ANKUR SHARMA

KATNI MADHYAPRADESH

+91-997*******,+91-930*******

adh5ju@r.postjobfree.com

Objective:

Seeking challenging assignments with some growing organisation where I can devote myself for long term and grow higher within organisation with my best performances. Executive Summary:7.5 years exp.(Including commissioning, O&Mproject in India)

The Instrument & Control installations in the Site include Integrated Control Systems (ICS), Distributive Control Systems (DCS), Emergency Shutdown Systems (IPS),), Advanced process control (APC), Control Monitoring system. Other management devices include Control and Protection of turbine control system (TCS), Anti-Surge system

The role of the Instrument & Control Supervisor is to supervise and participate in preventive, corrective and troubleshooting maintenance, and testing of all plant instrument & control systems equipment

Reviewing instrumentation scope of work, drawings and executing the construction and maintenance activities in line with the project specification and standards.

Supervision of Installation, Termination & Testing of field instruments, conduits, cable trays and tubing for instruments.

Involved in installation, Calibration of instruments such as transmitters, pressure switches, level switches, control valves, temperature sensor, fire and gas detector, mass flow meters, radar tank gauging,

Co-ordination of Installation and pre-commissioning of various equipment and monitoring systems.

Associated with Loop Checking, Testing/Pre-commissioning activities of all types of instruments.

Prepare request for inspection to client for inspections and acceptance of installations and Testing.

Coordinate Quality procedures to construction department, Project management and client Inspectors and Corrective actions for client inspection comments/punch list.

Responsible for clearing the Technical Query’s with consulting client engineers and design department

Associated with preparation and checking following types of drawings, Hook-up drawings for field instruments, Instrument Location & Cable Routing diagram,Instrument duct/Trench layouts, Cable Routing Layout, Cable Tray Layout, Control.Room Layout and cable schedule. 2

Professional Details:

1-BE. (ELECTRONIC & TELECOMMUNICATION)

2- PGDIA / 6 Months (Post Graduate Diploma in Industrial Automation) Working on project (A, B,C,D,E)

A- Company : CHINA KUNLUN CONTRACTING & ENGINEERING CORPORATION Designation : Sr. Engineer (Instrumentation)

Project: Polypropylene Project,Paradip I.O.C.L.

Period: February -2018to till date

Involve in the development and training of client’s personnel when requested.

Organise,monitor,report,on assigned work scope.

Review the project execution developed by the cost and planning department.

Inter-action with client,company management and other disciplines to devlop the control, seafty and monitoring system and instrumentation philosophies per the above criteria.

Issue material requisition to the procurement department for enquiry,order placement and for any subsequent revisions.

Involve in fat and sat checking work.

Major involvement in Installation,Impulse line fabrication,Calibration(HART-475),Loop Checking and Commissioning

Installation of various type of instruments and package sensor (PT,FT,LT,TT,TI,PI,LG) CV

Troblelshoot of vendor pakage, field instrument& Logic check like interlocking and functional test.

Involve in commissioning with vendor of compressoer (COPERION EXTRUDER&ADITIVE KIRLOSKAR REFRIGERANT COMPRESSOR,ZEPLINE homogenization, ISG-hydrogen purification, RGC,Steamer Off gas Compressor AND Bagging ) B- Company : OFF SHORE INFRASTRUCTURE LTD.

Designation : Sr. Engineer (Instrumentation)-

Project:GORU GOVIND SINGH REFINRY (LOW COST EXPANSION PROJECT) Period: OCT-2016 to December 2017

Responsibilities-

Planing and Billing processs overall measurement work

Observation and participate in preventive, corrective and troubleshooting maintenance, and testing of all plant instrument & control systems equipment

Instrument calibration (HART TYPE PT,FT,VARIOUS TYPE OF LT,CONTROLE VALVE

,ON/OFF VALVE,FF TYPE ALL TRANSMITTER,MOV,SWITCHES)

Loop checking of vendor pakage& field instrument (FF,HART)

Instrument installation (PT,FT,LT,TT,TI,PI,LG)

Torque and limit setting MOV with communication fiedbus.

Cable laying for vendor package

Troblelshoot of vendor pakage& field instrument (FF,HART)

Involve in commissioning withvendorofcompressoer (LGC-SIMENS& RGC-BHEL,PROPEN REFRIGERANT COMPRESSOR,EXPENDOR ATLAS COPCO)

3

C- Company : OFF SHORE INFRASTRUCTURE LTD.

Designation : Sr. Engineer (Instrumentation)-

Project : BPCL Mahul Mumbai

Period:june- :2015 APR To OCT-2016

Responsibilities

Job Scheduling / Monitoring

Major involvement in Installation, Impulse line fabrication,Calibration(HART- 475),Loop Checking and Commissioning

Installation of various type of instruments (PT,FT,LT,TT,TI,PI,LG) CV

Installation of temrature instruments like RTD,T/C

Installation of junction box as per drawing .

Cable laying (conventional and non conventional,T/C,RTD cable)

Continuity and loop checking

D- Company:Offshore infrastructures Ltd.

Designation:Sr. Engineer (Instrumentation)

Project :GAS AUTHORITY OF INDIA LIMITED Vijaipur C2-C3 Recovery Project. Composite –I .

Period:Feb-2014 to 2015 April

Responsibilities

Recalibration of Existing Instrument

Junction Box Location Finalization

Rerouting of existing cable

Cable laying as per new schedule

Checking / Replacement and Installation of Manifolds & Isolation Valves

Installation and rerouting of TE and Thermo cable respectively

Re-installation / Calibration of Displacer Type Level Transmitter, PT, PI, TE

Monitor the execution schedule & Progress Report and record activity deviation in the field and make plan to eliminate this

Reinstallation of existing impulse line .

Proper Co-ordination with Operation and Project Team

Successfully parallel completed the task within tight schedule and man-hours

Prepare as built Diagram and final documentation 4

E- Company: Offshore infrastructures Ltd.

Project:GAS AUTHORITY OF INDIA LIMITED Pata Project. Designation: Engineer (Instrumentation)

Period:Jan-2013 to feb-2014

Responsibilities

Cable Laying(FF Cable, conventional cable)

Instrument installation (PT,TT,FT,PI,TI,TE) all type

Duct and tray routing.

Junction box installation

Calibration work,

Impulse Line

Cable laying ( Conventional & FF cable )

Involvement in free issue material

Computer Knowledge –

Languages : C, EXCL, PPT, MS –WORD

Operating Systems. Windows XP, Windows Vista, Windows 7 Personal Details

FatherName: Daduram sharma

Mother Name: Mamta Devi sharma

Date of Birth: 10/07/1990

Marital status: Married

Spoken Languages: English, Hindi

Address : H.no. 924/6 Rafi ahamab kidwai ward, jagrti colony, katni Madhyapradesh,India

Pin code :483501

I hereby declare that the information furnished above is true to the best of my knowledge. Place: CHIRIMIRI (C.G.)