Post Job Free

Resume

Sign in

Engineering Manager

Location:
Mumbai, Maharashtra, India
Salary:
24 lacs pe anum
Posted:
November 26, 2020

Contact this candidate

Resume:

Employment

Job Title – Chief Engineer at Palladium mall and High street Phoenix mall, Lower parel, Mumbai

Location – Mumbai, India

Dates of Employment – 1st May’2018 to till date

Core Work Activities:

Managing Engineering operations for Palladium mall and high Street Phoenix Mall, having 500 plus retailers, 26,00,000 sq.ft area with average footfall/day of 70,000 people, central air-conditioning plant of 2280 TR + 250 TR VRF AC system, STP of 650 KL/day, overall manpower of 100 nos associates.

Responsible to manage Palladium mall of 10,00,000 sq.ft. Engineering operations + High Street Phoenix Mall of 12,00,000 sq.ft. Engineering operations + 4,00,000 sq ft commercial zone engineering Operations.

Handling various Projects like washroom renovation, chandeliers installation, flooring marble replacement, Entire ceiling work with new gypsum ceiling fixing work, new ramp car connecting bridge work, inlet water main line work from BMC, both zones tank interconnectivity pipe line work etc.

Leads energy management efforts by establishing, implementing and monitoring energy management plans and creating a culture of energy management and conservation

Manages the physical plants including equipment, refrigeration, HVAC, plumbing, water treatment, sewage treatment and electrical systems in accordance.

Coaches and supports engineering team to effectively manage controllable expenses (HLP, water consumption, tools and equipment’s, service agreements, consumables etc)

Project Completed in FY 2018-19

1.Palladium Atrium Exhaust installation & commissioning

2.Electromagnetics flow meter installation work completed at tanker inlet at both zones.

3.Digital Fire Pressure installation work at fire pump room.

4.Chandeliers installation

5.Parking plates

6.Gantries GS 06, 07

7.Sai new entry with cars connectivity bridge

8.Palladium new driveway near power house

9.NSZ ground floor corridor & toilet

10.Grand west zone toilet

11.SWD for RG & SAS area

12.F&B at 3rd & 4th floor of Palladium

13.Universal square

14.3C barricading

15.Palladium annex extension

16.Phoenix house entrances A & B wing

17.Palladium smoke extraction

18.NSZ 1st floor toilet

Job Title – Deputy Chief Engineer at

Phoenix Marketcity, Kurla, Mumbai

Location – Mumbai, India

Dates of Employment – 10th October 2014 30th April’2018.

Core Work Activities:

Managing Engineering operations for Phoenix Marketcity Mall, having 350 retailers, 12,00,000 sq.ft area with average footfall/day of 50,000 people, central air-conditioning plant of 4,800 TR, STP of 900 KL/day, Reverse Osmosis Plant of 27 M3/hr and overall manpower of 67 associates.

Responsible to manage Phoenix Marketcity Mall of 12,00,000 sq.ft. Engineering operations + Paragon Plaza Mall of 8,00,000 sq.ft. Engineering operations + upcoming Orion Office Space ( Art Guild House ) 6,00, 000 sq ft engineering operations.

Leads energy management efforts by establishing, implementing and monitoring energy management plans and creating a culture of energy management and conservation

Manages the physical plants including equipment, refrigeration, HVAC, plumbing, water treatment, sewage treatment and electrical systems in accordance with SOPs.

Coaches and supports engineering team to effectively manage controllable expenses (HLP, water consumption, tools and equipments, service agreements, consumables etc)

Oversees entire FLS (Fire & Life Safety) program.

Key Achievements:

-Spot Award in July-15

-Spot Award in August-15

-Employee Of The Month in January-16

-Employee Of The Year for 2015-2016

Job Title – Manager - Engineering

Inorbit Malls India Pvt.Ltd.

Location – Mumbai, India

Dates of Employment – 1st Apr 13 to 5th Oct 14

Core Work Activities:

Implements policies and procedures under the guidance of General Manager.

