NAME : KARTICK MAYRA
PROFESSION : LAND SURVEYOR
DATE OF BIRTH : 11-09-1969
PRESENT ADDRESS : West Bengal
Baishnabghatapatuli Township M-block -385
Kolkata-700094
Phone : 990-***-****, whatsApp+213********* E-mail : adh979@r.postjobfree.com
PERMANENT ADDRESS . VILL- Mukherjeerchack
P.O Baribhangabad
Dist- 24th Paraganas south
Pin. 743349
West Bengal
TOTAL YEARS OF EXPERENCE : 26Years.
NATIONALITY : Indian
EXPECTED SALARY :
PASSPORT NO : N1098111 Expiry Date : 06-07-2025
RELIGION : HINDU
MARITAL STATUS : Married
KEY QUALIFICATIONS:
Has more than 26 years of professional experience in this field of Surveying. Responsibilities include execution of all mechanical civil survey activities & joint inspection and approval from Client as well Consultant. Fixing and layout of co-ordinate points for center line marking, setting out work for all type of structures alignment,compressor alignment, Major and Minor Bridge,Flyover layout, fixing and periodical checking of bench marks, establishment of road profile Pipe alignment ( OIL & GASS,GRE, UPVC), formation level checking, Sewerage Line, Storm Water Network etc., District Cooling Pipe line, Road Works as per ISO 9001.
Z
EDUCATION:
B.A. Pass, Calcutta University
Survey from I.T.I. Tallygunge (Kolkata)
COUNTRIES OF WORK: INDIA, UAE, ALGERIA
EXPERIENCE
EMPLOYMENT RECORD
COMPANY NAME : DODSAL ENGINEERING & CONSTRUCTION FZE.
DURATION : 27/06/16 TO 18-07-19
LAND SURVEYOR
VERIOUS TYPE OF CIVIL FOUNDATION,MECHANICL STRUCTURE, COMPRESSOR SEWARAGE NETWORK,FIRE WATER NETWORK, INSTRUMENTATION & ELECTRICAL NETWORK,ROAD, PIPE LINE OIL & GASS (IN &OUT SIDE) PLANT, STRUCTURAL ALIGNMENT, BUILDING WORK ELECTRICAL. SUB-STATION.
PROJECT NAME : EXECUTION OF GASCOMPRESSER& REINJECTION STATION
ZCINA HMD NORTH ALGERIA
NAME: K.N.D ENGG. TECH. LTD.
POSITION: Sr. officer Surveyor
DURATION: OCT.2014 to 26/03/16
PROJECT NAME:
As Sr.Surveyor, responsible for Piling Civil work at Kolkata TATA medical center phase two, Bokaro Bhell site piling and civil work.
COMPANY NAME : DODSAL ENGINEERING & CONSTRUCTION PVT. LTD.
DURATION : 28-10-2010 TO 10-08-2014
PPOSITION: LAND SURVEYOR
PROJECT NAME : Shah Gas Development Project, Abu Dhabi
RESPONSIBILITIES : All type of civil, mechanical work foundation layout,Fire water line,cable trench,Pump foundation. Structure alignment.
COMPANY NAME: DODSAL ENGINEERING AND CONSTRUCTION PVT. LTD
POSITION: SURVEYOR
DATE: 10/05/2007 to 25/02/2010
PROJECT NAME: Jumeirah Village South III (Infrastructure Project)
(Project Cost AED 935 Million)
Client: Nakheel
Responsibilities Include
Fixing and layout of coordinate points of building
Pipe alignments (GRE, UPVC)
Formation & level checking
Sewerage Network.
Portable water Network
District Cooling Network.
Road Works (100km including kerb and tiles work)
Storm Water drainage system.
COMPANY NAME: PUNJLLOYD LIMITED
POSITION: Senior Surveyor
DURATION: 1/08/2005 to1/05/ 2007
PROJECT NAME: East West Corridor Project for NH-31 (2 Lane to 4-Lane from Km 983.00 to Km 961.50 of Nalbari to Bijni Section NH-31 under NHDP (Contract Package EW-II (AS-9)
Client: National Highways Authority of India
As Senior Surveyor, Overall in-charge for day to day survey activities like fixing and layout of co-ordinate points Major & Minor bridge, center line marking, setting out work for all type of structures, fixing and periodic checking of bench marks, establishment of road profile etc.
COMPANY NAME: DODSAL ENGINEERING AND CONSTRUCTION PVT. LTD
POSITION: Surveyor
DURATION: 1/09/ 2003 to 20/07/2005
PROJECT NAME: Surat-Manor Tollway Project (NH-8), Gujarat(ADB funded)
Client: National Highways Authority of India
As Surveyor,responsible for i) Fixing & Layout of co-ordinate points for piling, pile cap. pier shaft, pier cap, bearing pedestal by Total station instrument of Bridges & Flyovers.
ii) Centerline layout, Deck level positioning of superstructure Deck of Bridges & flyovers.
iii) Setting out of curve for roads, fixing of layer for different layers of road construction.
All type of road works event for high way.
COMPANY NAME: K.N.D ENGG. TECH LTD.
POSITION: Surveyor
DURATION: Feb1996 to August 2003
PROJECT NAME:
As Surveyor, responsible for
i) Piling Civil work at Kolkata, client (Shrachi)
ii) Piling & Civil work at Guwahati IIT Client L&T
iii) Piling & Civil & Structural work at Guwahati Refinery.
iv) Pipe line survey at Jamnagar to Loni Pipe Line. Client - L&T.
v) Piling, Civil & structural work at Haldia Dock project. Client L&T.
COMPANY NAME: C & C CONSULTING FIRM.
POSITION: Surveyor
DURATION: 1994 to 1996
PROJECT NAME:
Responsible for
i) Different Civil work in Rourkela Steel Plant.
ii) Gujarat Chemical Plant at Bharuch, Piling & Civil work .
iii) Topography Survey, Orissa Alumina Plant at Raygoda. Client —L&T.
COMPANY NAME: SUPERINTENDENCE CO OF INDIA PVT. LTD.
POSITION: Surveyor
DURTION: Jan 1992 to 1994
PROJECT NAME:
RESPONSEBILITY
i) Topography Survey, ACC Cement Factory at Kymor (M.P)
ii) Tunnel Survey, Rangith Hydro Electric Project at Sikkim (Client NH PC)
iii) Pipe line survey at Silchar — Assam Client — Gas Authority
INSTRUMENTS USED:
GPS, Make: Trimble, Model No. 5700.
Total Station. Make: Nikon, Model No. DTM 552. And Sokkia
Total Station, Make: Pentex, Model No. R 315.
Geodometer, Make: Trimble, Model No. SET5600.
Total Station, Make: Pentex, Model No. ATS 101.
Theodolite Micro Optic-1sec. Least Count, Make: Wild T2.
Theodolite Verneer Optic-20sec. Least Count, Make: National Instrument and
Lawrence & Mayo. LEICA TS-06
LEVEL INSTRUMENTS.
Auto level, Make: Trimble, Nikon & Topcon
Micro level with Micrometer, Make: Wild T2.
Auto level, Make: Sokkia C32, C41.
Dumpy level
Tilting level.
Leica autolevel
LANGUAGES: Language Speaking Reading Writing
English Good Good Good
Hindi Good Fair -
Bengali Excellent ExcellentGood
I hereby certify that the above information is true and accurate according to the best of my knowledge.
NAME: KARTICK MAYRA
PLACE: KOLKATA
Date: