CURRICULUMVITAE
SHAHABUDDINANSARI EmailID :adh71g@r.postjobfree.com
PipingSupervisor&QCInspector MobileNo:+918*********
(7Year’s+Experience),Oil&GasFieldConstruction(Piping&Mechanical) CARREEROBJECTIVE:
Toworkinacompetitiveandchalengeatmosphereandtocontributethebestofmyability towardsgrowanddevelopmentofprogressivecompany.
EDUCATIONALQUALIFICATION:
QUALIFICATION COLLEGE/SCHOOL
DiplomaInMechnicalEngineering
NorthCalcuttaPolytechnicKolkataWest
Bengal
AdvanceDiplomaInComputerApplication(ADCA) B.Tech.InstituteOfComputerEducation OTHERCERTIFICATIONDETAILS:
QUALIFICATION INSTITUTE/SCHOOL
PositiveMaterialIndentificationEquepment
OperationalTrainingoftheNitonXLT-889s
ProvidedbyNitonUkLimitedfromDOHA-
QATAR
NDTLevel-IIin(RT,MPT,LPT,UT) J.P.TechnicalInstitute-INDIA/QATAR InstrumentOperatorTraining(SciAps.Z-200C+) ProvidedbyJeroenvanRunfromK.S.A EXPERIENCESUMMARY:
COMPANYNAME LOCATION DESIGNATION DURATION
NBTC/DSRTECHNICALGEN.TRAD.CO.-
KIPICZOREPC-055B
KUWAITALZOUR
REFINERY
PIPINGSUPERVISOR
10Oct2019TO20
Aug2020
ELECOTSHJKIPICZOREPC-0055A
KUWAITALZOUR
REFINERY
PIPINGSUPERVISOR&QC
INSPECTOR
10July2019To20
03Oct.2019
CCC–(CONSOLIDATED
CONTRACTORSCOMPANY)
SAUDIARABIAJSRU
PK2
PIPINGSUPERVISOR&QC
INSPECTOR
31Jan2017to8
Feb2019
CCC–(CONSOLIDATED
CONTRACTORSPNG-LNGCOMPANY
LIMITED))EPC3
PAPUANEWGUINIA
QCTECHNICIAN
–NDT&PMI
31Mar2012to
21May2013
CCC–(CONSOLIDATED
CONTRACTORSCOMPANY))
DOHA-QATAR
RASLAFFANPGTL
PIPINGSUPERVISOR&QC
INSPECTOR
01Nov2009to07
Sep.2010
CCIC–(CONSOLIDATED
CONTRACTORSINTERNATIONAL
COMPANY)).
DOHA-QATAR
RASLAFFANRGX-
6/7&AKG-2
PIPINGSUPERVISOR&QC
INSPECTOR
3Jan2008to12
Sep.2009
PROFESSIONALEXPERIENCEDETAILS:
DESIGNATION:SUPERVISOR/FOREMAN(SaudiARAMCOApproved),QATAR&PNG,KUWAIT). JOBRESPONSIBILITIES:
Controlandmonitortherelatedactivitiesasgivebelow
FormalinspectionactivitieswhicharerelatedtothePMI.(basedontheSaudiARAMCO’sstandards’ requirements)
IdentifythePMIrequiredjointsfromthedrawingsbasedontheinspectionplan
PreparethePMIrequestondailybasis
CoordinatethePMIteamtoproceedthePMIactivities
ConfirmthePMIworkprocedure’slatestrevisionsapprovalandavailability
VerifyandconfirmthePMItechnicians’certificationdetailsbeforestartthework
VerifythePMIequipment’scalibrationdetails
VerifythePMIresultsbasedontheinternationalcodesandstandardsrequirements
UpdatethePMIresultsintheproject’shistorysheet
Isometriccontrolsheet(ICS)review&relatedactivities
Testpackreview&relatedactivities
PMIrelateddocumentspreparation
Welding-consumables-control:storageandhandlingrelatedactivities
CoordinationwiththeWELDING-PIPINGteamtofulfilthePMIrequirements
ControltheNon-conformance/Violationsbyimplementinnovativeways
Siteinspectionandcoordinationwiththeclientsandthirdpartyinspectionagencies.
RaisingRFI’sInQMISForInspectionNotificationToSAPMTAndPID
MaintainingLogbookForDailyActivitiesAndUpdatingDailyRFIStatus.
QCP&TechnicianApprovalCheckBeforeStartingJobs.
PerformingjobBeforeCheckDateOfCalibratinValidDatePMIMachine.
ToEnsureDateOfCalibrationoftestBlockCertificates.
WitnessingEachJointsWhenPMItechnicianPerformingWork.
InspectionOfJoints&ItsDetailsBaseOnIsometricDrawings.