Maintains all distribution system of Electricity, Water, Gas etc.

Maintains and operates Air condition system.

Monitors and co-ordinates the service performed by the inside project team & outside contractors in accordance to the contract, service agreements and warranties.

Keep all records pertaining to light, power, and cost of facility while the original documents are submitted to the financial controller.

Keep all records pertaining to Assets, Equipment’s History cards, break down Register and SOP.

Submitting documents to government bodies like Electrical inspector, DG Inspector and Lift inspector.

Co-ordinate with government bodies like BMC, Reliance, Tata Power, Electrical inspector, DG Inspector, Lift inspector and Fire officer.

Ensures timely response to service request from Retailers, Employees and Management to repair or replace interior fixtures or furnishing.

Plans, Implements and Administers energy management program.

Maintains appropriate equipment operating log book.

Establishes annual energy reduction objectives.

Preparation of capital expenditures budget.

Maintain repair and maintenance budget.

Maintains purchasing record, equipment manual.

Maintains a clean and orderly work area, free of hazards.

Performs other duties and responsibilities which may be assigned by the management.

Exhaust and Air-conditioning issues in mall are controlled on priority basis.

Retailer’s fit out drawings approval and supervision of all works.

Job Title – Assistant Manager - Engineering

Inorbit Malls India Pvt.Ltd.

Location – Mumbai, India

Dates of Employment – 1st Aug 11 to 31st Mar 13

Core Work Activities:

Maintains all distribution system of Electricity, Water, Gas etc.

Maintains and operates Air condition system.

Monitors and co-ordinates the service performed by the outside contractors in accordance to the contract, service agreements and warranties.

Keep all records pertaining to light, power, and cost of facility while the original documents are submitted to the financial controller.

Keep all records pertaining to Assets, Equipment’s History cards, break down Register and SOP.

Submitting documents to government bodies like Electrical inspector, DG Inspector and Lift inspector.

Co-ordinate with government bodies like Reliance, Electrical inspector, DG Inspector, Lift inspector and Fire officer.

Ensures timely response to service request from Retailers, Employees and Management to repair or replace interior fixtures or furnishing.

Plans, Implements and Administers energy management program.

Maintains appropriate equipment operating log book.

Establishes annual energy reduction objectives.

Preparation of capital expenditures budget.

Maintain repair and maintenance budget.

Maintains purchasing record, equipment manual.

Maintains a clean and orderly work area, free of hazards.

Performs other duties and responsibilities which may be assigned by the management.

Exhaust and Air-conditioning issues in mall are controlled on priority basis.

Retailer’s fit out drawings approval and supervision of all works.

Making HLP and MIS reports.

Key Achievements:

-Removed 320 TR Carrier chiller 2 nos and installed 800 TR Trane water cooled chiller on terrace with Chilled water and condenser piping modification.

-MS structure strengthening for 800 TR Trane water cooled chiller installation.

-Made enclosed shade for 800 TR Trane water cooled chiller.

-Replacement of existing cooling tower with new Cooling Tower for 700 TR Trane Chiller with structure modification.

-Complete food court renovation including revamping of HVAC system, Electrical system, Fire Fighting system and civil work.

-Fuel change project LPG to PNG conversation.

-Installed and commissioned new LT ACB Panel for complete Electrical distribution of Inorbit common area without disturbing mall operation.

-Installation of Gas bank vaporization system.

-Installed and commissioned 3 no’s Grease trap chamber to provide clean inlet to STP.

-Installed new Grundfoss system for complete mall water distribution.

-Installed and commissioned new chiller plant manager for 3 nos. chillers. Total capacity of chillers is 1800 TON.

-Hydrant and Sprinkler main pump modified by higher capacity.

-Completed replacement of Ground and First floor common area tiles.

-Retrofitting of Food Court & Extension Food Court AHUS.

-Create platform and railing in STP.

-Installation of Sliding Gates at 3 no’s Mall Entrances.

