EDUCATIONAL ATTAINMENT:

Name of School Location Year Course

DMMMSU – CET San Fernando, La Union 1982 - 1987 B.S.M.E EMPLOYMENT HISTORY:

Summary of Experience:

Over twenty four ( 24 ) years of experience in construction / commissioning / operation and maintenance work for Oil & Gas Refinery (Onshore & Offshore), Petrochemical Plants, Power Plants, Industrial Plants, Rotating Mechanical Equipment, and Heating, Ventilating & Air Conditioning Projects. I had been working overseas projects for over 20 years in different countries such as: Saudi Arabia, Qatar, The Netherlands, United Kingdom, Belgium, Germany, Russia, Myanmar, Malaysia and Singapore. From Project Engineer to Project Manager and from QC Engineer to QA/QC Manager, my experience in field executions includes; Piping / Structural Steel Fabrication & Installation, Mechanical Equipment Installation (static & rotating), Piping installation & design, Maintenance work, Quality Management & Inspections, Quality Documentation, Document control, Preparation of Quality Procedures, Testing & certify Welders, Perform Quality Audits, Cost Estimates / Scheduling and Commissioning works. Familiar with ASME/ANSI codes, API, ASTM, AWS D1.1 and other European standards, etc.

AWARDS, TRAINING, SEMINARS AND MEMBERSHIP

A. Energy Consumer & Stakeholders Conference held by the Department of Energy (DOE) Date: 12 July 2017

Venue: Philippine International Convention Center (PICC), Pasay City, Philippines Session attended: Renewable Energy Programs

B. Information, Education and Communication Campaign on the Philippine Energy Plan (PEP) 2016 – 2013 by the Department of Energy (DOE)

Date: 04 November 2016

PERSONAL DETAILS

Name : Ernesto L. Fabros

Home Address : Avida Towers, San Lorenzo, Unit # 2311, Tower 2, 2208 Chino Roces Avenue, Pio Del Pilar, Makati City Philippines.

Home Tel. no. : (+63)2-79503764

HP : +63-939*******

Email address : adh25a@r.postjobfree.com

Weight : 70 kgs.

Height : 5 ft. 6in.

Sex : Male

Civil Status : Married

Nationality : Filipino

Profession : Mechanical Engineer

Date of Registration : December 5, 1988

Validity : September 27, 2022

Page 2 of 11

Venue: F1 Hotel, Bonifacio Global City, Philippines C. Certificate of Attendance – 64th Philippine Society of Mechanical Engineers (PSME) National Convention

Date: October 5 – 8, 2016

Venue: SMX Convention Center, Pasay City

Seminars Attended:

- Education, Commercial and Industrial “Medical Gas system”

- Plenary Session “Construction Management”

- Plenary Session “Alternative Dispute Resolution/Arbitration”

- Plenary Session “ Business Strategies for Global Market”

- Environmental, Health and Safety “ Understanding Revised Fire Code of the Philippines”

- Environmental, Health and Safety “ Monitoring and Visualization of Particle Distribution in a Microchannel using the New Technique Computer Process Tomography”

- Heating, Ventilation, Air Conditioning and Refrigeration “ Oil Fouling”

- Heating, Ventilation, Air Conditioning and Refrigeration “ New Ejector Design for HVACR”

- Environmental, Health and Safety “ Safety or Relevance of Occupational Safety and health

(OSH) in Mechanical Engineering

- Education, Commercial and Industrial “Piping, Assessment & Economic Replacement”

- Environmental, Health and Safety “ Energy Management System ISO/50001”

- Education, Commercial and Industrial “ Designing Stand – by Generator Systems”

- Environmental, Health and Safety “ Fire Flow and Hydrant Requirements”

- Certificate of Appearance – 64th PSME National Convention with the theme “ Challenges and Opportunities to Globalization and Cross Bordering” D. 2014 – 2015 Transmission Development Plan (TDP) by National Grid Corporation of the Philippines

(NGCP)

Date: 17 May 2016

Venue: Marco Polo Hotel, Davao City, Philippines

E. Certificate of Appreciation Award for Safety, Quality and Productivity. Award Given By: ExxonMobil – Singapore Parallel Train Project. Date awarded: March 2013

F. Safety Instruction Course (Manhole) for Supervisors Conducted by: Absolute Kinetics Consultancy Pte Ltd, Singapore Date of Course: February 7, 2010 (Special for one day) I.D: Serial No.: AKC-10-07415

G. Safety Orientation Course (Manhole) Workers.

Conducted by: International Training Solutions Pte Ltd, Singapore Date of Course: 24 August 2009.

