Post Job Free

Resume

Sign in

Inspector Refinery

Location:
Lal Bagh, Uttar Pradesh, India
Posted:
November 29, 2020

Contact this candidate

Resume:

CURRICULUMVITAE

SHAHABUDDINANSARI EmailID :adh71g@r.postjobfree.com

PipingSupervisor&QCInspector MobileNo:+918*********

+919*********

(7Year’s+Experience),Oil&GasFieldConstruction(Piping&Mechanical) CARREEROBJECTIVE:

Toworkinacompetitiveandchalengeatmosphereandtocontributethebestofmyability towardsgrowanddevelopmentofprogressivecompany.

EDUCATIONALQUALIFICATION:

QUALIFICATION COLLEGE/SCHOOL

DiplomaInMechnicalEngineering

NorthCalcuttaPolytechnicKolkataWest

Bengal

AdvanceDiplomaInComputerApplication(ADCA) B.Tech.InstituteOfComputerEducation OTHERCERTIFICATIONDETAILS:

QUALIFICATION INSTITUTE/SCHOOL

PositiveMaterialIndentificationEquepment

OperationalTrainingoftheNitonXLT-889s

ProvidedbyNitonUkLimitedfromDOHA-

QATAR

NDTLevel-IIin(RT,MPT,LPT,UT) J.P.TechnicalInstitute-INDIA/QATAR InstrumentOperatorTraining(SciAps.Z-200C+) ProvidedbyJeroenvanRunfromK.S.A EXPERIENCESUMMARY:

COMPANYNAME LOCATION DESIGNATION DURATION

NBTC/DSRTECHNICALGEN.TRAD.CO.-

KIPICZOREPC-055B

KUWAITALZOUR

REFINERY

PIPINGSUPERVISOR

10Oct2019TO20

Aug2020

ELECOTSHJKIPICZOREPC-0055A

KUWAITALZOUR

REFINERY

PIPINGSUPERVISOR&QC

INSPECTOR

10July2019To20

03Oct.2019

CCC–(CONSOLIDATED

CONTRACTORSCOMPANY)

SAUDIARABIAJSRU

PK2

PIPINGSUPERVISOR&QC

INSPECTOR

31Jan2017to8

Feb2019

CCC–(CONSOLIDATED

CONTRACTORSPNG-LNGCOMPANY

LIMITED))EPC3

PAPUANEWGUINIA

QCTECHNICIAN

–NDT&PMI

31Mar2012to

21May2013

CCC–(CONSOLIDATED

CONTRACTORSCOMPANY))

DOHA-QATAR

RASLAFFANPGTL

PIPINGSUPERVISOR&QC

INSPECTOR

01Nov2009to07

Sep.2010

CCIC–(CONSOLIDATED

CONTRACTORSINTERNATIONAL

COMPANY)).

DOHA-QATAR

RASLAFFANRGX-

6/7&AKG-2

PIPINGSUPERVISOR&QC

INSPECTOR

3Jan2008to12

Sep.2009

PROFESSIONALEXPERIENCEDETAILS:

DESIGNATION:SUPERVISOR/FOREMAN(SaudiARAMCOApproved),QATAR&PNG,KUWAIT). JOBRESPONSIBILITIES:

Controlandmonitortherelatedactivitiesasgivebelow

FormalinspectionactivitieswhicharerelatedtothePMI.(basedontheSaudiARAMCO’sstandards’ requirements)

IdentifythePMIrequiredjointsfromthedrawingsbasedontheinspectionplan

PreparethePMIrequestondailybasis

CoordinatethePMIteamtoproceedthePMIactivities

ConfirmthePMIworkprocedure’slatestrevisionsapprovalandavailability

VerifyandconfirmthePMItechnicians’certificationdetailsbeforestartthework

VerifythePMIequipment’scalibrationdetails

VerifythePMIresultsbasedontheinternationalcodesandstandardsrequirements

UpdatethePMIresultsintheproject’shistorysheet

Isometriccontrolsheet(ICS)review&relatedactivities

Testpackreview&relatedactivities

PMIrelateddocumentspreparation

Welding-consumables-control:storageandhandlingrelatedactivities

CoordinationwiththeWELDING-PIPINGteamtofulfilthePMIrequirements

ControltheNon-conformance/Violationsbyimplementinnovativeways

Siteinspectionandcoordinationwiththeclientsandthirdpartyinspectionagencies.

RaisingRFI’sInQMISForInspectionNotificationToSAPMTAndPID

MaintainingLogbookForDailyActivitiesAndUpdatingDailyRFIStatus.

QCP&TechnicianApprovalCheckBeforeStartingJobs.

PerformingjobBeforeCheckDateOfCalibratinValidDatePMIMachine.

ToEnsureDateOfCalibrationoftestBlockCertificates.

WitnessingEachJointsWhenPMItechnicianPerformingWork.

