Post Job Free

Resume

Sign in

Engineer Construction

Location:
Al Dafna, Qatar
Salary:
13000
Posted:
October 15, 2020

Contact this candidate

Resume:

Page * of *

BIO-DATA

Name: Yasar Irfat

Father’s Name: Muhammad Nawaz

Date of Birth: 03-12-1983

Nationality: Pakistani

Address: Mohallah Mehman Hellan road Phalia near NBP Teh. Phalia Distt.Mandi Bahudin.

Phone No. +974-******** / +974-******** / +92-300******* Email: adgznc@r.postjobfree.com

Language: English, Urdu, Hindi, Punjabi

Summary

15 years Postgraduate Experience of supervision of buildings, Roads, Precast and earth work with Digital Surveying and Mapping Branch, Technical Services Supervision, Details, Drawings Civil and Surveying works and EPC Companies in the Field of Petrochemical, Refinery, Oil (Covering all Construction Activities & Familiarity with International Standards. Excellent Management & Communication with leadership, Problem Solving, Negotiation, and Team Building Skills.

ACADEMIC QUALIFICATION:

Metric (with Science) in 1999

3 Year Diploma of Associate Engineer in Civil Technology in 1999-2002.

Auto cad

Microsoft Office

PROFESSIONAL EXPERIENCE

REDCO INTERNATIONAL W.L.L. QATAR

1. Project ( HIA Switch box and metro station ) (15 JAN 2017 TO Present) Designation. Senior Surveyor

Responsibilities,

Layout, supervision and as built of structure and MEP work Layout of piling, raft slab, lining wall, plate form slab, internal walls, stairs, roof slabs, air ducting, fire fighting pipes, cable try, smoke detector, and etc. according to drawings. And taking as built of structure and MEP work and prepare the data sheet and hand over to QAQC section.