S/No.: SOCMH/09/08/003

H. Internal Quality Audit Training Course (ISO 9001:2000) and passed the examination. Date: May 24, 2006.

Conducted by: CCIS Singapore Pte Ltd

Address: 16 Jalan Kilang Timor, # 08-05, Redhill Forum Singapore 159308.

I. Seminar on ASME Code awareness program by ABS Industrial Services Verification Inc. Date: February 10 to 17, 1996.

Place: A. De Vera Corporation Plant, Philippines

Page 3 of 11

J. Seminar on Productivity thru Workplace Management (GEMBA KAIZEN & 5’S) by the Philippine Federation of AOTS – ABK Alumni Societies (Phil FAAAS) in cooperation with JMA Management Centre INC. (JMAM)

Date: February 8-9, 1996

Place: Manila

K. Seminar by Philippine Welding Society (welding & testing, boiler and pressure vessel code (ASME section I & II, ASME IX), Steel structure automation. Place: Shangri-La EDSA Plaza Hotel.

Date: November 10, 1995

L. Member of Philippine Society of Mechanical Engineers (PSME) – Makati Chapter PSME O.R. No.: 2324

PSME Membership No.: R-120827

Date of membership: August 18, 2016

M. Member of American Welding Society (A.W.S), 1990 to 1992 Address: 550 N.W. Le Jeune road

P.O. Box 351040, Miami,

Florida, U.S.A.

Member Number: 916308

N. H2S (hydrogen sulphide) training in offshore for Qatar General Petroleum Company (Q.G.P.C.) by Maritime Industrial Services, Sunbelt Division

Address: Dubai

List of Major Projects worked & Location:

1. MA’ADEN/SWCC RAS AL-KHAIR 2400MW Gas Power Plant, KSA Position: Quality Consultant (MA’ADEN Representative) Duration: June 2013 to Feb. 2014

Company: Atlantic Projects Company Ltd

2. ExxonMobil Singapore Parallel Train Project (SPT), Singapore Position: QA/QC Manager

Duration: May 2009 – May, 2013 (Major Mechanical Equipment Installation work) Company: Atlantic Projects Company Ltd

3. BFG-PROJECT GENT, Belgium

Position: QA/QC Manager

Duration: July 2008 – Feb. 2009 (Pre-heater Fabrication & erection) Company: HOLLAND KETELBOUW BV

4. SembCorp Utilities Boiler Island Project, UK & Netherlands Position: QA/QC Manager & Technical Representative Duration: Dec.2007 – Jun 2008 (Boilers manufacturing and installation work) Company: HOLLAND KETELBOUW BV

5. SUMGAIT POWER STATION, Azerbaijan

Position: Site Project Manager / Quality Manager

Duration: Aug 2007 – Dec. 2007 (1 unit Aux. Boiler installation work) Company: HOLLAND KETELBOUW BV

6. KAPPAR Power Station, Malaysia

Position: Site Project Engineer / Quality Manager

Duration: Sept. 2006 – Oct. 2006 (Repair work)

Company: JURONG Engineering Ltd

7. SembCorp Utilities Cogeneration Plant, Singapore Position: Site Manager / Quality manager

Duration: June 2006 – July 2006 (Modification work – Boiler HP Drum) Company: JURONG Engineering Ltd

Page 4 of 11

8. The PolyOlefin Company (TPC), Singapore

Position: Shutdown and Maintenance engineer (Owner Representative) Duration: June 2003 – Sept. 2003; Aug. 2006 – Sept. 2006 (Shutdown & Maintenance work). Company: JURONG Engineering Ltd

9. SembCorp Utilities Terminal, Singapore

Position: Senior QA/QC Engineer

Duration: Feb. 1998 – Oct. 1998; Aug 2005 – May 2006 (Boilers installation work) Company: JURONG Engineering Ltd

10. SembCorp Utilities Terminal, Singapore

Position: QA/QC Engineer

Duration: Oct. 2003 – March 2005 (Repair & upgrading of Boilers) Company: JURONG Engineering Ltd

