S.MUSTHAFA

: +974-****-**** (Qatar) & +91-967*******(India)

: adgyv9@r.postjobfree.com & Skype id: sirajmusthafa A result-oriented professional, accustomed with overall functioning of Project Management, seeking assignments in Turnkey & EPIC - Project Management / Operations & Maintenance / Facility Management PROFILE SNAPSHOT:

B.Tech (Electrical), PGDOM (Operations Management), Lead Auditor ISO 9001-2015 & 45001-2018(IRCA)., with total 19+ years (14+ Years in India & 5.2 Years in Gulf) of rich techno-commercial experience in MEP Works of large multi-disciplined commercial and industrial projects like Potable Water Mega Reservoir Pumping Station, Sewer Pumping Station, Booster Pumping Stations & Pipe Lines, Water Treatment Plant (WTP), High Rise Buildings, Power Plants, Highways & Elevated Corridor, Orbital Highways, Tunnels, Ports & Metro’s, Toll Plaza’s etc with ability to lead a multidiscipline team. AREAS OF EXPERTISE:

MEP Erection & Commissioning Operation & Maintenance Project Management Construction Plant & Equipment QA / QC Environmental Health& Safety Contract / Sub-Contract Management Cost Estimation Procurement Activities Multitasking / Team Management Tendering & Estimation Inspection, Testing,Commissioning People Management Communication EMPLOYMENT SUMMARY:

S.No Company Position Held Country / Place

Year

From To

1 Leighton Contracting Qatar (HLG) Project Coordinator - MEP Qatar / Doha July-2015 Present 2 Simplex Infrastructures Limited Manager - MEP India / Kolkata Aug-2014 June-2015 3 Hindustan Construction Company

Limited (HCC Ltd.,)

Manager - Electrical &

Electronic Systems

India / Multiple

Places

April - 2002 July - 2014

4 Inabling Technologies Pvt. Ltd Customer Support Engineer India / Chennai Aug-2001 April - 2002 ORGANIZATIONAL EXPERIENCE

Jul 2015 to Till Date: Leighton Contracting (Qatar) W.L.L Project Coordinator – MEP Systems

Previous Projects:

New Orbital Highway & Truck Route – P023-Contract 3 - Mesaieed, Qatar

103MIG x 4 - Mega Reservoir Pumping Station and Pipe Lines (PRPS3 - GTC626D), Rawdat Rasheed, Qatar

Um Alhoul (QEZ-3) Economic Zone Roads & Utility Infrastructure Project, Mesaieed, Qatar Current Project:

1 x 12MIG Reservoir Pumping Station and Pipe Lines (GTC760), Mekaines, Qatar. Job Responsibilities:

Manage a project (e.g. Study of Contract Documents/Project Specifications & Drawings, Study of works/project schedule and scope of work, budget, procurement costs as well as variation orders etc.)

Representing Main contractor for all coordination meeting with Client, Consultants, Subcontractors, Manufacturers, Suppliers, Ashghal – Wet & Dry Utilities (Treated Sewage Effluent / Intelligent Transportation System / Storm Water Drainage / Foul Sewer / Street Lighting / Road Lighting), QNBN, Q-Tel(Ooredoo), Qatar Armed Forces (QAF) & Kahramaa – Wet & Dry Utility (MV Substation, Potable Water & Electricity)

Review shop drawings(Electrical and Mechanical including Pipe lines, Chambers including valves etc), Construction details, product data, material samples, inspections plans, method statements, delivery schedules to confirm compliance with the requirements of project

All follow-ups with MEP contractors to achieve target dates & program

Monitoring procurement activities & progress of MEP works & Subcontractor on a regular basis & report to Project Manager for any possible major failure

Issue Advise of Defect against any quality issues & Non Compliance of specification & Local Authority requirements to subcontractors

Quality Management:

o Preparation of Material Inspection Request (MIR) and getting approval from consultant o Follow-up with Manufacturer/Supplier for Material Submittal / Method Statement / ITP and support QA/QC Engineers for onward submission to consultant

Risk Management:

o To perform risk analysis as required for the good performance of the works.

