APPLICATION FOR THE POST OF PRODUCTION ENGINEER
S. SAKTHIKUMAR
s/o K.Santhanam
Mannargudi-614001
Thiruvarur district
JOB OBJECTIVE
Pre –planning all the resources & responsible to achieve high production target as per required productivity in man hours.
PROFESSIONAL QUALIFICATION
S.No
Course
Name of
Institution
Name of
Board
Year of Passing
Aggregate
1.
DME
CENTRAL POLY.TECHNIC,
CHENNAI.
DOTE
APR2008
89%
EDUCATIONAL QUALIFICATION
S.No
Course
Name of
Institution
Name of
Board
Year of Passing
Aggregate
1.
HSC
NATIONAL HIGHER SEC. SCHOOL, MANNARGUDI.
State board
March 2006
85%
2.
SSLC
NATIONAL HIGHER SEC. SCHOOL, MANNARGUDI.
State board
April 2004
92%
ADDITIONAL KNOWLEDGES
NDT-ASNT (LEVEL-II in UT, RT, PT & MPT)
MS-OFFICE
AUTOCAD
WORK EXPERIENCE
Working from 2019- FEB to 2020 –FEB in KPK ENGINEERING PTE LTD. SINGAPORE.
Worked from (2015-2018 September) 3 years in NATIONAL TANKS MANUFACTURING LLC. (VJK Eng.Fze) – United Arab Emirates.
Worked from (2012-2014) 2 years in Shin Eversendai Engineering sdn.bhd –Selangor -Malaysia.
Worked from (2008-2012) 4 years in Larsen &Toubro Engineering workshop – Kanchipuram–India
PROJECTS INVOLVED
OVEN AND DUCTING (M.S/G. I/S. S)-FORD PAINTSHOP, CHENNAI.
TANKS & ; MANGALORE REFINERY/ PETROCHEMICALS
STRUCTURAL; ; CHENNAI PETROCHEMICAL COP.LTD
; INDIAN OIL CORPORATION LTD.
; GMR POWER CORPORATION LTD.
CHUTES/HOPPERS/TANKS -ROURKELA STEEL PLANT-INDIA.
PELLETIZING DISC- TATASTEEL PLANT-JAMSHEDPUR, INDIA.
POT SHELL- FOR ALUMINIUM SMELTERING UNIT -ADITIYA BIRLA GROUP –MATHIYAPRADESH-INDIA
STACKER CUM RECLAIMER MACHINE PARTS (bogie, slew deck, mast, boom and tail boom assembly) –JODA, NAUMUNDI 1100MW THERMAL POWER PLANT (COAL FIRED)
BUCKSTAY COLUMNS- BHUSHAN STEEL PLANT.
PRIMARY GAS COOLER- BHUSHAN STEEL PLANT.
Shutters for MUMBAI MANO RAIL. -INDIA
CABLE AND PIPE RACK -VALE MALAYSIA MINERALS PROJECT.
TURBINE HALL STRUCTURALS-MANJUNG THERMAL POWER PLANT (1X1000MV COAL FIRED) MALAYSIA.
TURBINE HALL STRUCTURALS- TANJUNG BIN THERMAL POWER PLANT (1X1000MV COAL FIRED) JOHUR, MALAYSIA
STRUCTURAL FOR POLY CRISTALLINE SILLICON PLANT-TOKUYAMA MALAYSIA SDN BHD- SARAWAK.
Steel structural for LCCT, KLIA-2 AIRPORT PROJECT-MALAYSIA.
Steel structural for LNG TRAIN 9 PROJECT FOR JAPAN GAS CORPORATION IN SARAWAK MALAYSIA.
PRESSURE TEST CABIN, GROUPMENT BERKINE WATER FILTERATION SKIDS, STORAGE RACK PANELS, SEWERAGE WATER TANKS, IMPEELER MOTOR SKIDS FOR NATIONAL OILWELL VARCO– UAE
STEEL STRUCTURALS FOR CROWN PRINCE COURT PROJECTS – ABUDHABI-UAE
COMPLETE WAREHOUSE STRUCTURALS FOR ROOFING MIDDLE EAST-UAE.
COMPLETE WARE HOUSE STRUCTURALS FOR OIL FIELDS SUPPLY CENTER LTD-AL QUOZ, DUBAI
CHOKE AND KILL MANIFOLDS FOR NATIONAL OIL WELL VARCO-
JABEL ALI- UAE
STRUCTURAL STEEL FOR 6 STOREY SINGLE-USER HI TECH DATA PROCESSEING AND COMPUTING AT LOK YANG WAY SINGAPORE.
PIPE SUPPORTS FOR PHASE II EXPANSION, CHANGI WATER RECLAMATION PLANT, SINGAPORE.
STRUCTURAL STEEL FOR NEW STATE COURTS AT HAVELOCK SQUARE SINGAPORE.
PLATFORM STRUCTURAL FOR DB SHENKAR- DEMATIC- SINGAPORE AND 4 STOREY SINGLE USER RAMP UP FACTORY AND WARE HOUSE AT TUAS PLANNING AREA.
STEEL STRUCTURAL; FOR 5 STOREY MULTIPLE –USER DATA, 04958K PT MK AT LOYANG DRIVE (PASIR RIS PLANNING AREA).
STRUCTURAL FOR NOISE BARRIER IMPLEMENTATION AT RAILVIA DUCT PHASE II – (AMK –YCK SEGMENT 2)
CURTAIN WALL STRUCTURE FOR BUSINESS PARK DEVELOPMENT AT BIOPOLIS ROAD, QUEENS TOWN PLANNING AREA.
RESPONSIBILITIES
Preparing daily / weekly schedule and monitoring daily production report to meet the overall project completion.
Ensuring that all the production material availability and communicate to procurement previously according to project requirement.
Preparing cutting plan and get approval from client prior to start the fabrication work to reduce the wastage of materials and man hours.
Preparing detailed AutoCAD drawings with additional section views to simplify the work flow.
Verification of the fit –up, orientation, clearance and layout on process of fabrication.
Monitoring the welding process and consumables as per project requirement and discussing with foreman to follow the welding sequence to avoid the welding shrinkages.
Liaise with foremen for Job allocation & workman control as per the priorities towards the delivery & inspection schedule.
Organizing third party, customer inspection and coordinating with NDT testing.
Feeding materials to blasting as per the delivery schedule priority and ensuring the steel temperature and humidity conditions prior to blasting.
Monitoring the painting process to achieve the required microns.
Co- ordinate with loading department for proper packing method and arrange lifting cranes / tools and also ensuring the safety of workers and products at dispatch area.
Ensuring the preventing maintenance of machineries and proper replacement.
Attending daily Toolbox meeting to induct the importance of safe working method, Quality of jobs, maintain housekeeping and control of worker’s absence.
Handling knowledge of tools / equipment like Vernier caliper, leveling instrument, weld gauges, hygrometer, press- o- film for blasting profile, DFT gauge.
PERSONAL PROFILE
Name SAKTHIKUMAR.S
Father’s Name: SANTHANAM.K
Date of Birth: 25.2.1989
Sex: MALE
Nationality: INDIAN
Religion: HINDU
Languages Known: TAMIL, HINDI, and ENGLISH
Marital Status: SINGLE
I hear by solemnly affirm that the above furnished details are true to the best of my knowledge.
Yours truly
SAKTHIKUMAR.S