11. MYANMA Electric Power Enterprise, Myanmar

Position: Project Engineer

Duration: July 2002 – Sept. 2002 (Repair, re-installation & commission work of 2 units Gas Turbine) Company: JURONG Engineering Ltd

12. PETRONAS GAS DISTRICT COOLING - (KLIA), Malaysia Position: Senior QA/QC Engineer / Senior Mechanical Engineer Duration: April 1996 – Sept. 1997 (construction phase); Oct. 1998 – Nov. 2001 (Operation & Maintenance of 2 X LM2500 GE Gas Turbine)

Company: JURONG Engineering Ltd

13. QATAR General Petroleum Company North Field Development Project, Qatar & KSA Position: QC Engineer

Duration: April 1989 – October 1990 (on-shore Modules fabrication & Off-shore hook-up installation) Company: BELLELI Saudi

14. ARAMCO Increase YANBU Crude Export Capacity Project, KSA Position: Project Quality Inspector

Duration: Oct. 1990 – Aug. 1991 (Off-shore Jacket legs & crude storage tank fabrication) Company: BELLELI Saudi

EPMPLOYMENT HISTORY (Local & Abroad)

I)From Sept. 2015 up July 30, 2020:

Company : CARAGA Renewable Energy Corporation

(An Eastern Petroleum Group of Companies)

Address : 7th Flr. Cityland Pasong Tamo Tower, Km. 8 2210 Don Chino Roces Avenue, Pio del Pilar, Makati City 1231, Philippines

Position : Project Manager

Project Handled : CARAGA 23.5MWe Biomass Power Generation Facility Project Project Location : Buenavista, Agusan Del Norte

Primary Role : Project Management that includes preparation of the Owner’s Project Specification covering the design concept of the biomass power plant, handling of bid proposal from EPCC / Turnkey Contractor for the biomass power plant and liaising with government agencies for the required statutory requirement for the biomass power plant.

II) From May 2009 up to Aug 11, 2014:

Company : Atlantic Projects Company Pte Ltd

Address : 18 Trade Hub 21, #05-124, Boon Lay Way

Page 5 of 11

Singapore 609966

Position : Deputy Site Manager (SPT Project) / Quality Manager Primary Role : Project Management / Management of Company QMS PROJECTS INVOLVEMENT

A. June 01, 2013 to Feb. 28, 2014

Project Assignment: RAS AL-KHAIR 2400MW GAS POWER PLANT, KSA Project Location: RAS AL-KHAIR, Kingdom of Saudi Arabia Function: I was assigned as Quality Consultant (Owner side) Main Contractor: Shandong Electric Power Company (SEPCO III) Owner: MA’ADEN Aluminium Company & Saline Water Conversion Corporation (SWCC) Owner Engineer: POYRY

Project Description: RAS AL KHAIR, KSA, 2400MW POWER PLANT PROJECT: Block 10 Simple Cycle - 2 x 200MW SGT6-5000F Siemens Gas turbine, Block 20 Combine Cycle - 2 x 200MW SGT6-5000F Siemens GT + 2 HRSG's + 1 Steam Turbine; Block 30 Combine Cycle - 2 x 200MW SGT6-5000F Siemens GT + 2 HRSG's + 1 Steam Turbine; Block 40 combine Cycle - 2 x 200MW SGT6-5000F Siemens GT + 2 HRSG's + 1 Steam Turbine; Block 50 Combine cycle - 2 x 200MW SGT6-5000F Siemens GT + 2 HRSG's + 1 Steam Turbine; Block 60 Combine cycle - 2 x 200MW SGT6-5000F Siemens GT + 2 HRSG's + 1 Steam Turbine.

Notes: Part of the steam generated from the Combine Cycle Power Plant will be supplied to the nearby Desalination Plant (by other Contractor).

Duties and Responsibilities:

Providing guidance and expert advice to the Main Contractor (SEPCO III) in all matters relating to Quality on the Power Plant and in particular with the compilation, presentation and handover of all Quality Records, Documents, Test Packs etc., to the Client's Engineer (POYRY) & Owner (SWCC). My role is primarily that of a senior advisor / consultant with responsibility for overall oversight of SEPCO III Quality Dept. to ensure compliance with contract QA specification & requirements. Assist, advice and provide assistance to SEPCO III to expedite the completion of the project to the required quality standard. Review Turn over Packages documentation prior to submission to the Owner Engineer (POYRY) for review and approval. This will include As-built drawings, Inspection records, calibration certificates, and compliance of the approved Field Quality Plan. Ensure that Quality inspections are scheduled in a manner that document review and walk downs can coincide and any Punch Lists generated during document review are closed out promptly. Report Quality Progress to APC Site Manager. Report to APC Site Manager any Quality deficiencies observed and recommend improvement plan for him to discuss with SEPCO III higher management. B. May 18, 2009 to May 31, 2013

Project Assignment: ExxonMobil Singapore Parallel Train (SPT) Project – Major Mechanical Equipment Installation.