Communication Management:

o Communicates with clarity, verbally and in one on one or group situations, or over the telephone to Manufacturers / Suppliers / Consultants / Stakeholders.

Design Management:

o Coordinate with design department for shop drawing preparation, issue and approval and ensure timely availability of approved drawing. Provide inputs to design department for “As Built Drawing” based on changes made to drawing in consultation with execution team o Checking anomalies between drawings & specifications & scope of works o Raising RFI/TQ to Consultants/Designer & pass information to Engineering section, subcontractors, QS Dept & site execution team, time to time

Integrating Management:

o Coordinate with Design, QA/QC, Procurement, Manufacturer, Sub-contractor for shop drawing preparation and get approval from authorities

o Coordination with Consultant for design & material approvals with consultants as well as end users Like Ashghal(TSE / ITS / Drainage / Sewer, Street Lighting), QNBN, Q-Tel(Ooredoo), Qatar Armed Forces (QAF) & Kahramaa (Water & Electricity)

Procurement Management:

o Ensure that all procurements are finalize in timely and quality manner, comply with project spec/QCS o Monitoring of fast moving materials and ensure procurement action is taken in a timely manner o Work closely with Material planning and Engg departments to understand material needs, provide suggestions wherever possible

o Reconcile all materials on project completion to include return to stock, material scrapping, waste disposal, and close out of internal transfers

Manufacturer / Supplier Management:

o Understand the cost and value of the entire supply chain o Discuss/Explain the scope of works and share the critical information as much as possible o Plan for everyday exceptions and major contingencies

Statutory Compliance:

o Updating of Local Authority Permits/NOC's & Ensure compliance by all works as per applicable laws and regulations

o Ensuring that all records / logs / certificates are maintained and updated to provide evidence of terminal conformance to HSE / IMS standards

Stack Holder Management:

o Prepare and facilitate relevant progress reports and distribute to key stack holders o Coordination for all Consultant & Local Authorities inspections & Final Approval o Interface with Ashghal(TSE/ITS/Drainage/Sewer), QNBN, Q-Tel(Ooredoo), Qatar Armed Forces (QAF)

& Kahramaa (Water & Electricity) as needed for the good performance of the works o Preparation of Handing Over documents as per stack holder requirements Aug 2014 to Jun 2015: Simplex Infrastructure Ltd., Kolkata-India (Corporate Head Office) Manager – MEP

Major Projects

Goa Shipyard Modernization, Vasco da Gama – Goa, India

100MGD New Town Water Supply Project, Kolkata, West Bengal, India

Sewage Pumping Station (SPS) – Bilaspur, Chhattisgarh, India

Residential cum Commercial Complex, Mohali, Punjab, India

Intermediate Sewage Pumps Station (ISPS), Mapusa, Goa, India

Kulpi Water Supply Project, Kulpi, Kolkata, West Bengal, India Job Responsibilities:

To act as the project team leader controlling all aspects of the MEP works including planning, administration, commercial, engineering, documentation and handover to the client.

Manage execution of project with prevailing industry standards / quality systems in most efficient, timely and cost effective manner.

Manage design development / procurement / planning department for respective works such as submission of engineering submittals, procurement of major items, MEP construction program etc.

Document project progress and/or delays through letters which can be used as contractual aids during disputes.

