Post Job Free
Sign in

Estate Manager

Location:
Lagos, Nigeria
Salary:
120k
Posted:
October 29, 2020

Contact this candidate

Resume:

RESUME

IYERE, EMEKA JULIUS

Plot *** Power line

Eleganza Bus Stop

Lafiaji.

Lekki Phase 2,

Lagos.

Email:adhefq@r.postjobfree.com or adhefq@r.postjobfree.com.

Phone No: +234**********,234**********.

PERSONNEL DATA

Sex : Male

Nationality : Nigerian

Marital Status : Married

LGA / State : Ika South Local Government Area / Agbor, Delta State

CAREER PROFILE

As a local content engineer under Nigerian EGP 3 project, I was trained on detailed Engineering Design by Hyundai Heavy Industries Limited in Korea, on all aspect of gas plant project events from Pre-com to Commissioning aspects as well as documentation control procedures, and engagement of both Vendors and Subcontractors, I am a confident and effective Technologist whom takes responsibility and accountability at every juncture within a project I was engaged with. I had a demonstrable, successful and established /verifiable project record. I understand client requirements, effectively liaises with internal and client group stakeholders and delivers creative/effective solutions within specified deadlines and budget.

CAREER OBJECTIVES

Goal driven career pursuit and determination to accept challenging tasks with a corporate ideology in a changing work environment.

EDUCATION:

Ika Grammar School Agbor Delta State, 1994.

Senior Secondary School Certificate (SSSCE)

B.Eng in Electrical and Electronics Engineering

University of Nigeria, Nssukka.

Enugu State. 2001.

SKILLS:

Microsoft word, Excel Spread Sheet, Power Point Usage, and Auto Cad, Data Base Input,

Check sheet, Path maker User. Management Information System: Conceptual Foundations,

Structure and Development.

Survey of Software Environments for Exploiting

PC Assembling, Maintenance, Upgrading

Possess sound knowledge of various emergency response

Quite familiar with widely used and acceptable safety

Possess quality analytical skill.

Possess the ability to work efficiently with computer

Knowledgeable in rendering of first aid cares.

Good driving ability.

Possess a current travelling passport.

Ability to work under pressure with limited supervision

Knowledgeable in Path Maker Data Input.

TRAINING & AWARDS

1.Chevron’s Designated Driver Test Award … 2006.

2.Chevron’s Operation Excellence

3.Chevron’s Work Responsible Person

4.Chevron’s site Riggers Certificate

5.Excellent Worker Award by CNL/HHI.

6.Rigging Test Award.

7.MSA Orion Gas Detector Usage and Maintenance Training Feb. 2007.

8.Incident & Injury Free (IIF) Training. Feb. 2007.

By JMJ Associates

9.Permit To Work ( PTW ) Training

Mar 4. 2007.

Hyundai, Chevron-EGP3.Escravos

10.First Aid Training Dec. 2007.

NISP, Hyundai Chevron-EGP3.Escravos

11.Fire Watch Training. Oct. 2007.

Organized by Chevron Nig. Ltd. Escravos

12.Safety Training Observation Programmer (STOP Trainin Sept. 2007.

By Chevron Nig. Ltd. Escravos Gas Project.3 (EGP3)

13.Hearts and Mind Training Aug. 2007.

ISO 14001 Awareness Learning and Development Course …… Oct. 2007.

By PTW Dept. Chevron Escravos Terminal.

14.Audits Incident Reporting & Investigation Techniques and

Occupational Health Training. Sept. 2007.

15.Environmental Awareness and Development Training. July. 2005.

Korea

EXPERIENCE:

1. COMPANY: Samsung Heavy Industries Nigerian Limited

Production Management Team

(EGINA TOTAL PROJECT)

LADOL Free Zone

Tagwa Bay. Lagos.

POSITION: Facility Foreman

DURATION: 10 Feb 2016 Till 2018.

RESPONSIBITIES

Includes but not limited to

Previewing and interpretation of Electrical Installation drawings Overseeing all Electrical Works

Assisting the work Force to achieve their target

Monitoring and approving of detailed diagrams

Reporting to client on project updates

Scheduling of meeting and Presentations

Manpower organizing and Motivating

Daily overtime arrangement etc.

Outlining all installations based on clients needs.

2. COMPANY: Sudelettra Nigeria Ltd

Exxon Mobil’s Gas Flare Elimination Project

POSITION: Document Controller/ Storekeeper

DURATION: 18 Feb, 2012.

RESPONSIBITIES

The purpose of the Document Control Service (DCS) function is basically to establish and maintain a consistent system for numbering, formatting, distributing and filing non- technical, technical, and commercial documents received and generated during the life of a Project.

