CURRICULUM VITAE
BINOD SHOW
JSW steel Ltd.
Assistant Engineer
Diploma in Mechanical Engineer.
Date of Birth: 1st DEC 1983
Work Experience: 11 years
Contact No. 702-***-****
E-mail ID- *******@*****.***
Address: -
BH-2/25 V.V.Nagar Township, JSW Steel,
Toranagallu
DIST: Bellary (Karnataka)
PIN.: 583123
CAREER AMBITION:
To seek a challenging position in power project Division of the esteemed organization, this provides the best opportunity to utilize my skill towards the organization as well as my better future.
COMPANY PROFILE:
JSW Steel is India’s leading private sector steel producer and among the world most illustrious steel companies, JSW Steel is India’s leading integrated steel producer with a capacity of 14.3 MTPA.
Coke Dry Quenching (CDQ) is an alternative to the traditional wet quenching of the coke. Coke is cooled using an inert gas in dry cooling plant, instead of cooling by sprayed water which results in high CO2 emissions and thermal energy loss. This process allows the recovery of the thermal energy in the quenching gas which can then be used for the production of steam and Electricity. CDQ also improves the quality of coke and enables reduced coke consumption in the blast furnace. As the product quality is improved, CDQ may also allow for the use of lower cost Non-coking coal in the process, thereby reducing costs.
WORKING EXPERIENCE (11 YEARS):
July 2012 to continued: -As a Assistant Engineer (Working in operation & maintenance Engineer in Power plant.)
JOBS RESPONSIBILITIES:
Working in a shift.
Normal operation of Boiler.
Turbine capacity 1x76 MW (Make BHEL)
Handling Emergency condition like as Blackout, Blower trip, Turbine trip and Module fail etc.
Operation of existing 4x72 TPH CDQ Waste Heat Recovery Boiler (Make Hangzhou Boiler Group Ltd), Rated Pressure and Temperature-:95+-5kg/cm2 & 540+-5degree centigrade.
Type of Boiler-: Single Drum, Natural circulation, Water tube.
Heating surface -:3843m2.
De-pressurizing during normal shutdown & pressurizing during Light up& normalization.
Trial run operation of pumps& compressor.
Cold and hot startup of Boiler.
Maintain Boiler Chemical Report.
Responsible for making daily generation & other reports.
REPORTING TO Shift In-Charge
COMMISSIONING (72 x 4) TPH W.H.R.B BOILER:
I also remain as a member of our Commissioning team which carried out:
Chemical Cleaning of the Boiler.
Leak test & Hydro test of the Boiler.
Steam blowing.
Commissioning 4x72 TPH CDQ Waste Heat Recovery Boiler.
Previous working Experience: 2010 -2012.
M/s Godavari Power & Spat Limited, Raipur. (CPP-85MW)
JOBS RESPONSIBILITIES:
Working in a shift as a DCS Engineer.
Responsible for making daily generation & other reports.
Operation of existing 30 MW, 25 MW TURBINE (Hangzhou Turbine Company China).
Operation of existing 2X10 MW TURBINE (make C.A Parson England) and 10 MW TURBINE (make Hitachi Japan).
Operation of 100 TPH, 70 TPH AFBC BOILER (make CVPL).
Operation of 2X51 TPH, 30 TPH & 56 TPH waste heat recovery Boiler (Thermal system & Tharmax) respectively.
INDUSTRIAL TRAINING: 2008 – 2010:
Worked as trainee engineer in M/s SHYAM SEL & POWER LTD. O & M - From July-01 to DEC.-08 to 2010 (six Months trainee)
CAREER SUMMARY:
Diploma in Engineering from Mechanical
Asansol Polytechnic in West Bengal
Percentage: 73.5 %
ACADEMIC QUALIFICATION:
Qualification School/College University/Board
Diploma Asansol Polytechnic WBSCTE 2008 (73.5%)
12thM.A.M.C Boys High School WBBHSE 2002 (47.5%)
10thJoydevBoy’s High School WBBSE 2000 (53.5%)
PERSONAL PROFILE:
NAME : Binod show
FATHER'S NAME : Balchand show
DATE OF BIRTH : 1ST December 1983
GENDER : Male
MARTIAL STATUS : Married
NATIONALITY : Indian
RELIGION : Hindu
LANGUAGE KNOWN : English, Hindi and Bengali
NOTICE PERIOD : 2 month
Permanent Address:
S/O Balchand Show, 389 Rajendra Prasad Road, B- zone, Durgapur-713205,
Dist.-Burdwan, West Bengal.
Declaration:
I hereby declare that all the information provided above are true and correct.
Year- 2020-21. Binod Show
Place- Toranagallu,
Bellary (Karnataka)