Project Location: Jurong Island, Singapore

Function: Deputy Site Manager and later part in 2010 was transferred to QA/QC Department as a QA/QC Manager.

Client: Stone & Webster Asia, Inc

Page 6 of 11

Owner: ExxonMobil, Singapore

List of Major Mechanical Equipments – APC Installation Work Two water tube Boilers, 180 tons / hr capacity ; Two Heat Recovery Steam Generator; Two Gas Turbine GE F9E; Three Steam Turbine Driven Compressors; Pumps; Piping; Associated mechanical package / equipment; and Structural steels.

Duties and responsibilities:

As Deputy Site Manager was to assist the Project Manager that includes cost estimates, scheduling & manpower distribution, prepare Method Statements, raised Technical Queries, attend daily progress meeting with ExxonMobil/SHAW.

As a Quality Manager was responsible for Quality Management that includes management of the Company QMS; attend QA/QC meeting with the Client and Owner; qualify welders as per ASME IX; conduct quality audits; prepare WPS/PQR (as per ASME IX) and QA/QC Procedures; maintain and ensure that the implementation of the Project Quality Plan, ITP, and Client / Owner Project Quality requirements is being followed at site and of the whole Quality Department; work & coordinate with ExxonMobil Project Management Team to bring PWHT work & Test Packages backlogs to zero within the target schedule; lead equipment preservation including track record monitoring and report it to Client and ExxonMobil; supervised the video scope internal inspection of pressure vessels & heat exchangers stored for long period of time in recovery area to confirm internal parts are free from any corrosion. Result of the inspection will be forwarded to ExxonMobil. Liaise with Singapore Ministry of Manpower representative for Statutory Inspection. Assist Pre-com / Commissioning works after Mechanical Completion. III)From April 1, 2007 to Feb. 2009:

Company : HKB Holland Ketelbouw BV / Galen Technologies Pte Ltd. (Joint Venture) Address : Ankerkade 6, 5928 PL Venlo-Blerick

Gebouwwnr, 5916, P.O. box 3161

5902 RD Venlo

The Netherland

Telephone : +31-(0-77-387-****

Fax. : +31-(0-77-387-****

Website : www.hkb-ketelbouw.nl

Position : QA/QC Manager & Technical Representative PROJECTS INVOLVEMENT

A. July 16, 2008 to February 02, 2009

Place of assignment: Holland Ketelbouw BV (HKB) Workshop HKB Address: Ankerkade 6, 5928 PL Venlo-Blerick

Gebouwnr, 5916, P.O. box 3161

5902 RD Venlo

The Netherlands

Tel: +31-(0-77-387-****

Fax. +31-(0-77-387-****

Website: www.hkb-ketelbouw.nl

Project Name: BFG-PROJECT-GENT (BFG Pre-heater module) Client: Hitachi Power Europe GmbH

Project Description: Fabrication of BFG Pre-heater module (Consist of module 1, module 2.1, module 2.2 x 2 & module 3)

Page 7 of 11

B. December 2, 2007 up to June 30, 2008.

Place of assignment: SembCorp Utilities UK

Address: Wilton International

Middlesbrough, United Kingdom

Project Name: Boiler Island Project Wilton.

Client: SembCorp Utilities (UK)

Project Description: Erection of 4 x 30 t/h of Steam Boiler Manufactured by Holland Ketelbouw B.V. including associated equipments (1 unit de-aerator, 2 unit blow down tanks, etc) & all civil works. C. August 20, 2007 to December 1, 2007.

Place of assignment: Sumgait Power Station, Azerbaijan Project Name: 1 unit HKB Auxiliary Boiler Erection Work Position: Site Project Manager & Quality Manager.

Client: Siemens AG Power Generation.

