Post Job Free

Resume

Sign in

Power Plant Project

Location:
Vasant Nagar, Karnataka, India
Posted:
November 30, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

D. SHANMUGASUNDARAM

Mobile: +91-875*******, IND

: +91-894*******.IND

Email: adh8xb@r.postjobfree.com

TAMILNADU, INDIA

JOB APPLIED FOR “QA/QCWELDING INSPECTOR”

Objective

To be part of an organization that practices professionalism encourages

professional growth, and personal development, that I may enhance in knowledge and ability, thus actively contributing towards the success of the organization in achieving its mission and vision, willing to work in challenging atmosphere. Looking for challenging, opportunity in Production, Inspection, and Quality Assurance & Quality control.

Personal Details

Name : D. SHANMUGASUNDARAM

Father Name : M. DURAIPANDIAN

Nationality : Indian

Date of Birth : 21-03-1968

Gender : Male

Marital Status : Married

Language Known : English, Hindi, Tamil & Malayalam

Permanent Address : Plot No; 29, Senthurnagar 2nd St, kalugumalai,

Kovilpatti Road, Tamilnadu, India. Pin: 628552

Educational Qualification

Diploma In Engineering

CERTIFICATIONS/TRAINING

AWS SCWI, # 19030078 –Exp: March 2022

ASNT Level II – MT, PT, UT, RT- Exp: AUG 2021

AUTOCAD 1993

MS WORD, MS ACCESS MS EXCEL AND MS POWER POINT

Abilities

Self-motivated & capable to mix easily with different situation

Hard Worker and Honest

Disciplined and Team Worker

Perform Assigned task with grant responsibility

Passport Details

Passport No : M0361105

Date of Issue : 12-08-2014

Date of Expiry : 11-08-2024

Place of Issue : Dubai

Responsibilities

More than 19 years’ experience of oil & Gas field. Inspection. Quality Control, third party Inspection and Non-Destructive testing of Pressure Vessels, Heat Exchangers, pipes Etc.

All inspection does there as per safety (OSHA) rules and Regulation.

Cross country pipeline, onshore piping, Turbine, pump & Compressor-Rotors, Piping & Structural for Petrochemical plants, Power Plants and Storage Tanks

Inspection test plan preparation as per the approved project specifications

Preparation and submission of project documents to clients like Raw materials, Welding consumables, Paint materials, WPS / PQR, Project Quality Plan, Method Statement for Fabrication, welding and painting and Third-party Prequalification documents, Etc.…

In coming raw material inspection as per the approved project ITP.

Coordinating with third party testing laboratory for raw materials & welding Consumables testing like tensile test, Impact test, Bend test, Hardness test Chemical analysis test as per approved project specification.

Witnessing the PMI Test and ensure the chemical properties.

Witnessing the welding Procedure. Qualification and welder Qualification tests.

Monitoring and updating of welder revalidation. Prepare monthly Inspection Analysis report based on Daily Inspections.

Coordinating with third party calibration agency for calibration of Measuring and Monitoring Instruments.

Witness of stage wise inspections - Fit up Inspection, welding visual inspection, NDE (UT, RT, MPT, and DPT), Bolt Tightening Inspection, Blasting and Painting Inspection and Shop release certification as per the approved ITP.

Witnessing hydrostatic and pneumatic tests and performing final inspection for acceptance. Skill in painting and coating inspection

Monitor & Analysis of welder Performance.

Prepare monthly Inspection analysis report based on Daily Inspections.

Coordinating with third party calibration agency for calibration of Measuring and Monitoring Instruments

Radiographic film interpretation and evaluation in compliance with relevant codes.

Monitor any post weld Heat Treatment on site and review the completed test reporting.

Prepare monthly Inspection analysis report based on Daily Inspections.

Coordinating with third party calibration agency for calibration of Measuring and Monitoring Instruments.

Coordinating with Maintenance for internal calibration of Welding machines and Quivers as per the approved procedure & internationals Standards.

Conducting periodic training program to welders with respect to the welding Process and weld defects.

Up-dating of External origin documents as per the project requirements.

Coordinating with Client / TPIA for Stage inspection and final inspection as per the approved ITP.

Conducting periodic Quality audit for Sub-contracting companies to ensure the Quality management system procedure, QA & QC documentation...

Coordinate with Planning Department & Design Department for drawing Clarification and modification of drawing

Prepared to & approve of QA & QC dossiers as per the approved ITP, submitting to client.

Familiar to International ship repairing code ICAS 47

EQUIPMENT/COMMODITIES/SPECIALTIES

Pressure Vessels & Boilers, Heat Exchangers, Storage Tanks, Heavy & Miscellaneous Structures, Structural and Piping works involved in Skids, Process & Pressure Piping of CS & Alloy Materials, GRP Pipes & Fittings, Valves Inspection and Testing Witness, Cross Country Pipe Line Inspection, Welder & Procedure Qualifications. familiar with code and standard.

Work Experience Summary

Presently working as a “PWHT supervisor& welder trainer” in GULF PIPING COMPANY LLC – ABU DHABI, UAE. Since September 2015 to August 25 2020

SL No

PROJECT

CLIENT

INSPECTION AUTHORITY

PERIOD

1

Brown field Train (5)

CHIYODA/ CCC

ADNOC

Aug-2019 - Aug25 2020

2

JACKETS

ARAM CO

NPCC

Mar-2019 to Aug20 19

3

HEAT EXCHANGER

GULF FLOOR

GULF FLOOR

Aug- 2018 to Dec-2018

4

LTA (19 SSS JACKETS)

ARAM CO

SAIPEM

April -2018 to July -2018

5

RUWAISREFINESRY(RRW)

GS E&C

GS E&C

Jan -2018 to Mar-20 18

6

PETROFAC PROJECT

PETROFAC

ZADCO

Aug-20 17 to Dec-2017

7

TURRET

TOTAL

SAIPEM

Sep-2015 to Jul-20 17

Employer: Dragon Offshore LLC. Worked as a QA/QC Welding inspector.