Able to review resource reports like (manpower histograms, plant and machinery schedule) and ascertain adequacy of resources deployed for timely completion of the project

Ensure the project progress is monitored in accordance with the clients contractual program and advice accordingly

Ensure that the work is in line with the specifications, procurement, approved shop drawings and complete the work in the best possible way and rectify all defects and complaints within the defect liability period

Programme monitoring, site inspection and quality control to make sure that the projects are completed in correct and satisfactory manner and in the most cost effective way

Review and certify the monthly invoicing of the contractors/subcontractors

Lead technical coordination meetings with client, designer, subcontractors and project staff

Be adept in and aware of International and Local Building Codes of all MEP/HVAC Systems

Lead and Mentor a team of Engineers & Managers on Site

Oversee and enforce the implementation of HSE by MEP/HVAC Contractors

Able to perform all post tender activities of construction until the handing over and completion of the defects liability period of the project

Ensure compliance of construction activity to best industry standards, international codes, planned timelines, allotted budget, company strategy and goals.

Apr 2002 – Jul 2014: Hindustan Construction Company Ltd., India Manager – Electrical & Electronic Systems (MEP)

Major Projects

Rajasthan Atomic Power Project, Unit 5&6 – Rawatbhata – Rajasthan, India

185MLD Tirupur Water Supply Project (Including River intake / WTP / Pumping Station) – Tirupur – Tamil Nadu, India

Chennai Bypass Phase-2 Project – Chennai – Tamil Nadu, India

Bandra Worli Sea Link Project, Mumbai – Maharashtra, India

National Highway Tunnel Project, Maibang – Assam, India

NH-34 Road – Barahampore to Farrakka to Raiganj – West Bengal, India

Kolkata Elevated Corridor Project, Kolkata – West Bengal, India Job Responsibilities:

Looking after Permanent MEP Works (from estimation to commissioning) including: o Lighting / Tunnel Ventilation / Power Supply Systems / MEP / SCADA /Instrumentation / CCTV & PA system Installations, etc.

o Calculate / Extract the Details of equipment’s / cable / transformer / motor / accessories sizing o Preparation of Sizing Calculations for various Electrical Equipment / DG / Transformer / Battery and Battery Charger / Switchgear / PCC'S, APFC & MCC'S Panels / Bus-Bar / Cables, etc. o Conducting Factory Acceptance Test (FAT) as well as Site Acceptance Test (SAT) o Identification of Electrical Utilities (Transformers / Overhead Lines / Overhead and Under Ground Cable / Street Light Poles, etc.) and Re-location

o Review and Monitoring of works during execution as well as getting certification from concerned authorities

o Preparation of As-built drawing as well as submission to the concerned authority for payment / certification, etc.

Actively involved in reviewing / studying various contractual technicalities pertaining to Supply, Installation, Testing, Commissioning (SITC) of electrical items and preparing salient features of the contract

Evaluating contract documents & other relevant correspondence, thoroughly to get acquainted with contract conditions & contractual issues

Looking after project site/building electrification– estimation, planning, procurement to till commissioning which entails:

o Supporting project planning team / HO Equipment team to prepare the actual electrification budget o Electrification (from estimation to till commissioning) o Preparation of Connected Load Details with respect to equipment mobilization o Calculation of the connected load details

o Approaching State Electricity Board for feasibility study and availability of required power / voltage source

o 33 / 11kV Substation and downstream network installations (MCC, PCC & Feeder Panels installations), Site, Office and Camp Electrification, MEP works etc. o Preparation / review of Single Line Diagram (SLD) time to time o Liaison with Govt Agencies & Statutory Bodies viz TANGEDCO, TNEB, TNPCB, SIPCOT, Electrical Inspectorate, Fire & Rescue Services, WBSEDCL, BEST, RSEB, TATA Power(BEST) etc.

