Post Job Free

Resume

Sign in

Maintenance Assistant

Location:
Vasant Nagar, Karnataka, India
Posted:
November 26, 2020

Contact this candidate

Resume:

VINOTHKUMAR.S

adh5dr@r.postjobfree.com

Mob no : 088********

Objective

responsibility Looking that forward will improve for company’s an opportunity, development where and I enrich can my prove professional my quality skills. and Professional experience

M K FASTENERS, (Leading Fastener Manufacturer for automotive applications) Bangalore. An Leading IATF manufacturer 16949 : 2016 certified of high precision organization. and special fasteners. Duration: Designation: Sept 2015 Assistant to Till date. Manager (Maintenance). Location: M K FASTENERS - II, Bangalore.

L.G.Balakrishnan & Bros Ltd, (ROLON CHAINS & SPROCKETS) Maharashtra. An Leading ISO/TS manufacturer 16949 certified of chains, organization. sprockets, belts and rubber products. L.G.B has become the first Indian company to supply timing chains for four wheeler. Duration: Designation: October Assistant 2012 Engineer – Aug 2015 (Maintenance) Location: L.G.Balakrishnan & Bros Ltd, Aurangabad, Maharashtra. Roles & Responsibilities

Set Prepare Provide Effectively Reduce Reduce Implement Competent Focused Develop maintenance Ensure hydraulic Improve Preparing Preventive Breakdown To Overhauling Leading Involving Spare Follow-analyze department parts up repairs Energy routine technical the the and equipment a and in and and delegate defect (TPM in management. maintenance annual new IR, Planned various the target is problem pneumatic maintaining interface cost. TBM) & carried objectives/calibration activities old machine maintenance expertise phenomenon driven Maintenance any machine availability improvement and Preventative solving, out maintenance with systems and predictive commissioning in with KPIs the to and KH and outside countermeasure the documents cost. team a due and pillar. and maintenance budget. positive run team. are & to enhance Maintenance review maintenance building, restoration agencies. issues successfully. undertaken. Equipment and as and to equipment per planning smooth requirements be implementation assess Projects. IATF resolved (and (CBM) PPM) running. countermeasure master ongoing and efficiency. schedule, on decision of each list to a performance variety avoid shift. making ensure to re-of avoid occurrences electro-of full direct re-preventative occurrences. mechanical, reports

A. Monitor Breakdown and hours update the following documents in MRM meeting. B. C. MTTR PM plan & vs MTBF Actual

D. E. Continual Breakdown improvement analysis report for top 3 breakdowns F. Maintenance cost

Create Reading design Implementing Implementation Analysis Working Assessing Optimum management master and of of knowledge and utilization teach repetitive drawings direction list reporting and of the of maintaining Autonomous machines in same of (equipment Hydraulics, and SAP/Man, safety to reporting ERP sub Material with hazards 5S maintenance end failures. ordinate. Pneumatic activities specification. user. of and associated maintenance Machine. in & in maintenance machine shop with Provide activities floor. maintenance design) department. guidance to and management. of if equipment. to required the team making based a on new Professional skills

Air Continuous Fully High Mechanical Cold Electrical Utilities compressor forging speed automated - Diesel rotary stamping (mesh (Pilot) machines Atlas generator furnace, belt plating and copco) presses - (servo Heat Nedschroef, Endogas (Surface (1010 treatment feeders (Sino, Kva treatment) system aida, Jern for & furnace 750 stamping yao, minster) & Continuous Kva) Asahi line (SANYUNG - press (okuma, WCPT tempering - - Waterberry, 1TON/1TON/furnace. HOUR) HOUR) F K Ware, Sakamura)

Sinto machine, Working Knowledge bharat Knowledge Milling Fork Multi and shot lift utility responsible machine peening, - Diesel in vehicle hydraulic operated Orbital for - Bobcat IATF and tumbling, & pneumatic Battery S450 16949:Single operated 2016 systems. barrel Tumbling, surface grinding Academic profile

2012 2008 – – B.XII E - - 65% 76 % R.(Mechanical C higher secondary Engineering)school, J.J trichy. College of Engg & Tech, trichy. 2006 – X - 76.2% A.M.R.C high school, trichy.

Field of interest

Commissioning Learning Manufacturing Total productive about of new and maintenance. new Servicing machines products. of design all type and of working machines. principle of all parts in the ma. Software skills

SAP MS Auto office & CAD ERP (MM & PM Module), Project details

Involved in erection and commissioning of heat treatment furnace and plating line.

U.G (mini project) design and fabrication of turnbuckle.

U.G (main project) modeling and static stress analysis of srilankan tc shell (end wall collision) in integral coach factory.

Co-curricular activities

Participated Participated Undergone Undergone an an in in in in in SEVEN workshop workshop plant plant QC training training on on TOOLS “METAL “Automotive in in in central T V LGB sundram FORMING” conducted workshop, Technology iyengar at by ANNA SOUTHERN and vision & sons UNIVERSITY Design technologies. limited RAILWAY tools” (TVS)TRICHY. at NIT. trichy., trichy. Extracurricular activities

Participated in BAJA during 2010 and 2011.

Participated Student member in TREK. of ISME.

Personal profile

Name Father’s name : : S.V. Vinoth Selvaraj Kumar

Address : Gundur, 1/348 Ayyanar trichy, Tamilnadu. nagar, Languages Passport no known : : Tamil, K 1948186 English, Hindi, Kannada Declaration

belief. I hereby declare that all the details given above are true to the best of my knowledge and Place: Date: Bangalore (VINOTHKUMAR.S)



Contact this candidate