SL No

PROJECT

CLIENT

INSPECTION AUTHORITY

PERIOD

1

Ye-mellah, (Rig repairing)

DRY DOCKS

DNV-GL

Jan 15 to July 15

2

High island 4, Aban 1V, (Rig repairing)

DRY DOCKS

ABS

Dec14 to Jan15

3

United 1 Conversion,

IOCC

BV

Sep 14 to Dec14

4

Strategic Excellence (Ex-GSF-134) Conversion,

Amar offshore

BV

Jul14 to Aug14

5

ABOOZAR JACKET A20& A21

IOCC

SGS

Apr 14 to Jun 14

6

Solan tank

DRY DOCKS

DNV

May13 to Jan14

Employer: ABC Technical consultancy Worked as a QA/QC Welding inspector. (Deputed to Star line metallic construction industry. LLC)

SL No

PROJECT

CLIENT

INSPECTION AUTHORITY

PERIOD

1

Yanbu 2

HANWHA

ENTOPIE

Sep12 to Jan13

Employer: ABC Technical consultancy Worked as a QA/QC Welding inspector. QA/QC Third party Inspector (Deputed to BUREAU VERITAS)

SL No

PROJECT

CLIENT

INSPECTION AUTHORITY

PERIOD

1

NEW AGRP REVAMP PROJECT

KNPC

TECNIMONT

Apr12 to Aug12

Employer: ABC Technical consultancy Worked as a QA/QC Welding inspector. QA/QC Third party Inspector (Deputed to G. Lloyds’)

SL No

PROJECT

CLIENT

INSPECTION AUTHORITY

PERIOD

1

PHASE 20 &21Pipe coating Inspection

OIEC

GERAB

Jan12- to- Mar12

2

Foroozan offshore complex Renovation and reconstruction project (Iran)

OIEC

NARDEES

Dec 11 toJan12

3

South pars gas field development (Iran)

IOEC

HANMAEK UAE FZ LLC

Sep 11 to Nov 11

Employer: ABC Technical consultancy Worked as a QA/QC Welding inspector.

SL No

PROJECT

CLIENT

INSPECTION AUTHORITY

PERIOD

1

Shah product pipelines pipe inspection

B. V

SAIPEM

Aug- 2011 to Sep-2011

2

Third party Inspection in Everest Metal industries

BCTS

BCTS

Jun-2011 to Jul-2011

3

Welder qualification in Qatar Islamic bank project

Fino Inter national

BCTS

Apr-2011 to Jun-2011

4

Shah product pipelines pipe inspection

B. V

SAIPEM

Oct-2010 to Mar-2011

5

PQR, WQT Inspection

Man diesel

BCTS

Sep-10

6

Third Party Inspection PQR, WPS, WQT FOR Dewa Project

Zener

DEWA

Jun-2010 to Aug-2010

7

Inspection (Third party Inspection)

AFFAN building

System

BCTS

Mar-2010 to May-2010

8

Fujairah water supply and electrical power plant shut down work.,

SembCorp- Fujairah

SEMCORB

Nov-2009 to Feb-2010

Employer: M/S. PIH Service me ltd. (CRC EVANS Group) Worked as a NDT inspector.

SL No

PROJECT

CLIENT

INSPECTION AUTHORITY

PERIOD

1

On Shore Gas Development

Phase-iii Project. 19 No cone Roof tanks & Erection testing of Process& Utility piping Inspection

Punji Lloyd Pvt Ltd.

Gasco, Bechtel

Dec-2006 to Jan-2009

2

ULG& LSGO project

Lahoud Engg,

Takreer/Technip Italy

May-2005 to Jul-2005

3

ULG& LSGO project

Alec/Al- Jabber

Takreer/Technip Italy

Jan-2004 to Apr-2005

4

Al-Shuwaih Water supply & Electricity Project. Shuwaihat

Dodsal

Semmens

Oct-2003 to Dec-2003

5

GOMMOS (Gulf Marin Maintance of shore Services) processing piping and utility piping, various types of vessels

G.P.S, D.P.C,

Aram co,

Gommos, G.p.s. Aramco.

D.P.C

Aug-2002 to Sep-2003

6

Dubai Electricity & Water Authority (DEWA) Vessels & Water box

Belleli Energy,

Dewa,

Feb-2002 to Aug-2002

7

Petro Chemical Project Ruwais.

Alec/Al- Jabber

Borough

Sep-2001 to Jan-2002

8

On Shore Gas Development Project (OGDII) HabShan

CCC

ADNOC

Apr-2000 to Aug-2001

SUMMARY OF WORK (INDIA)

SL No

PROJECT

CLIENT

INSPECTION AUTHORITY

PERIOD

C. Premier NDE Services Trichy, India

BHEL,

Lloyds

Jul-1998 to Jan-2000

Declaration

I hereby declare that the above furnished information is true and correct in best of my knowledge and belief.

INDIA, TAMILNADU D. SHANMUGASUNDARAM

01-12-2020



Contact this candidate