-Replaced 120 no’s AHU of various Tonnage to maintain the cooling and also more than 25 no’s retailers ducting modification done to get appropriate CFM through AHU. Also taking various initiatives to improve Mall common area cooling.

-Taking initiative in saving total electrical consumption of mall through

Save power have power campaign.

-Installed and commissioned catwalk on the Roof.

-BMS installation work done.

-Replacement of Dome covers of Atrium & Food court.

-Modification of STP plant.

-Water proofing of RCC roof and soft roof.

-Power house revamping Work Done.

Job Title – Facility Manager - Engineering

Inorbit Malls India Pvt.Ltd.

Location – Mumbai, India

Dates of Employment – 26th Mar 09 to 31st Jul 11

Core Work Activities:

Follow-up & tracking on the prepared preventive maintenance schedule.

Meeting with the Management team for 24 hours report. (Daily)

Meeting with the head of engineering dept. for 24 hours report & discussion for major work. (Daily)

Proper facility rounds with property management. (Daily)

Preparing documents for engineering audit.

Preparing critical equipment specification.

Proper inventory control & tracking of material.

Coordination with Operation & engineering teams.

Timely reporting on failure equipment & appropriate measures for rectification.

Timely reporting on daily activities of operation, maintenance of engg. Relative equipments & energy consumption (Electrical, Water & fuel) to The Head of engineering Dept. through mail & hard copy of all the reports.

Daily Briefing of Engg. Persons during shift hand over.

Preparing a Periodic Preventive Maintenance schedule for all the equipment.

Preparing a complete equipment inventory.

Proper tracks of all maintenance complaints made with the vendors.

Tracking of AMC & renewal for utilities equipments.

Preparing shift schedule for maintenance team for 24x7 operation & maintenance.

Preparing Weekly & Monthly reports & reporting to head of engineering dept. through mail & hard copy.

In the emergency crisis to take the decision to restore the situation. If no one available from higher authority.

Preparing MMR report for CEO’s presentation.

Preparing Electrical, Water & BTU individual bills for all retail outlets.

Preparing attendance for invoice & salary with client signature.

Submission attendance for invoice in office & invoice submission on site.

Site Payment collection & submission in the office.

Job Title – Area Manager

M/s. Absotherm Facility Management

Location – Mumbai, India

Dates of Employment –10th Nov 08 to 25th Mar 09

Core Work Activities:

Oversees engineering operations of different sites under AFM

Help Human Resources for technical recruitment

Ensure administration of engineering of different sites

Provide commercial support to various sites under AFM

Provide technical training to the staff

Meeting with client officials time to time to ensure productivity and trouble-free operations

Submission of invoices on timely manner to various clients and follow-up for the payment

Job Title – Shift Engineer

Inorbit Malls India Pvt.Ltd.

Location – Mumbai, India

Dates of Employment – 11th Jan 08 to 9th Nov 08

Core Work Activities:

Follow-up & tracking on the prepared preventive maintenance schedule.

Daily morning meeting with the Mall Management team for 24 hours report.

Daily morning meeting with the head of engineering dept. for 24 hours report & discussion for major work.

Proper facility rounds with mall management (C.E.E.)

Preparing log sheets & maintaining the service reports for all equipments.

Coordination & follow up with all vendors.

Preparing daily reports & reporting to Mall management & head of engineering.

Proper tracks of all maintenance complaints made with the vendors.

Tracking of AMC & renewal for utilities equipments.

Preparing critical equipment specification.

Proper inventory control & tracking of material.

Coordination with Operation & Maintenance teams.

Timely reporting on failure equipment & appropriate measures for rectification.

Joint timely reporting on daily activities of operation, maintenance of engg. Relative equipment’s & energy consumption (Electrical, Water & fuel) to The Head of engineering Dept. through mail & hard copy of all the reports.

Daily Briefing of engineering persons during shift hand over.

Tracking of complete equipment inventory.

Proper tracks of all maintenance complaints made with the vendors.

