SAMIR ALAM
Permanent Address
VILL+POST- SALEHPUR
PS- BISHAMBHAPUR,
DIST- GOPALGANJ.
STATE – BIHAR 841501 (INDIA)
MOB- +919*********(IND) / 059*******(KSA)
Email Id: adh02q@r.postjobfree.com
POST APPLIED FOR :- “ Mechanical Engineer ”
TOTAL EXP. -: 4 YEARS
GULF EXP. :- 2 YEARS ; IND EXP. :- 2 YEARS
CARRIER OBJECTIVE:
To pursue a challenging opportunity and a position in dynamic and well reputed organization that offers good opportunities and challenging work environment in return would help me in building my knowledge, experience and academic capabilities.
PROFESSIONAL SHUTDOWN EXPERIENCE:-
A Job Responsibility in shutdown associated work With Heat Exchanger, Vessels, Heater, Fin-Fan, Piping, Valve maintenance & MOC jobs,
Company : Gopinath Engineering Co. Pvt. Ltd.
Client : BPCL Mumbai (Maharashtra)
Project : Loop (TA Shut Down)
Designation : Mechanical Engineer
Duration : 10 March 2018 to 12 May 2018
Company : knoc Door Services Pvt. Ltd.
Client : IOCL Brauni Refinery
Project : AVU-1 Shut Down
Designation : Mechanical Engineer
Duration : 02 June 2018 to 15 July 2018
Company : Aarviencon Pvt. Ltd.
Client : cairn India Limited( Barmer)
Project : HGU (TA Shut Down)
Designation : Mechanical Engineer
Duration : 01 Aug 2018 to 12 Oct 2018
TOTAL SHUTDOWN EXP. : 5 MONTHS
CURRICULUM – VITAE
Plant Shut down Activities:
Executions jobs on heat exchanger.
All necessary jobs for draining, steaming out of exchanger.
Heat Exchanger dismantling of components, tube bundle pulling out from shell.
Cleaning & inspection assistance of exchanger components, vessels.
Planning and coordinating with main clients and sub-contractors for materials required.
Dealing with exact tools and tackles and skilled man power according to job related.
Generally looking for the quality of jobs and coordination with the clients.
Maintenance of static equipment’s such as columns and vessels.
Columns Maintenance steps : Blinding/ steaming/ water washing /final blinding’s and man hole opening/ gas test and exhaust fan installation/ lightening/ tray man, way opening / pre inspection (insp
/production process department) /cleaning /other hot and cold job and repairs if any /inspection for clearance of box up/ tray man way box up / man hole box up / de blinding’s.
Vessels Maintenance steps : blinding/steaming/water washing/ final blinding’s and man hole opening/ gas test,light and fan installation/ pre inspection/ cleaning / demister removal (if any) / hydro jetting(if required) /post cleaning inspection / repair & hot job if any/ man hole box up / hydro test (if required)/ DE blinding.
All Types of valve (Gate Valve, Globe Valve, Check Valve, Control Valve) etc.
Heat Exchanger dismantling of components, tube bundle pulling out from shell.
Ensure that the safety management program on department’s safety objectives is strictly followed and action is taken against defaulters to prevent recurrence.
Conduct frequent audits and document the outcomes to verify that enough efforts have been put in the areas of productivity, safety and quality. Selection and Issue of require materials as per the Drawing and codes. MOC job has to be executed as per ISOMATRIC & P&ID drawing.
Routine maintenance activities of static equipment are like Heat Exchangers, Vessels & associated piping.
Exposure to Permit to work system & of safety inspection & implementation of safety plans / procedure of the Organization.