Duties and responsibilities:

For Sumgait Power Station as project Manager & Quality Manager, was responsible for the erection/installation of the auxiliary boiler including all quality aspects for the project. Assist Pre-Com / Commissioning works of the Boiler after mechanical completion works. For SembCorp Utilities project as a Quality Manager was responsible for all quality aspects of the project and assist the Project Manager to conduct Safety Orientation course for all personnel entering site to make them aware about the safety rules & requirements at site. For the BFG-GENT Project as a technical representative was responsible for inspection and joint inspection with the Client inspector of fabricated items before dispatch to the site. Prepare ITP’s and quality documents for submission to the Client representative for review and acceptance. IV) From April 23, 1996 to March 31, 2007:

Company : JURONG Engineering Limited and its group of Companies Address : 25 Tanjong Kling Road, Jurong Town, Singapore 628050 P.O. box 175, Singapore 916106

Company Certification : ISO 9001, ISO 14000, and ASME “U”, “U2”, “PP”, “S”, “A” stamps. Position : Senior QA/QC Engineer & Senior Mechanical/Piping Engineer PROJECTS INVOLVEMENT

A. From September 26, to October 20, 2006.

Project Name: Kappar Power Station, Boiler # 5 Superheater inlet header and Super heater element tubes repair work

Address: Kappar, Malaysia

B. From August 2006 to September 10, 2006.

Project Name: Assigned to “ The PolyOlefin Company (TPC) Shutdown Maintenance Work 2006 for PE plant in Jurong Island, Singapore.

C. From June 2006 to July 2006.

Project Name: SembCorp Utilities – Cogeneration Plant HRSG – 11 HP drum level control valve piping Modification work in Jurong Island Singapore.

D. From August 2005 to May 2006.

Project Name: SembCorp Utilities – Seraya Plant Expansion Project in Jurong Island, Singapore.

Project consist of the following: Installation of 2 units of steam boilers (free issue by the client). Page 8 of 11

Installation of associated piping (Steam Line, Natural gas, HGIW line, Demin. water line, Diesel pipe line, Plan/Instrument air line, Fire water line). C & I and Electrical installation, Boiler water feed pumps, pipe rack, and civil foundations installation. Installation of other associated equipment. E. From October 2003 to March 2005.

Project Name: Repair & upgrading of SUT (SembCorp Utilities) Boilers SK1, SK2 and MHI – 3,4,5 at SUT Sakra in Jurong Island, Singapore.

F. From June 2003 to September 2003.

Project Name: Assigned to “ The PolyOlefin Company (TPC) Shutdown Maintenance Work for PE plant in Jurong Island, Singapore.

G. From October 2002 to May 2003.

ER’s maintenance work are the following: ER-285/288 installation of service & maintenance platform; ER- HGIW installation of alternative high grade industrial water supply to Chevron (FRP pipe line); ER-192/208 installation of FRP pipe line; IB-53 Installation of tank FRP cover (Approx. 10 x 10 M size); ER-253 Installation of service and maintenance platform.

H. From July 2002 to September 2002.

Project Name: Repair, re-installation and commissioning works for 2 units of Gas turbine – Frame 5 & frame 6 for Myanma Electric Power Enterprise in Myanmar. I. From January 2002 to April 2002.

Project Name: Sultan Salahuddin Power Station in Kappar Malaysia.

- Repair of water pipe line for coal Stacker/Reclaimer; Manpower scheduling and Cost Estimates for Gas Turbine – frame 9 enclosure modification. J. From October 28, 1998 to November 2001.

Project Name: Kuala Lumpur International Airport Cogeneration Plant Operation and Maintenance contract for the 2 x GE LM2500 gas turbine, HRSGs, and associated equipment. Owner: PETRONAS GAS DISTRICT COOLING

K. From February 15, 1998 to October 10, 1998.

Project Name: 3xSUT 140 t/h Boiler package unit’s fabrication and erection works in Jurong Island, Singapore.

L. From September 16, 1997 to January 31, 1998.

Project Name: PICOP chemical recovery boiler (water tube type) re-tubing works. Address: Bislig, Surigao del Sur, Philippines

M. From April 23, 1996 to September 14, 1997.

Project Name: Kuala Lumpur International Airport Cogeneration Plant Project Project consist of the following: Installation of 2 units of Gas Turbine GE LM 2500; Installation of 2 units Heat Recovery steam generator; Installation of associated piping, pipe racks & Gas turbine accessories & Auxiliaries.

