and also I have very good knowledge of Project management and planning, I have a good back ground with dealing Primavera. Education

January 2012The faculty of engineering Cairo university

Bachelor of Construction Engineering and Management

Grade: good, cumulative GPA (2.26)

Graduation project: New Abu Qir Power Plant

Grade: B+(85% < B+ < 90%)

Graduation project deliverable:

1. Project description

2. Scope definition and work break down structure (WBS) 3. Quantities take off

4. Study of alternatives (using the analytical hierarchy process and the simple scoring methods)

5. Method statement

6. Activity listing, resource identification, and duration estimating 7. Activity sequencing (logic diagram)

8. Computerized scheduling (using primavera P6)

9. Resource profiles and allocation

10. Project cost and s-curve

11. Cash flow and over draft analysis

12. Quality and safety plans

Page 2

13. Risk plan

14. Contract analysis and comparisons with standard forms (FIDIC) 15 What if scenario

High school (AMERICAN DIPLOMA Graduate)

DAR EL TARBIAH SCHOOL ZAMALEK GIZA EGYPT

Middle school

Manor house school

Courses:

PMP (project management profession)

Arab contractors training center: level 1, 2 and 3 Experience

Trainings:

Summer trainee 1: Noddana Consultant, in South Africa (2010) (Approved in the transcript)

Project: Multi level parking of Cresta shopping center.

Duration: 3 weeks

Location: Johannesburg the heart of the affluent residential nodes between Sandton to the Northeast and Ransburg to the Northwest.

- Construction methods:

Post tension slabs

Concrete works

Piles

Summer trainee 2: Arab contractor, (2011) (approved in the transcript)

Project: Development of embaba airport land

Duration:2 months

Location: Southern area by "bridge Ahmed Orabi"

- Construction methods:

Piles

Bridges

Tunnel

Traditional concrete building

Page 3

Work experience:

Employer: Arab contractor investment

Project name: October princes compound (206 villa)

Consultant: APG

General Contractor: arab contractor

Owner: arab contractor investment

Job Title: site engineer

Start Month / year: 5/2012 to 4/2013

Responsibility:

Traditional concrete building 12 villas

Water tank

fence

Pilaster

Painting

Blockwork

Wooden doors

Infrastructure

Employer: OrascomBesix

Project name: Mall of Egypt

Consultant: Medhatabouzad

Owner represented: David Langton

General Contractor: orascom besix

Owner: Magedelfuttem

Job Title: site engineer

Start Month / year :5/2013 to1/2016

Responsibility:

Page 4

Civil work traditional concrete building from foundation (isolated footings) from excavation

Check bill for sub-contractor, and preparing project invoices.

Backfilling

Gantry ramp,stair ramp and tenant pads (roof team)

Block work (roof team)

Plaster and painting (roof team)

Repair for block work and screed (roof team)

Insulation (combo system) (roof team)

Columns cladding (pilaster) (portal A,B)

Reflected celling (portal A,B)

Stones

Keystone

Metal doors

Employer: alshafar contracting

Project name: cairo festival city

Consultant: Alamar

Owner represented: Hosny pacer

General Contractor: alshafar

Owner: elfuttem

Job Title: Sr. site engineer

Start Month / year :2/2016 to 1/2018

Responsibility:

Mobilization

Submit progress reports to the Project Manager and Consultant.

Check bill for sub-contractor, and preparing project invoices. Page 5

Concrete building (32 j 3500m3,50 k 3200m3) from foundation( raft)

Insulation: cooled apply, membrane and cartonel

Backfilling

Reflected celling

Stones

Ceramic

Duct banks (L.v and fiber optics)

Valve chambers (chilled water,air,declaration)

Inspection chambers

Pump room for lake

Excavation and earth work

Fountains

Employer: Alatia holding

Project name: Alatia industrial factory

Consultant: Dr hossam taha consultation

Owner: alatia holding

Job Title: Project manager

Start Month / year :1/2018 to 3/2019

Responsibility:

Review all the projects' specifications Bill of Qty. related to the scope of work.

Inspect the executed work against the project specifications and Quality Control Standard and procedures.

Follow up preparing shop drawings, coordination drawings and submittals.

Monitor safety performance of all personnel on site and recommend improvements to safety procedures.

Follow up execute of time schedule and determine responsibility of the subcontractors for any failure to implement the contract items at the deadlines even be held accountable, and also speed to take preventive measures to prevent the occurrence of serious errors. Page 6

Finishing administrative building (plaster, painting, reflected celing, ceramic, stones, dry mix façade)

Plumbing (kastle, smart and masr elhegaz)

Feeding water (B.R black and green)

Manholes,rain drain and IC

Firefighting (fire tank)

Light current, UPS, dash board’s insulation and Earthling system.

Transformer, L.V and MDB rooms.

Boiler

Generator installation.

S.O.G around the factory and administrative building.

HVAC (split and consile) .

Employer: Orascom construction

Project name: Aburawash Waste water treatment plant

Consultant: AAW

General Contractor: Orasqualia construction

Owner: CAPW

Job Title: Senior site engineer

Start Month / year :4/2019 still working

Responsibility:

Mobilization

Excavation work and leveling and PLT test and sand cone test under PC.

Biological reactors 3 and 4 rafts and walls.

Submit progress reports to the construction Manager.

The secondary clarifiers no, 2 (10 rounded tanks 1300m3 raft and slipforms for walls)

Install and pouring encasement of 1200mm (sludge inner pipe) and 900mm(outtake pipe) and 300mm(out take pipe)

Install of power duct

Page 7

Install of slives and cantilevers (using capllers)

Install of steel structure above the tanks

125 secondary recirculation and excess sludge pumping station,124 secondary sludge outlet measurement,123 secondary clarifiers outlet water channels,122 secondary clarifiers,121 secondary clarifier distribution chamber.

119 turbo compressors and biological treatment electrical building.

Earthing

Skills

Computer skills:

Primavera P6

Quantity takeoff

AutoCAD

Expert in Microsoft office

Personal Attributes:

Negotiator

Personal skills:

English (Excellent)

Arabic (Excellent)

French (Fair)

Personal data:

Military status Exempted

Date of birth: 17/5/1987

Nationality: Egyptian Citizen

Marital status: Married

Excellent communication and presentation skills

Team player and flexible

Hard worker and Fast Learner

Page 8

REFERENCES FURNISHED UPON REQUEST



Contact this candidate