Maintain & Repair Mechanical equipment (Static &Rotary equipment such as Heat Exchanger, Vessel/Tank, n, Pumps, Gearboxes and Valves). (Maintenance). Colum PROJECT WORK EXPERIENCE:-
1 Name of the company : Saudi Services For Electro Mechanical works Co. Ltd. Designation : MECHANICAL SUPERVISOR
Duration : 28 .02.2019 To Till Now
Clint : ARAMCO SAUDI ARABIA( KSA)
Project : YANBU DISTRIBUTION HUB
: YDH – CMEI – PACKAGE
2 Name of the Company : Excellent Project (I) Pvt. Ltd. Designation Designation : Piping Supervisor
Duration : 02.01.2017 to 25.02.2018
Clint : Reliance Refinery Jamnagar
Project : J3 Jamnagar
3 Name of the Company : Gopinath Engineering Co. Pvt. Ltd. Designation : Piping Supervisor
Duration : 05.01.2016 to 28.12.2016
Clint : BPCL Mumbai
TOTAL PROJECT WORK EXP. : 3 YEARS, 4 MONTHS
JOB RESPONSIBILITIES:-
Work with materials such as CS, LTCS, SS, Alloy Steel.
All pipe line drawing & Isometric drawing measurement according to Fabrication & erection actual knowledge.
Surveying according to pipe laying actual knowledge
All material fixing according to drawing, Elbow (long radius & short Radius) Flange (slip-on flange, orifice flange & blind flange) Reducer (Concentric & Eccentric) Valves (Gate valve, Control valve, Globe valve, Check valve, Butter fly valve, Ball valve etc) .
Supervising work on the fabrication, erection / Laying of pipe lines as per drawing / location along modification.
Planning and execution of projects to ensure maximum productivity within
Optimum quality and in a safe Plan and organize, including generation of programmers. Follow-up and optimum resource utilization, Control and monitoring of departments man-hour expenditure including indirect hours, overtimes and days off to workers.
Inspection of fit up and weld visual.
Familiar with PMI, hardness, PWHT test etc.
Review of WPS and PQR as per project specification.
Reviewing filler wire and electrode of welding procedure specification.
Inspection welding pre heated post weld heat treatment of weld.
Plan daily and five weekly supervisory and manpower distribution. Coordinate and liaise with Ship Repair Managers, Ship Superintendents and other trades, ensuring smooth workflow on projects.
Provide back up to the Sr. Foreman for managing and handling projects including Objectives are strictly followed and action is taken against defaulters to prevent recurrence.
Ensure that all work is carried out to the required quality in the best possible Manner and within the guidelines of industry’s best engineering practices.
Conduct frequent audits and document the outcomes to verify that enough efforts have been put in the areas of productivity, safety and quality. Stop processes if they do not meet specified requirements, raise occurrence Report, develop corrective and preventive action and ensure that rework is carried out to customer satisfaction.
Motivate, direct, align and guide the team for best performance, monitor FABRICATION:
Handled medium sized workshop comprising of all machining and fabrication facilities for the fabrication of Static equipment’s, Steel Structures and Piping. Main duties were,
Deployment of appropriate technicians for the jobs
Preparation of job cards for welders, fitters, fabricators and machinists as per the job priority
Preparation of shop drawings and explaining the same to technicians, Educational Qualifications:
B. Tech in Mechanical Engineering, Passed from Maharishi Dayanand University Rohtak (2016),
B.S.E.B. Patna 12Th passed From 2011,
S.S.E - B.S.E.B. Patna 10Th Passed From 2009,
NDT LEVEL II Complete 2016,
Computer Skills:
Operating System: window 10, XP, 2003, MS Dos.
MS Office 2007 (Excel, Word & Power Point, paint )
Adobe Photoshop 7.0
Personal Details:
Passport No. : N 7946752
Date of Issue : 04.02.2016
Place of Issue : Patna
Date of Expiry : 03.02.2026
Remark:
Check of work permit before work.
Every day permit checking all activity mention in the permit & signature of client safety officer. Department engineer.
Company safety officer & site engineer signature Attributes
Hard working and disciplined
Very flexible in team work.
Quick in learning new thing
Confident.
Dedicated & innovative.
Honest, punctuality
Hobbies
Enthusiastic Book Reading
Playing & Watching Cricket
Visit Interesting Places
Declaration
I do hereby declare that all the statements as mentioned above are true to best of my knowledge and belief.
I am very grateful for reviewing my CV and I am very grateful if you will call for interview.With best regards
Thank you.
Place: -SAUDI ARABIA
Date: - ( SAMIR ALAM )