Post Job Free

Resume

Sign in

Engineer Engineering

Location:
Mumbai, Maharashtra, India
Posted:
October 15, 2020

Contact this candidate

Resume:

Amit Arjun Gaud

adgzu5@r.postjobfree.com

882-***-****

CAREER OBJECTIVE

Work and learn that contribute best for the growth of the organization by continue developing and sharing my skill ability of an accomplished assembly process planning engineer, professional with 4 years of progressive experience and expertise on New product development, Lean tools, Time study and WCM methods, Line balancing, Ergonomics, Basic MOST, Capacity planning, Overseas customer relationship management. SKILLS

Industrial Engineering Techniques Basic MOST, MTM UAS, 3M’S (MUDI, MURA, MURI), Golden and strike Zone analysis, PFEP, Safety Risk Assessment, Safety Risk Prediction, PFMEA, Value

Stream Mapping, Six Sigma Methodologies, 5s, Kaizen. PLM Software Teamcentre Vis Professional, CATIA V5, AutoCAD 2D EXPERIENCE

Mar 2019 to Feb 2020 Onwards Technology Pvt Ltd

Industrial Engineer Project : John Deere (Davenport,Iowa) Project Scope : Work Place Integration for John Deere Utility Loader using WCM standards.

In plant support for execution and commissioning of 5E series Tractor at John Deere Pune.

Line side support for EPDP (Enterprise Product Delivery Process) of K and L Model Utility Loaders for John Deere.

Preparation of GSOE (Graphical Sequence of events)

& SOE (Sequence of events) using Creo view and

Team-center visualization professional.

Setting up Standard Time for the operations

performed by the operators using MTM (Methods Time Measurement).

Creating OMS (Operator Methods Sheet)/ Visual aids using Creo view.

MBOM (Manufacturing Bill of Materials) validation for ECN (Engineering Change Order) applicable to assembly line using PTC Wind-chill.

Identifying the bottle neck stations of assembly line and distributing the work content among the operators/ stations in balancing the assembly line for achieving the daily targets as per TAKT

time.

Fixture validation for Sub-assemblies of K, L series Model John Deere Utility loader using Team-center

visualization professional .

ETN (Engineering Top Number) analysis to verify

interference check, Mating parts, Tool accessibility using Team-Center visualization professional .

Supporting Audits for SOE and MTM Time elements

for LPB (Limited Production Build) & SOP (Start of production) and Post Production.

Ergonomic analysis (Muri) using Jack in Team-center visualization mockup.

Creation of assembly process animations to support VB (Virtual build) using Dassaultsystems 3D technical communication software 3DVIA.

Jun 2017 to Feb 2019 Caresoft Global Pvt Ltd

Industrial Engineer Project : CNHI

Project Scope : Work Place Integration in CNHI mexico Plant for Mid Range Tractors using WCM standards.

Designing and supporting the implementation of flexible and balanced manufacturing process by establishing Standard Times using Basic MOST (Maynard Operation Sequence Technique) to CNHi Grand island

Preparing GSOE (Graphical Sequence of Events) with MBOM (Manufacturing Bill of Materials) for different variant’s Tractor and Combiners using Team-center

visualization.

Preparing SOE (Sequence of Events) with PTF (Parts, Tool’s and Fixtures) for different models and variants.

Creating SOP (Standard Operator Procedures) using Team-center visualization.

Preparing Man-machine charts (worker and machine process chart) to detect the operator idle time’s and machine idle time’s and optimize the work distribution between Men and Machines.

Conducting PEAT (Preliminary Ergonomics Assessment Tool) analysis for operations performed by operators.

Conducting MUDA analysis identifying the 07 wastages in process and suggesting Kaizen’s.

SPS (Statistical Problem Solving) with 07 Quality Control tools to review quality issues and identifying opportunities for cost savings and generate continuous improvement ideas i.e. Kaizen’s.

Conducting Material and Logistics planning PFEP

(Plant for Every Part) for part requirements and pick lists when new ECN (Engineering Change Number) are applied to assembly line.

Experience in detailed Workplace Organization

Analysis with a focus on 5’S, Spaghetti Analysis, Layout Optimization.

Conducting PFMEA (Process Failure Mode Effects

Analysis) in assessing the impact of failure modes

(Severity), Assessing the chance of a Failure happening

(Occurrence) and Assessing the chance of a failure being detected (Detection).

Conducting Safety Risk Analysis in evaluating the potential risks that may be involved in a process, and Safety Risk Predictions in predicting the potential risks that might be involved in a process.

Jun 2016 to Jun 2017 Caresoft Global Pvt Ltd

Graduate Engineer Trainee Project : CNHI (Grand Island, Nebraska) Project Scope : Define Assembly process for MY16 -17 CNHI Flagship Combiner.

Trained on Basic MOST for Time study.

Trained on using Siemens Team-center Professional and SAP software’s for Standard Operating Procedure.

Trained on basics of MTM -1.

Implementation of 5’S Process for CNHi Racine Plant. Apr 2016 to Jun 2016 Triveni Industry

Planning Engineer Project : Manufacturing of Fuel Tank for Nirbaya Missile

(ADE).

Job role :Worked on Project NIRBHAY MISSILE(India's First Long range subsonic cruise missile) & RUSTOM 2 Drone.

Key Roles & Responsibility:

• Worked as a Planning Engineer, Quality Inspection of Metal and FRP(Fabric reinforced polymer)

components.

• To plan how the component is going to be

manufacture.

• To plan which components is to be used.

• To plan how the process of component should be

completed.

• To complete the project within time limit.

• Perform NDT testing of Fuel Tank metal parts.

PROJECTS

Project Name : Automatic Two Wheeler Side Stand

Role : Design Team Size : 4 Project Duration : 3 Month Project Detail • Developed and built a Two wheeler side stand which automatically retracts to its original position when the

bike comes in riding position & the Ignition is turned ON.

• It consisted of IR leds in which Transmitor used to transmit ray when ignition is turned ON & when the

bike comes to riding position the rays used to reflect back after hitting the ground and use to receive by the

receiving Led, resulting in completion of electric circuit.

• After completion of electric circuit 12v dc motor used to turn On, moving the Bike stand to its original

position.

Project Name : BHEL Haridwar

Role : Intern at Bharat Heavy

Electrical Limited (BHEL)

Team Size : 3 Project Duration : 1 Month

Project Detail Internship

EDUCATION

Degree/Course Institute/

College

University/

Board

Percentage/

CGPA Year of Passing

Mechanical

Engineering

Dronas College

of Management

And Technical

Education

Uttarakhand

Technical

University

61% 2015

HSC Lord's Universal

College

Maharashtra

State Board 56% 2011

SSC St Paul's High

Scholl

Maharashtra

State Board 76% 2009

ACHIEVEMENT

Star of Project

Mexico

• Optimised Cycle time for after paint assembly line by 13%.

• In SRA, 35 very high risk activities were optimised to medium & low risk activities.

• 61% on NVA reduction by suggesting improved Layout

& introducing to new Carts.

HOBBIES

Playing Football

Cooking Food

PERSONAL DETAILS

Address C--703, Dharti Presidio, Jankalyan Nagar, Malad (W), Mumbai 400095

Date of Birth 28/12/1993

Gender Male

Nationality India

Marital Status Unmarried

Language Know English, Hindi

DECLARATION

I do hereby declare that the above given statements are true and correct to the best of my knowledge.

Amit Arjun Gaud



Contact this candidate