Overseeing Intelligent Toll Collection System (ITS) and Highway Traffic Management System (HTMS) comprising:

o CCTV Camera, Variable Message Signs(VMS), Electronic Toll Tag Readers, o Smart Card Readers, Emergency Telephones, Traffic Control Overhead Signal, o Traffic Lights, Digital Video Recorders

o Weather Monitoring Stations like Air Temperature Sensor, Barometric Sensor, Wind Direction Sensors, Visibility Sensors

Significant Accomplishments

o Instrumental in implementing remote monitoring of DG Set parameters through web based system and receiving of SMS through mobile, thereby controlled DG Set operations and resulted in savings of HSD o Accredited with Innovation Award and Reward (Year 2011) from HCC Innovation Forum o Efficiently managed the electro mechanical installation works like power supply systems, tunnel ventilation and tunnel lighting for the Assam Tunnel Project, Maibang – Assam, India o Efficiently managed the Highway & Street Lighting, Tunnel lighting, Under Bridge lighting, Traffic signal, Pumping stations and Toll Plaza’s and Toll Plaza Building electrification for the NH34 Project, Farakka – West Bengal, India

Aug'01 - Apr'02: Inabling Technologies Pvt. Ltd., Salem, Tamil Nadu (India) Customer Support Engineer

Responsibilities

Online / Offline UPS – Erection, Testing, Commissioning and Maintenance

Responded to breakdown calls & preventive maintenance calls and preparation of service escalation report. ACADEMIC DETAILS

2012 Post Graduate Diploma in Operation Management (PGDOM) from IGNOU with 1st Class 1998 Diploma in Engineering from Board of Technical Education with First Class Distinction Other Courses

1999 Balbodha (Sanskrit) form Bharatiya Vidhya Bhavan, Mumbai with First Class 1998 Praveshika (Hindi) from Bharatiya Vidhya Bhavan, Mumbai with First Class 2018 ISO 9001-2015 Lead Auditor from IRCA

2019 ISO 45001-2018 Lead Auditor from IRCA

Certifications

National Cadet Corps (NCC) – Certificate “A”

Riffle Firing 0.22 - Honors Certificate

IT PURVIEW

Operating System & Tools: MS-DOS, Windows 95 / 98 / 2000 / XP / Window10 & MS-Office Project Management & ERP: Aconex, WRENCH & SAP - PM Drawing: AutoCAD

PLC & Automation Systems: Ladder Builder-KV – Keyence PLC, ZEN Support Software – OMRON - PLC, RS Logix 500 – Allen Bradley PLC, SCADA - In Touch – Window Maker / Window Viewer (Allen Bradley, Siemens, GE Fanuc, ABB & Mitsubishi, Omron PLC) SEMINARS / TRAINING

60Hours of CFM (Certified Facility Management) Course attended at Chicago Training, Qatar

40Hours of PMP Course attended at MMTI, Qatar

Confined Space Training Completed at Venture Gulf, Qatar

Installation of Heat Shrink Sleeve on DI Pipes at Canusa-CPS, Dubai

Repairing of DI Pipes & Fittings from Kubota, Dubai / Saint-Gobain PAM, Qatar

15 days on factory training in Atlas Copco AB, Sweden for O&M of L2C / L2D Boomer (Tunnel Drilling Equipment)

“All India Seminar on Energy Management & Recent Development” conducted by Academy of Resource Management, Mumbai

“Applied Electronics” conducted by Indian Marine Time Center (IMTC )- Mumbai

“Industrial Automation and Programmable Logic Controllers” conducted by Indian Marine Time Center (IMTC ) – Mumbai

“First Aid” Training attended in St. John’s Ambulance Association PERSONAL DETAILS

Date of Birth : 11th June, 1979

Languages Known : English, Hindi, Tamil – Fluent Level Malayalam, Bengali, Telugu and Urdu – Conversational Level Passport No. : Z 2404388 Valid up to 26-11-2022

Driving License : India – Both 2 Wheeler & 4 Wheeler

: Qatar – 4 Wheeler

Resident (Permanent) : 21, Iswarya Gate, Ramakrishna Nagar Extn, Solipalayam, 15-Velampalayam,

: Tirupur – 641652 (Tamil Nadu – INDIA)

Resident (Present) : Flat No – 201, Building No:22, Street 899, Zone 90, Al-Wakrah, Qatar



Contact this candidate