VADIVEL KUMAR.A
Ready to join immediately and seeking roles as Manufacturing Process Engineer, Methods, Assembly, Production Engineer, Process Planning Engineer, NPD Engineer, adh5mr@r.postjobfree.com, +91-978*******, 748-***-****
Prashanth nagar, 4th Cross, T dasarahalli, Near Peenya, Bengaluru-560057--Karnataka State CAREER SUMMARY
Aeronautical Engineer for 8.5 years, with exposure to diversified areas like process engineer, production management, shop floor handling and process documentation in aerospace industry TECHNICAL SKILLS
ECN (Configuration), MFGPRO (ERP Software)
PFD, work instruction, Assembly Operation Sheets (AOS) APQP specification reviews
Concept development of fixtures
5 Why analysis, 5S Shop floor associates training
Usage of SAP, CATIA V5 & Auto CAD
STRENGTHS & ACHIEVEMENTS
Expert in aero structural assembly integration process, and flow chart preparation
Specialist in sheet metal process like metal cutting, bending & forming manufacturing process
Good experience in making manufacturing process of metal forming, heat treatment and finishing of aircraft parts
Good in conceptualizing Engineering Drawings and Documents (BOM, ROUTING & FAI)
Modifying tool and jig and fixture to support the tooling department
Good knowledge on Aero Engines (SU-30 Engine parts) exposure to metal cutting & other manufacturing process
Strong proficiency in sheet metal parts hot forming for ADA engine cover assembly in front of CRI demonstration
Strong fundamentals in GD&T and Surface finishing, tolerance, basics of engineering design and 8D analysis
Cutting tool selection with different material to routing in aircraft assembly PROFESSIONAL EXPERIENCE
DYNAMATIC OLDLAND AEROSPACE, BENGALURU Sept 2017-June 2020 Deputy Manager – Methods
(Assembly, Sub Assembly & Detail parts)
Projects Handled–HAL (LCA Front Fuselage Development to Industrialization), Boeing P8,SUKHOI-30 Turbotech (Welding assy parts)
Accomplishments
As Methods Engineer, handled process planning, technical review meeting, responsible till completion of FAI Production & 1st batch production along with FAI as per AS9102
Executed Configuration Management, EC Management and organizing the documents received from customer to facilitate smooth flow of work
Conducted RCCA Studies, Study of Control charts, AOS, Contract review sheets and customer co-ordination
Periodic Specification reviews and modification of AOS (assembly operation sheet) to add safety parameter led to better operator involvement on the shop floor by limiting the reworks on the product by 15%
Hands on exposure to APQP Elements, PFMEA, Planning Break down Structure(PBS), Creating MBOM’s, PFD, Production preparation planning ERP BOM linking to suit PBS with Process & product key characteristics studies and Control plan
Responsible for seeking special process approvals at Dynamatic.(Special processes include Dimpling, Electrical & Adhesive Bonding, Bearing Staking and Composites Drilling &Trimming
Actively involved in determining route cause for assembly defects & conducted training as Preventive action
To coordinate with production team and Continues improvements team to develop the process improvements activity for assembly, fabrication and details parts.
Production methods process to develop implementation activity from vendor
To support team work with internal audit’s process control,product and standards
To improve production efficiency by lean manufacturing
To utilize and design the space for new requirements along with machine layout
To Prepare product and process reports accordingly
Provide process documentation and operating instructions to display in the shop floor TECH MAHINDRALTD, BENGALURU Nov 2016-Nov 2017-June Methods – Assembly & Sub Assembly
Projects Handled–Bombardier Aerospace (C series)
Accomplishments
7000/8000) Cockpit, Fwd. Fuse and Aft Fuse on Structures & Systems (Electricals) Assembly
(Using Visual Work Instructions and 3D Via composer for assembly
Expertise in Modifying and Installation of Electrical Wire Harness on Aircrafts at Final Assembly Line
Expertise in Avionics Standard Practices such as Crimping, Splicing, Soldering and Wire repairing
As Methods Engineer, handled process planning, technical review meeting, responsible for till completion of FAI Production & 1st batch production, FAI Documentations
Study the component of machines to be used, process parameters, tooling requirements quality requirements
Conversant with the Bombardier Aerospace practices and methodology. Creation of VWI (Visual Work Instruction) using the following software tools
3DVIA – To create VWI of Structural and system assembly with built-up sequence
CATIA V5-R21 – to import and convert to SMG file, Creation of Validation sheet in SAP TANEJA AEROSPACE AND AVIATION LIMITED, HOSUR Mar 2013-Oct 2016 Process planning Engineer– Assembly & Detail parts Projects Undertaken: -Structures Assembly & Detail parts – ADE- RUSTOM-1&2, VSSC (GSLV, PSLV) & IJT Detail parts - HAL- Koraput, Nasik, Safire product container, canister, launcher Detail parts -Cockpit, Control Stick, HAL –ALH, RWRDC & ADA Roles and Responsibilities
Worked on aircraft Structure Assembly (Nose cone, Cockpit, Forward Fuse, Mid Fuse, Aft Fuse and Empennage Assemblies
Supported production team till FAI completion, led customer interactions for technical queries
Conducted regular MRB meeting with CFT and ensuring timely delivery as per PPC committed dates
Participating in innovation and continuous improvement activities using Kaizen, Poka-Yoke
Representative to attend weekly management review meeting and PMR FLEETGUARD FILTERS PVT LIMITED, HOSUR Nov 2011- Feb 2013 Production Engineer
Roles and Responsibilities
Preparing production schedule and activity plan every weekly basis, Manpower management
Improvement activities and develop production team conduct the meeting following FIFO
Achieve the production target and efficiency, Preparation of skill matrix, assigning the operators to line EDUCATION
B.E.(Aeronautical Engineering),from Perumal Manimekalai college of engineering, Hosur (2008-2011) Diploma in Mechanical Engineering,from Thiumathi Elizabeth polytechnic college, Perambalur (2007) Secondary School Leaving Certificate (SSLC)from GBHSS Kuliithalai, Karur (April-2002) OTHER DETAILS
Date of Birth: - 10th-June-1986
Passport no: - K2714640
Languages known: Tamil, English& Kannada
(Vadivel Kumar.A)