DailyReportingPerformingJointsReportToQCManager.
ImplementsHSERequirmentsAsPerCompanySpecifications.
AssistsInTheResolutionOfNcr’sByMonitorsTheCorrectImplementation.
PMIUnacceptableReportsPreventiveAndReportToTheQcManagerWhenCorrectiveActionsAreCompleted.
EnsureProducts/ComponentsHaveBeenManufacturedUsingTheCorrectAloy
FindPotentialyMixed-UpAloys
IdentifyIfTheWrongMaterialHasBeenUsed.
EnsureMaterialConformsToTheCorrectStandardAndSpecification.
EnsureWeldedComponentsHaveUsedTheCorrectFiler/EectrodeMaterial
ToPerformPositiveMaterialIdentificationByUsingEitherOfTheTwoTechniquesX-RayFluorescence(XRF) Analyse&OpticalEmissionSpectrometer(OES)
CheckingOfAlReceivedDocumentationIsLegibleAndContainsAppropriate Approval.
IssuingNCR’sWhenNon-ConformityActivitiesWereNotedBySubcontractors.
PrepareWeeklyQualityReportsAndSubmitsToTheSeniorManagement.
MaintainingDocumentsForAuditingPurpose.
ParticipatingAuditProgramsOfFolowUpTheCorrectiveActionRequired.
PreparationOfNDEReportAndInspection/CoordinateWithTheInspectors.
Coordination,Inspection&ReportingAsPerDailyRequest.
MaterialCoordinatorFromSiteStoreToWorkingArea.
ConsumableHandling&StorageForPMI.
InspectionOfIncomingMaterialAsPerStandardSpecification.
ToolBoxTalkForOurTeam.
Inspectingtheincomingmaterialsfordamages,dimensionsandcorrosionsandensurethatMTCisavailable andaccordingtotherequirements.
WorkingknowledgeofcodessuchasAPI,ASMEandASTM preferablyfamiliarwithCLIENTstandardsand specifications.
Familiarwithdrawingsandspecificationsapplicabletotheproject.
Inspectpipingjustbeforeerectiontoverifythatinteriorisclearofforeignmaterials.
Fitupinspectionaspergivendrawingandjointdesign.
Coordinatewithcontractorregardinginspectionmattersandfacilitatesmoothflowofinspectionactivitiesat site.’
Ensurethatpipesupports,hangersandguideshavebeeninstaledin accordancewiththepipingdrawings andthepipesupportdetails.
Checkthecorrectinstalationofspecialpipesupportandtheuseofcorrecttypeofstandardsupportin accordancewiththeinformationshownonthedrawing.
Confirmthepipingsystemconcurswithflowdiagramstoverifycompletenessofsystem.
Reviewofqualityplanandinspectiontestplan.
ReviewofP&ID’s,PipingPlansandIsometricDrawings.
PreparingTestPackageandgettingapprovalfromclient.
EvaluationoftestpackagecontentstoensurethatrequiredNDT,PWHT,Hardnesstest,PMI,Reinformedpad testandflushgrindingofOrificeflangehasbeenperformedpriortofinalsystempressuretesting.
Witnessedtestingofpressuresafetyvalves
Linecheckinginspectionttestpackagesandpunchlisting.
PunchlistingofpipingpackagesforCatO,‘A’,‘B’and‘C”andensurethatproperly identifiedvalvesare instaledinaccordancewiththeflowdiagram.
Witnessingofleaktestandpneumatictest.
Witnessfinalpressuretests,includingverificationthatpressuregaugeshaveadequatedialrangeandis calibrated.
Verifythatthetestingpressuredoesnotexceedthealowabletestpressureofanyequipmentinthesystem.
Verifythattherequiredtestpressurewasmaintainedforthespecifiedlengthoftimewithnoacceptable leakage.
Confirmrepairs,re-testingandre-inspectioninaccordancewithspecifications.Ensureblindsareremovedand correctgasketsareinstaled.
Verifythatcontrolvalvesandotheritemsthatwereremovedforthetestarereplaced.Checkthatwaterhas beenremovedfromcheckvalves.
Witnessingflushingofpipelines.
Re-instatementinspectionofpackages.
Listingandrectifyingcheckofre-instatementpunchlist.
Verificationofclosedpunchitemsandconductwalkthroughforeachcompletedpipingsystem priorto mechanicalacceptance.
Recordalmodificationonmastercopyofdrawingforthefutureuseintheas-builtdrawing.
Responsibleformodificationofpipingdrawingssuchasrevisions.
Preparationofdocumentsfornewlyfabricatedspoolsinfabricationanderections.
Keepupdatecopiesofaldrawingsrelatedtoworksupervisedandmaintain,inseparatefilesuperseded copies.