Also did job at Economic Zone uqba bin nafe, Ras Bu Fantas, QNM, Souq Waqif, Landscaping project of Qatar Rail layout and as built of kerb stone interlock security and light bollards etc.

```

adgznc@r.postjobfree.com

Page 2 of 4

Instrument using. Total station Leica TS09, TS06, TS06plus, and automatic level machine.

REDCO INTERNATIONAL W.L.L.

2. Project (Ashghal Boundary wall Industrial area 52) (NOV 2015 to DEC 2016) Designation. Senior Surveyor

Responsibilities,

Layout, Supervision, and taking as built of excavation, blinding concrete, precast footings, Precast beams, precast columns, and wall panels.

Instrument using. Total station Leica TS09, TS06, TS06 plus, and automatic level machine. REDCO INTERNATIONAL W.L.L. QATAR

3. Project (NEW ORBITAL HIGHWAY PHASE 2) (NOH2) (FEB 2015 to NOV 2015) Working as a SITE SUPERVISOR with QDVC & BIN OMRAN joint venture. A project of road construction 47km with 7 tracks lines Saudi road to Alkhor road. Responsibilities,

Supervised the road work excavation and back filling layer by layer up to required level. Supervised the crusher work of back filling material and take progress. Supervised the excavation work of under pass and culverts. tunnels. Checking transportation of back filling and disposal material. Supervised the underground services pipe lines.

Supervised the excavation and back filling machines like as a bulldozer, grader, roller compactor, dump trucks, excavator,loader should be in good position for a good work Progress.

Prepared the progress report and report to our seniors. Explain to foreman for target and important work . Follow the safety rules.

REDCO INTERNATIONAL W.L.L. QATAR

4. Project (Lusail RAIL Transit System) (JULY 2013 TO DEC 2014) Working as a SENIOR SITE ENGINEER

Working in Lusail city the project of Lusail rail transit system with Qatari diyar and vency company .

Excavation for metro stations and underground tunnels. Backfilling for metro stations and underground tunnels. Backfilling of road construction layer by layer.

All excavation work according to drawing .

prepare the progress report .

Check the hard rock and survey .

Look after the excavation machine like as a excavator, loader, bobcat,roller,grader, and jack hammer.

Look after the transportation of dump trucks and tippers. Follow the safety rules.

REDCO INTERNATIONAL W.L.L. QATAR

5. Project (Banana Island Village resort) (JUNE 2012 TO JUNE 2013) Working as a Senior Surveyor

A Project of village resort

Responsibilities,

Layout, supervision and as built excavation, blinding concrete and precast work Erection of precast element like as a beam, column, wall panel, hollow core slabs and solid Slabs for villas, hotels, back of house, family entertainment, family units, kids club, surfer Pool, wellness centre, lookout centre, water villas. for these buildings. Page 3 of 4

Instrument using. Total station Leica TS09, TS06, TS06 plus, Leica builder 503 and Automatic level.

REDCO INTERNATIONAL W.L.L. QATAR

6. Project QATAR AIRWAYS CREW ACCOMODATION) (JULY 2011 TO APRIL 2012) Designation. Senior Surveyor

Responsibilities,

Layout, supervision and as built of structure and MEP work Layout of piling, raft slab, form slab, internal walls, stairs, roof slabs, air ducting, fire fighting pipes, cable try, smoke detector, and etc. according to drawings. And taking as built of structure and MEP work and prepare the data sheet and hand over to QAQC section.

Instrument using. Total station Leica TS09, TS06, 06 plus, and automatic level machine 7. LNG PLNG Tanks Project Angola Soyo (AFRICA) (March 2009 to March 2011) Working with M/S NIEC Namkwang International Engineering & Construction LDA. As QAQC Survey Engineer

Responsible of the Site Surveying Supervision for:

CIVIL WORK

Excavations and backfilling

Construction of (Tanks & Equipment Foundations-Pipe Racks)

As-Built (Foundations-Anchor Bolts)

Building (Substations-Control Room -Warehouse...).

Underground systems, (Installation of Pipes and Construction of Electrical Trenches, Pits, Sumps, Manholes, etc.

EQUIPMENTS WORK

Shims Plate Elevation -Verticality-Alignment

installation of embedded anchor plates for piping support stair case cable way hand rail etc.

On the wall doom roof.

TECHNICAL OFFICE WORK

Conducts site investigations; takes measurements and produces detailed sketches, in preparation 8. Housing scheme for Dubai police force and army office at Alquos4th Dubai

(March 2008 to Feb. 2009)

Worked with M/S Group five Construction UK Ltd as a Site Engineer Supervised the structure work of 11th story building Supervised the all construction work according to drawing Following the safety roles

Supervised and control the quality of construction Control wastage of material at site

Prepare the progress report and report to our seniors. Supervised and checking the form work rebar’s work shuttering work and scaffolding according to drawing

Erection of precast stair and roof slabs.

Submit the IR to QACA department for inspection.

9. Balloki 225 MW CCPP (July2 2007 to march22 2008) Worked with M/S Habib Rafiq PVT Ltd as Assistant Engineer+surveyor Major Responsibilities

Layout and supervised the foundation of gas turbine construction and gas turbine HRSG 1 stream turbine pilings foundation

Layout and Supervised main office building and excavation and control the structure work rebar work form work of columns beams and roof slab according to drawing Layout and supervised the switch gear control room and control the quality of construction excavation foundation and waterproofing and earthling. Layout and Supervise the excavation work and backfilling work and road work. Layout and Supervised the cooling tower and water storage tank sewerage work and Page 4 of 4

Control wastage of material at site

Submit the IR to qaqc department for inspection.

Prepare the progress report and report to our seniors. Layout and Supervised the all construction work according to drawing 10. Bahria Town phase 8 Islamabad (August 2006 to July 2007) Worked with M/S Habib Rafiq PVT. Ltd as Assistant Engineer + Surveyor. A project of infra structure

Major Responsibilities

Layout and Supervised and construct the retaining walls. Construct the sewage pipe lines.

Excavation layout and back filling for road construction Conducted topographical survey, layout

Layout and Supervised installation of sheet pipes, crane track rails, cable ducts, bore pile and other services.

Layout of main office building masonry work plaster work finishing work tile work paint work roof treatment trap work plumbing work flooring work Prepared the underground water tank and sewerage work and water supply. Prepared and supervised the culverts and drainage system. 11. Safari villas and Meadows Sector B Lahore (August 2005 to August 2006) Worked with M/S Bahria town PVT Ltd as Site Supervisor/ Surveyor. A housing project

Major Responsibilities

Layout of building structure

Prepared the daily progress report

Prepared the bill of sub-contractors and man power report Use the survey instruments like Level Theodolite Total station. Supervised the building structure work.

Supervised the finishing work tile plaster paint doors windows glasses 12. Qureshi Builders pvt.Ltd (August2003 to August2005) Worked with M/S Qureshi Builders Pvt.Ltd as Surveyor/Site Supervisor. Objectives Construction of I section girders plants and slabs in Qureshi builders Main site of pre cost and pre stressed concrete roofs Supervised and control the quality of construction. Lay out of building construction.

Prepare the daily progress report.

Control the wastage of material at site.

Prepare the bill of sub-contractor and man power report. Use the survey instrument like level theodolite and total station. Supervised the pre cost and pre stressing structure according to design. Make the design of pre cost roofs according to load chart. Check the quality of concrete.

Check the quality of coarse aggregate and fine aggregate sieve analysis.



Contact this candidate