InspectionOfJoints&ItsDetailsBaseOnIsometricDrawings.

DailyReportingPerformingJointsReportToQCManager.

ImplementsHSERequirmentsAsPerCompanySpecifications.

AssistsInTheResolutionOfNcr’sByMonitorsTheCorrectImplementation.

PMIUnacceptableReportsPreventiveAndReportToTheQcManagerWhenCorrectiveActionsAreCompleted.

EnsureProducts/ComponentsHaveBeenManufacturedUsingTheCorrectAloy

FindPotentialyMixed-UpAloys

IdentifyIfTheWrongMaterialHasBeenUsed.

EnsureMaterialConformsToTheCorrectStandardAndSpecification.

EnsureWeldedComponentsHaveUsedTheCorrectFiler/EectrodeMaterial

ToPerformPositiveMaterialIdentificationByUsingEitherOfTheTwoTechniquesX-RayFluorescence(XRF) Analyse&OpticalEmissionSpectrometer(OES)

CheckingOfAlReceivedDocumentationIsLegibleAndContainsAppropriate Approval.

IssuingNCR’sWhenNon-ConformityActivitiesWereNotedBySubcontractors.

PrepareWeeklyQualityReportsAndSubmitsToTheSeniorManagement.

MaintainingDocumentsForAuditingPurpose.

ParticipatingAuditProgramsOfFolowUpTheCorrectiveActionRequired.

PreparationOfNDEReportAndInspection/CoordinateWithTheInspectors.

Coordination,Inspection&ReportingAsPerDailyRequest.

MaterialCoordinatorFromSiteStoreToWorkingArea.

ConsumableHandling&StorageForPMI.

InspectionOfIncomingMaterialAsPerStandardSpecification.

ToolBoxTalkForOurTeam.

Inspectingtheincomingmaterialsfordamages,dimensionsandcorrosionsandensurethatMTCisavailable andaccordingtotherequirements.

WorkingknowledgeofcodessuchasAPI,ASMEandASTM preferablyfamiliarwithCLIENTstandardsand specifications.

Familiarwithdrawingsandspecificationsapplicabletotheproject.

Inspectpipingjustbeforeerectiontoverifythatinteriorisclearofforeignmaterials.

Fitupinspectionaspergivendrawingandjointdesign.

Coordinatewithcontractorregardinginspectionmattersandfacilitatesmoothflowofinspectionactivitiesat site.’

Ensurethatpipesupports,hangersandguideshavebeeninstaledin accordancewiththepipingdrawings andthepipesupportdetails.

Checkthecorrectinstalationofspecialpipesupportandtheuseofcorrecttypeofstandardsupportin accordancewiththeinformationshownonthedrawing.

Confirmthepipingsystemconcurswithflowdiagramstoverifycompletenessofsystem.

Reviewofqualityplanandinspectiontestplan.

ReviewofP&ID’s,PipingPlansandIsometricDrawings.

PreparingTestPackageandgettingapprovalfromclient.

EvaluationoftestpackagecontentstoensurethatrequiredNDT,PWHT,Hardnesstest,PMI,Reinformedpad testandflushgrindingofOrificeflangehasbeenperformedpriortofinalsystempressuretesting.

Witnessedtestingofpressuresafetyvalves

Linecheckinginspectionttestpackagesandpunchlisting.

PunchlistingofpipingpackagesforCatO,‘A’,‘B’and‘C”andensurethatproperly identifiedvalvesare instaledinaccordancewiththeflowdiagram.

Witnessingofleaktestandpneumatictest.

Witnessfinalpressuretests,includingverificationthatpressuregaugeshaveadequatedialrangeandis calibrated.

Verifythatthetestingpressuredoesnotexceedthealowabletestpressureofanyequipmentinthesystem.

Verifythattherequiredtestpressurewasmaintainedforthespecifiedlengthoftimewithnoacceptable leakage.

Confirmrepairs,re-testingandre-inspectioninaccordancewithspecifications.Ensureblindsareremovedand correctgasketsareinstaled.

Verifythatcontrolvalvesandotheritemsthatwereremovedforthetestarereplaced.Checkthatwaterhas beenremovedfromcheckvalves.

Witnessingflushingofpipelines.

Re-instatementinspectionofpackages.

Listingandrectifyingcheckofre-instatementpunchlist.

Verificationofclosedpunchitemsandconductwalkthroughforeachcompletedpipingsystem priorto mechanicalacceptance.

Recordalmodificationonmastercopyofdrawingforthefutureuseintheas-builtdrawing.

Responsibleformodificationofpipingdrawingssuchasrevisions.

Preparationofdocumentsfornewlyfabricatedspoolsinfabricationanderections.

Keepupdatecopiesofaldrawingsrelatedtoworksupervisedandmaintain,inseparatefilesuperseded copies.