Set up the Document Control System of SNL Nig Limited, for Exxon Mobil QGFE Project including the Electronic Management System (EDMS) Numbering System, the Document

Management System, Overall filing System for both the hard copy paper filing system.

The distribution process of all documents and drawings, Record Management Process.

Responsible for the creation, implementation, and maintenance of Document Control & Information Management plans and procedures.

Maintains Document Control management System, captures, stores and retrieves document images.

Coordinates and performs document change control process including receipt, maintenance, approval, distribution and storage of controlled documents such as Project Plans and Procedures, TQs, Deviation requests, Drawings, forms, reports, etc.

Distribution of controlled documents and Project drawings using the DDM, making sure it user as well as monitoring the distribution to make sure that superseded documents are not used to execute the Project.

Filing of documents (electronic and Hard copies) with quick retrieval capabilities.

Quality checking of all incoming and outgoing documents, drawings and transmittals.

EDMS including Document Capture, Registration, Printing, Distribution, Transmittal, Internal and External review. Exception Reporting, and Final Handover to Operations.

Change process to update information, correct inaccuracies, and remove superseded documents.

Responsible for weekly and monthly updating and issuance of the Master Documents Register (MDR).

Maintains paper and electronic binders and logs of controlled documents, templates and related records.

Maintaining and controlling smooth Document flow between SNL and MPN, as well as between SNL and its subcontractors.

Put in place Information Management Process for all personnel in the Project.

Liaising with the necessary Team members for timely preparations of documents for review and final submission.

Issuance of transmittals of all project documentations and correspondences and effectively following them up as a proof of sending out project items, documents, drawings, etc.

Coordinating with all departments of the Project in order to assure that all superseded documents are kept in the right archive folder

3. COMPANY: Hyundai Heavy Industries Nig. limited.

Chevron Escravos EGP 3 Project Site

Warri

POSITION: E&I Lead Engineer

DURATION: Feb. 2007 till June 2010.

RESPONSIBITIES

Participated in all E&I Project Installations

Preparation of Method Statement for inspection and testing plan for Electrical and

Instrumentation works of the project.

Preparation of work procedure for electrical/instrumentation work.

Preparation of inspection and test plan for Electrical and Instrumentation works.

Supervision of calibration and testing of instruments.

Ensuring that facilities are adequately installed to safeguard technical integrity.

Developing and maintaining inspection programmed for Electrical and Instrumentation works.

Supervision of Electrical and Instrument installation to ensure adherence to project quality and compliance with statutory requirements, approved procedures DEPs.

4. COMPANY : Special Gas Construction Training in Korea,

Hyundai Engineering Company LTD.

Hyundai 41 Tower 917-9

Mok-dong, Yangcheon-gu,

Seoul, Korea.

POSITION: Document Control (DCC.EGP3)

DURATION: Nov. 2005 till Jan 2007.

RESPONSIBILITIES

Preparation of work procedure for electrical/instrumentation Installation works.

Preparation of inspection and test plan for electrical and instrumentation works.

Supervision of calibration and testing of instruments.

Ensuring that fire fighting/ prevention system is in place and functional.

Conducting of Electrical and instrument meetings, Drills, general briefings and making reviews.

Planning and promoting Electrical and Instrument training for personnel on project work site.

Ensuring proper environmental monitoring and effective waste management right from cradle to grave (From source to disposal).

Taking lead role in incident investigation, should any occur, and reporting/ dissemination of learning points and recommendation towards preventing future re occurrence.

Ensuring Proper documentation and validation of all Electrical and Instrument statutory documents as well as HES documentation control.

5. EMPLOYER : Silver Shadows Nigerian Limited

POSITION : Logistics / Materials Supervisor.

DURATION : August. 2003 to Dec 2004

RESPONSIBILITIES:

Receive, identify and inspect materials from suppliers.

Ensure all materials received are standard to specification and functional.

Dispatching of materials to appropriate site.

Supervise other material store locations, and ensure the adequacy of materials for continuous operation.

Coordinate and expedite in-house and inter project material transaction.

Conduct weekly and monthly materials check. (Inventory)

Arrange material transportation when necessary and approval of way bills.

Ensure security and safety of all stored materials

Coordinates with other departments for proper update on material needs.

6. National Youth Service Corp (N.Y.S.C.)

Workshop Coordinator

Electrical Department

Federal Ministry of Works & Housing

Jos, Plateau State. Dec.2002.

Hobbies:

Reading, Travelling, and Exploring Towards Improving Self.

Referees:

Based On Request.



Contact this candidate