Owner: PETRONAS GAS DISTRICT COOLING

Address: Sepang, Selangor, Malaysia.

Duties and responsibilities:

Duties and responsibilities:

As a Senior QA/QC Engineer includes Preparation of JEL Maintenance division Quality Manual as per ISO 9001:2001 in preparation for the application for ISO 9001:2001 certification. For this task, the Company appointed me as Management Representative to maintain and control the Quality Manual and directly reporting to JEL QA Manager and to liaise with the Third Party to review/audit and assess the Quality Manual correspond to our Company System if we are ready for ISO 9001:2001 Certification. Prepare Quality Procedures; maintain and control NCR’s, Qualify welders; Quality inspection at site; review radiographs; schedule PWHT of pipe line welds; documentation works, and attend periodical Quality Audits. Page 9 of 11

Liaise with Client Inspector for joint inspection and acceptance of the inspection items. Liaise with the Ministry of Manpower representative for statutory inspection. As a Senior Mechanical/piping engineer includes Tendering/quotation & cost/labour/equipment/ material estimates of incoming projects; supervised erection/installation of equipment; supervised shutdown works; manpower planning and distribution; scheduling; assist vendor for installation and commissioning works including operation and maintenance of Gas Turbines and associated equipment. Attend commissioning work with IHI/vendor and test run operation and maintenance of the GE LM2500 GT (2 units) installed in Kuala Lumpur International Airport, Malaysia. Operation and maintenance engineer with the following: Assist IHI for the operation and maintenance of 2xLM2500 GE Gas turbine; supervision of heat recovery steam generator guillotine damper installation; assist IHI for Gas turbine periodical inspection (bore scope inspection, control system inspection, inlet/outlet duct inspection, etc.); assist IHI during Gas turbine Hot Gas path section repair interval (HSRI) at 26,000 hrs operation.

Company technical representative with JEL / ABB-USA joint venture for the Chemical Recovery Boiler Rehabilitation works (replacement of S/H tubes, bank tubes, economizer tubes/headers, and associated parts). Supervise installation & erection works, I was authorized by ABB-USA to conduct dye penetrant, testing on boiler steam/water drum tube to tube sheet seal welding and some other joints on super heater tubes & steam header; work scheduling and manpower distribution; assist commissioning works with ABB- USA, and Documentation work.

Supervised re-installation work of re-furbished rotor, installation of 1st/2nd/3rd turbine rotor blades/shroud blocks/nozzles, installation of lower half bearings, rotor installation, installation of combustion cans/transition pieces and others until final closure of the upper half casing); conduct commissioning works; attend progress meeting with the client; work scheduling; inspection and supervision of safety at site for Myanma Electric Power Enterprise in Myanmar - Repair, re-installation and commissioning works for 2 units of Gas turbine Inspection and supervision of pipe lines installation including structural supports. V) From May 15, 1995 to April 11, 1996:

Company : A. De Vera Corporation

Address : 4th floor, Vernida I, Amorsolo Street,

Makati, Metro Manila, Philippines.

Company Certification : ASME “A”, “PP”, “S”, “U” and “U2” stamps. Position : QA/QC Head

Duties and responsibilities:

Management of the Company Quality Manual; keeper of the ASME stamps; lead the ASME Certification Renewal Audit during the 3 Days audit by ASME Designee/AI/AIS at A. De Vera work shop including the review of the Quality Manual by the ASME Designee. The result of the Audit was successful and ASME Certification Renewal passed. Prepare QC procedures (WPS, PQR, etc.); supervised welders qualification test; Prepare quality control plan / ITP’s; Delegate quality works with quality supervisors/inspectors; review of radiographs. Lead projects documentation works.

VI) From March 15, 1993 to February 22, 1995:

Company : Philippine Hitachi Plant Co. Ltd.

Address : Tuscan building, 2nd floor Herrera street, Legaspi village, Makati Metro Manila, Philippines. Company Description : Electro-mechanical works for industrial and commercial buildings. Position : Project Engineer.

Duties and responsibilities:

Page 10 of 11

Material & cost estimates; designs; scheduling; Inspection at site (ROHM Electronics project); liaise with client representative about the progress and schedules of the project (ROHM Electronic project) and joint inspection

& acceptance; Prepare QA/QC procedures (ROHM Electronics project); documentation work (ROHM Electronics project); implement safety measures during construction and erection phase; implement project specification; Pre-Com / Commissioning works.