Supervisethepipingactivitiesincludingfabrication,constructionandcompletionofthedesignatedprojects.

Ensurethataldocumentsreceivedarehavingproperdocumenttitle,numberandrevisionandapproved format.

SupervisetheexecutionandimplementationofinspectionandqualityrequirementsasoutlinedbyCLIENT contracts,standards,procedures,specifications,generalinstructionsandasdirectedbysuperintendent.

Developstrategiestoovercomethepotentialinspectionchalengesduringtheexecutionofproject’sphases andtoprovideresolutiontothefieldtechnicalissues.

Generatereportscoveringalthequalityaspects.

Ensurecontractorsmaintainingqualityrecords,failureandrepairhistoriesasapplicable

Toreceive,distributeandissue/controlofinternalandprojectdocumentation.

Performingflexibleapproachtotheirworkandhoursinordertodeliveragainsttightdeadlines.

Checkingofalreceiveddocumentationislegibleandcontainsappropriateapprovals.

Ensurealprojectdocumentationisprocessed,transmittedandfiledinaccordancewiththerelevant documentmanagementsystem,andcanberetrievedinanaccurateandtimelymanner.

Produceanddistributestatusreportstotheprojectteam whenrequiredandassistwiththereproductionof documentationacrossdifferentmediums.

Supervisethepipingactivitiesincludingfabrication,constructionandcompletionofthedesignatedprojects.

Responsibleforthedaytodayrunningoftheworkonsite

IssuingNCR’swhennon-conformityactivitieswerenotedbythesubcontractors.

PrepareWeeklyqualityreportsandsubmitstotheseniormanagement.

PrepareConstructionAssessmentChecklistsforvariousengineeringdisciplinesandreviseittosuitthesite requirements.

Maintainingdocumentsforauditingpurpose.

ParticipatingAuditprogramsoffolowupthecorrectiveactionrequired.

Review andapprovalofWelderqualificationtestrecord(WQT)andalsoWitnessingWelderPerformance QualificationTest(PWQT)inaccordancewithASMESec.IX.

Inspectfitup preparation,jointconfiguration,cleanliness,pre-heattemp,and theweldingprocedure specificationused.Visualexaminationofrootpasses,penetration,undercut,cracks,slugsandporosity.

Verificationofweldingprocess,welderandconsumablesasperapprovedWPS.

Conductvisualinspectionofwelding,fit-upanddimensionalchecks,inspectionofmaterialsasperapplicable codeandstandardsanddrawing.

Perform stagewiseinspectionatfabricationshoplikein-processDimensional,Fit-up,Welding,material traceabilityrecords,SurfacePreparationasperapprovedInspection&TestProgram.

Carryoutmonitoringinspectiontodetermineweeklyweldingprogressandrejectpercentage.

WelderPerformanceQualificationinprocessSMAW,GTAW etc.WeldingStageInspection(Before/during& afterwelding)

Planning andMonitoring ofWelding Consumables,Preheating,Welding and WeldVisualInspection, PWHT/NDT/HardnessTest,PMITestaspertheWPS,ITP

VisualInspection,NDTofHighPressurePipe,PressureVessels.

PreparationofNDEreportandinspection/coordinatewiththeinspectors

InspectionandClearanceofFitup,WeldVisualofalaboveGround&undergroundPipingandInProcess Inspection,Structural,Valves,HeavyEquipmentJoints,NozzleModificationsInspection PROJECTSUNDERTAKEN:

AL-ZOURREFINERYPROJECTZOR/EPC-0055-BFORKIPICWITHFDHJV/NBTC/DSR

AL-ZOURREFINERYPROJECTZOR/EPC-0055-AFORKIPICWITHTSHJ/ELECOCHINA

JSRU–JIZANSULFERRECOVERYUNITPKG-2PROJECTFOR“SAUDIARAMCO”WITHSAIPEM/CCC

PNG-LNG-EPC3BUILDINGS,UTILITIES&OFFSIDEPROJECTFOREXXONMOBILEWITHJGC/CCC

PEARLGTLPROJECTNUMBER918FORQATARGASWITHJGC-KBR/CCC

RASGASONSHOREEXPENSION-6PROJECTFORQATARWITHCTJV/CCC

RASGASONSHOREEXPENSION-7PROJECTFORQATARWITHCTJV/CCC

RASGASONSHOREEXPENSION-AKG-2PROJECTFORQATARWITHCTJV/CCC PASSPORTDETAILS:

Name : SHAHABUDDINANSARI

PassportNo. : N2875084

PassportDateofexpiry : 03-09-2025

DECLARATION:

Iherebydeclarethataltheabovedetailsaretrueandcorrecttothebestofmyknowledge. Place:INDIA YoursSincerely,

(SHAHABUDDINANSARI

Date:08/09/2020



Contact this candidate