Supervisethepipingactivitiesincludingfabrication,constructionandcompletionofthedesignatedprojects.
Ensurethataldocumentsreceivedarehavingproperdocumenttitle,numberandrevisionandapproved format.
SupervisetheexecutionandimplementationofinspectionandqualityrequirementsasoutlinedbyCLIENT contracts,standards,procedures,specifications,generalinstructionsandasdirectedbysuperintendent.
Developstrategiestoovercomethepotentialinspectionchalengesduringtheexecutionofproject’sphases andtoprovideresolutiontothefieldtechnicalissues.
Generatereportscoveringalthequalityaspects.
Ensurecontractorsmaintainingqualityrecords,failureandrepairhistoriesasapplicable
Toreceive,distributeandissue/controlofinternalandprojectdocumentation.
Performingflexibleapproachtotheirworkandhoursinordertodeliveragainsttightdeadlines.
Checkingofalreceiveddocumentationislegibleandcontainsappropriateapprovals.
Ensurealprojectdocumentationisprocessed,transmittedandfiledinaccordancewiththerelevant documentmanagementsystem,andcanberetrievedinanaccurateandtimelymanner.
Produceanddistributestatusreportstotheprojectteam whenrequiredandassistwiththereproductionof documentationacrossdifferentmediums.
Supervisethepipingactivitiesincludingfabrication,constructionandcompletionofthedesignatedprojects.
Responsibleforthedaytodayrunningoftheworkonsite
IssuingNCR’swhennon-conformityactivitieswerenotedbythesubcontractors.
PrepareWeeklyqualityreportsandsubmitstotheseniormanagement.
PrepareConstructionAssessmentChecklistsforvariousengineeringdisciplinesandreviseittosuitthesite requirements.
Maintainingdocumentsforauditingpurpose.
ParticipatingAuditprogramsoffolowupthecorrectiveactionrequired.
Review andapprovalofWelderqualificationtestrecord(WQT)andalsoWitnessingWelderPerformance QualificationTest(PWQT)inaccordancewithASMESec.IX.
Inspectfitup preparation,jointconfiguration,cleanliness,pre-heattemp,and theweldingprocedure specificationused.Visualexaminationofrootpasses,penetration,undercut,cracks,slugsandporosity.
Verificationofweldingprocess,welderandconsumablesasperapprovedWPS.
Conductvisualinspectionofwelding,fit-upanddimensionalchecks,inspectionofmaterialsasperapplicable codeandstandardsanddrawing.
Perform stagewiseinspectionatfabricationshoplikein-processDimensional,Fit-up,Welding,material traceabilityrecords,SurfacePreparationasperapprovedInspection&TestProgram.
Carryoutmonitoringinspectiontodetermineweeklyweldingprogressandrejectpercentage.
WelderPerformanceQualificationinprocessSMAW,GTAW etc.WeldingStageInspection(Before/during& afterwelding)
Planning andMonitoring ofWelding Consumables,Preheating,Welding and WeldVisualInspection, PWHT/NDT/HardnessTest,PMITestaspertheWPS,ITP
VisualInspection,NDTofHighPressurePipe,PressureVessels.
PreparationofNDEreportandinspection/coordinatewiththeinspectors
InspectionandClearanceofFitup,WeldVisualofalaboveGround&undergroundPipingandInProcess Inspection,Structural,Valves,HeavyEquipmentJoints,NozzleModificationsInspection PROJECTSUNDERTAKEN:
AL-ZOURREFINERYPROJECTZOR/EPC-0055-BFORKIPICWITHFDHJV/NBTC/DSR
AL-ZOURREFINERYPROJECTZOR/EPC-0055-AFORKIPICWITHTSHJ/ELECOCHINA
JSRU–JIZANSULFERRECOVERYUNITPKG-2PROJECTFOR“SAUDIARAMCO”WITHSAIPEM/CCC
PNG-LNG-EPC3BUILDINGS,UTILITIES&OFFSIDEPROJECTFOREXXONMOBILEWITHJGC/CCC
PEARLGTLPROJECTNUMBER918FORQATARGASWITHJGC-KBR/CCC
RASGASONSHOREEXPENSION-6PROJECTFORQATARWITHCTJV/CCC
RASGASONSHOREEXPENSION-7PROJECTFORQATARWITHCTJV/CCC
RASGASONSHOREEXPENSION-AKG-2PROJECTFORQATARWITHCTJV/CCC PASSPORTDETAILS:
Name : SHAHABUDDINANSARI
PassportNo. : N2875084
PassportDateofexpiry : 03-09-2025
DECLARATION:
Iherebydeclarethataltheabovedetailsaretrueandcorrecttothebestofmyknowledge. Place:INDIA YoursSincerely,
(SHAHABUDDINANSARI
Date:08/09/2020