Tracking of shift schedule for maintenance team for 24x7 operation & maintenance.

Preparing daily reports (Complaints logging, energy consumption, MOD points report) & reporting to Mall management team & head of engineering dept. through mail & hard copy.

In the emergency crisis to take the decision to restore the situation. If no one available from higher authority.

Job Title – Senior Service Engineer

M/s. Absotherm Facility Management

Location – Mumbai, India

Dates of Employment – 17th Jul 06 to 10th Jan 08

Core Work Activities:

Maintenance & operation of Thermax Vapour Absorption Machines.

Maintenance & operation of boilers

Please refer the below Important sites list.

M/s. Hilton tower, (Oberoi hotel) Nariman point, Churchgate.

M/s. Hotel Grand Hyatt, Santacruz. (E)

M/s. Hotel Renaissance, Powai.

M/s. IPCL, Nagothne.

M/s. Reliance ind. Ltd, Patalganga.

M/s. Thermex chemical ltd. Khopoli.

M/s. Juhu Hotel (P) Ltd. Juhu.

M/s. Medley Pharmaceutical, Marol.

M/s.Ruby mill, Khopoli.

M/s. Global Telesystem Ltd. Mahape.

M/s. Chemspec Chemicals, Talooja.

M/s. Septodent Healthcare, Talooja.

M/s. Sushrut Hospital & Research Centre, Chembur (W)

M/s. Mahanagar Gas Ltd., Bandra (E)

M/s. Nicholas Piramal Research Centre, Goregaon. (E)

M/s. Asian Heart Institute & Research Centre, Bandra.(E)

M/s. Tata steel, Borivali (E).

M/s. Sun & san hotel, Juhu.

Job Title – Site Supervisor

M/s. DES Electro Services

Location – Surat, Gujarat

Dates of Employment – 20th Nov 05 to 10th Jul 06

Core Work Activities:

Erection & Commissioning of 380 KVA of D.G. set.

Erection & Commissioning of 380 kv /0.4 kv oil cooled X’mar, 630 kv.

H.T. & L.T. Cable laying.

Erection & Commissioning of Sub Distribution Board.

Trench Excavation (Inc. road crossing).

Erection of Double pole structure.

Erection of Street light pole.

Job Title – Apprentice – Electrical

Gujarat State Electrical Corporation Limited

Location – Surat, Gujarat

Dates of Employment – 17th Nov 04 to 16th Nov 05

Core Work Activities:

Maintenance of L.T. Meters.

Maintenance of Street lights

Maintenance of A.C.B. in 6.6 kV Control Room.

Job Title – Site Supervisor

Vasudev Electricals

Location – Surat, Gujarat

Dates of Employment – 1st January 04 to 11th Nov 04

Core Work Activities:

Maintenance of 11 KV/ 440 volt S/S of Torrent Power SEC ltd.

Maintenance of 220 kV switch yard of ESSAR Ltd.

400 mm2 cable laying in “F” receiving station of Torrent Power SEC Ltd.

Worked in 11 kv/220 kV switch yard of Kakrapar Atomic Power Station.

H.T. & L.T. Termination & Joint of Cable.

Erection of Audit meter, L.T. panel, Capacitor, L.T. Cable.

Personal Skills:

Team Player

Trainer

Lead by examples

Communicator

Organized

Quick Learner

Resourceful

Education:

Diploma in Electrical Engineering

Contact Details:

Vishal Rameshbhai Dhimmar

C-301, Silver Garden CHSL.

JB nagar,

Andheri (East)

Mumbai - 400059

DOB: 25th March 1985

Mobile – +919*********

adh402@r.postjobfree.com

Skype: vishal250385

Family Details

Mother Name- Hansa Dhimmar.

Father Name- Ramesh Dhimmar (Expired)

Shift with Family- Yes I can shift.

Education: Diploma in Electrical Engineering.

Year- 2003

Marks- 72.57%

Joining Period: Immediate

Current CTC : 20 lacs per Anum.



Contact this candidate