VII) From April 23, 1989 to October 14, 1992:

Company : BELLELI Saudi Heavy Industries Ltd.

Address : P.O. Box 10138, Jubail Industrial City 31961 Kingdom of Saudi Arabia.

Company Job Description: Fabrication & Installation of pressure vessels, structural steels, oil & gas platforms and Jackets (on-shore / off-shore), oil refineries, desalination plants, oil storage tanks, heat Exchangers, air coolers, reactors and other associated steels.

ASME Certificate Holder of “A”, “PP”, “S”, “U”, “U2” stamps. Certificate Holder of API 2B. Position : QC Engineer to Project Quality Inspector PROJECTS INVOLVEMENT

A. From April 1989 to October 1990.

Project Name: On-shore and Off-shore for riser treatment (consist of 14 Huge offshore modules and bridge) for Qatar General Petroleum Company (Q.G.P.C.) North field Development Project. Duties and responsibilities:

On-shore (Al-Jubail, K.S.A.): My assignment was to cover piping fabrication including inspection, pipe heat treatment, and record weekly progress of NDT, releasing fabricated spools to module yard for erection and documentation work.

Off-shore (Qatar North field in the Gulf): I was assigned in dimensional inspection, material inspection, prepare As-Built drawings and documentation work.

B. From October 1990 to August 1991.

B.1 Project Name: Aramco – increase Yanbu Crude Export Capacity Project. Consist of: 16 Jackets, 18 decks, 14 pipe way trestle, Bridges, Piping, Supports & sleeves. B.2 Project name: Aramco – increase Yanbu Export Capacity Project. Consist of: One (1) heavy crude storage tank (Double deck floating roof) with a capacity of 197,000 cubic metres and 107 metres diameter, 22 metres height. Duties and responsibilities:

I was in documentation department to prepare final dossier. Later was asked to transfer to Inspection Department where I was upgraded to Quality Control Project Inspector with the responsibility of coordinating fabrication group & erection group; attend internal weekly meeting; prepare QA/QC procedures; raising non-conformity reports; records weekly status and fabrication inspection at site; liaise with the client inspector/representative for joint inspection & acceptance; in-charge of releasing pre- fabricated materials for shipment to the project site; record daily activities and fabrication inspection. C. From August 1991 to October 14, 1992.

C.1 Project Name: RAS-ABU Fontas, Qatar Project

Consist of: Fabrication of two units of evaporator (each has 17 stages), and Fabrication of two units brine heater and two units De-aerator.

C.2 Project Name: RABIGH desalination plant project Page 11 of 11

Consist of: Fabrication of one unit of evaporator (has 21 stages, 4,235 cubic metres per day capacity), and Fabrication of one brine heater and steel structures. C.3 Project Name: Medina-Yanbu Desalination Project. Consist of: Fabrication of four units of evaporator (each has 21 stages), Fabrication of four brine heaters, Fabrication of four De-Aerators, Fabrication of Fuel oil line heaters and closed feed water heaters, and Fabrication of Piping and water boxes. C.4 Project Name: Bahrain National Gas Company Project. Consist of: Fabrication of one unit propane condenser tube bundle (air cooler). C.5 Project Name: Saudi Iron and Steel Company Project. Consist of: Fabrication of main box girders of two overhead crane – each 20 tons capacity. Duties and responsibilities for “ C.1 to C.5”.

I was assigned as QC project inspector with the following: Prepare Inspection Test Plan; fabrication Inspection; release finished items to job site; liaise with the client inspector/representative for joint inspection & acceptance; prepare QA/QC procedures, and documentation work. VIII) From November 1987 to October 1988.

Company : Atlantic Gulf and Pacific (AG&P) Metals Fabrication Group. Address : San Roque, Bauan, Batangas, Philippines. Position : From Cadet Engineer

EXMINATION TAKEN AFTER COLLEGE GRADUATION

Mechanical Engineer licensure examination given by the Board of Professional Regulation Commission (PRC), Manila, Philippines last April 1988 (3 days)

Result: Passed

Overall rating: 81.4 %

Mechanical Engineer licence no.: 0038077

Mechanical Engineer Licence registration date: 5 December 1988 The above information are prepared by:

Ernesto L. Fabros

Updated: 01 August 2020

- - - - - E N D - - - - - -