RESUME
Vaibhav Gorakh Shinde
BE (Production) passed in 2003
Total experience: 16 Years
Contact No.: - +91-989*******,
E-mail: - adgy6w@r.postjobfree.com Passport No.:- P2031293
Objective:
To enhance my technical skills and serve the organization with my best.
Professional Experience Summary:
Experience in design and detailed engineeringof HVAC systems for Petrochemical plants, refineries, switchgear room, Control room, Electrical substation, Analyzer room, Satellite equipment room, UPS room, Battery room, Laboratories, Warehouse, Administration building & Workshop Building.
Experience in design, detailed engineering and commissioning of HVAC system for offshore platform i.e. leaving accommodation module, switchgear room module, Turbine generator module & workshop module.
Experience in design, detailed engineering and commissioning of HVAC system for Pharmaceutical, Power plant and automobile industries.
Experience in design of HVAC equipment i.e. Fan, Air Handling Unit, Bag filter, Evaporative cooling system & Spray Air washer system.
Experience in design and selection of various HVAC systems like Variable refrigerant flow system, Precision Air Conditioning system, Chilled water system, DX type system, smoke extractor system, Pressurization system & Ventilation system.
Professional Experience:
1. Name of the organization: AHI Carrier, Sharjah
Job Profile: HVAC Lead Engineer
Duration: Dec 2019 – Current
Job Profile:
Assign work to team, review document, coordination with client.
Project Worked:
Arctic LNG2, Novatek – EDG Module Heating & Ventilation
2. Name of the organization: Jacobs Engineering India Private Limited, Mumbai
EPM for Petrochemical, fertilizer, refinery & offshore platforms.
Job Profile: Principal Design Engineer (HVAC)
Duration: May 2015 – Dec 2019
Job Profile:
Preparation of Design basis& Concept note for HVAC systems.
Preparation of Heat load calculation & pressurization calculation.
Preparation of Pressure drop calculation.
Preparation of Duct & Instrumentation drawing.
Preparation of Equipment & Duct layout.
Preparation of Mechanical data sheet for HVAC system.
Preparation of Material Requisition for HVAC system.
Preparation of Technical Bid Evaluation of HVAC system.
Review of Vendor Documents.
Project Worked:
a.Berri Development Project, Saudi Aramco (Petrofac) – Cost estimation for bidding.
Work includes preparation of Heat load calculation, preparation of BOQ.
b.Lower Fars Heavy Oil Development Project, KOC, Kuwait (Petrofac) – Design & basic engineering of HVAC systems for Administration Buildings (2 nos.), Security Guard Buildings (2 nos.), Emergency Generator Building (2 nos.), Package Substation (24 nos.).
Work includes preparation of Heat load & Ventilation Calculation, Duct & Instrumentation drawing, preparation of MTO & Material requisition, Technical Bid Evaluation of HVAC equipment& control system, preparation of equipment & duct layout and Vendor document review.
c.NOx Reduction and CEMS Project, Syncrude, Canada – Preparation of Equipment & Duct layout for pre heating system for turbine generator, Technical Bid Evaluation of Pre Heater Unit & Duct distribution system and Vendor document review.
d.Waste Heat Utilization Project, Shell Nederland - Preparation of Heat load calculation & HVAC specification for prefabricated E&I satellite building.
e.Backflow Protection Lab Sump Project, Scotford refinery, Canada - Preparation of Material requisition of ventilation system for sprinkler room, Preparation of Duct pressure drop calculation for final extraction building.
f.Substation 5 HVAC upgrade Project, Scotford refinery, Canada - Preparation of Heat load calculation, Preparation of Material requisition.
g.Data Center at various locations in India, Reliance Jio Infocomm Ltd, India - Preparation of Heat load calculation, Preparation of equipment layout and BOQ.
h.Capacity Expansion Project, MRF LTD, Goa, India – Preparation of Design basis & Concept note, Preparation of specification for HVAC system, Preparation of material requisition for process chiller.
i.Suncor Plant 93/94 Emulsion Handling Project, Alberta, Canada – Preparation of Equipment list & Equipment data sheet.
3. Name of the organization: Essar Project (India) Ltd, Mumbai
EPC for Petrochemical, fertilizer, refinery &offshore platforms.
Job Profile: Manager (HVAC)
Duration: Oct 2013 – May 2015
Job Profile:
Preparation of Design basis for HVAC systems.
Preparation of Heat load calculation & pressurization calculation.
Preparation of Mechanical data sheet for HVAC system.
Preparation of Material Requisition for HVAC system.
Preparation of Technical Bid Evaluation of HVAC system.
Review of Vendor Documents.
Preparation of Material Requisition for Proposal.
Project Worked:
a.Naphtha stripper Plant, PDVSA, Venezuela – Design & basic engineering of HVAC systems for Administration Building, Fire Fighting Building, Warehouse, Workshop, Operators Shelter, Substation (3nos.), Control Building, Laboratories & Gatehouse.
Work includes preparationof design basis, Equipment data sheet, tentative electric load list & Material requisition.
b.Spent Caustic Project, Takreer, Abu Dhabi – Design and detailed engineering of HVAC systems for battery room, substation & Satellite instrument shelter.
Work includes preparation of Heat Load Calculation, Material requisition, Technical Bid Evaluation, Review vendor drawings & documents.
c.Essar oil Limited, Vadinar, Gujarat – Design and detailed engineering of HVAC system for UPS room, VFD room, Substation & battery room.
Work includes preparation of Heat load calculation, Material requisition, Equipment data sheet, Technical Bid Evaluation, Review vendor drawings & documents.
d.Proposal – KNPC, Kuwait, EDK CNG Terminal, Indonesia.
4. Name of the organization: Larsen & Toubro Ltd, (Oil & Gas) Mumbai.
EPC for offshore platforms i.e. Leaving Accommodation & Process Platforms.
Job Profile: Assistant Manager
Duration: Dec 2009 – Oct 2013
Job Profile:
Responsible for design, detailed engineering and commissioning of HVAC system for offshore platforms.
Design & review Heat Load Calculation.
Design & review Air flow diagram and Duct instrumentation diagram.
Design & review design and control philosophy for HVAC system
Design & review pressure drop calculation for chilled water system.
Design & review duct sizing and air pressure drop calculation.
Evaluate Vendor offers.
Preparation of MTO for HVAC system.
Review vendor’s drawings and documents.
Provide technical support to other related departments for fitment of HVAC equipments.
Provide technical support during installation and commissioning.
Assist in Hazop study and 3D modeling.
Checking of engineering drawings & installation drawings.
Review Pre-commissioning and commissioning documents.
Setting up equipment duties and allocation of equipments for various spaces.
Equipment layout, duct routing and layout in AutoCAD 2010.
Pump selection, flow requirement calculations.
Chilled water distribution system and piping design, piping pressure drop calculations.
Project worked:
a.Gujarat Gas, Kakinada field – Detailed engineering of HVAC system for leaving accommodation module (45 Man), Turbine generator & workshop Module – 225 TR (Leaving accommodationmodule), 35 TR (Turbine Generator module) and 10 TR (Workshop module).
b.ONGC, Mumbai High North – Design and detailed engineering of HVAC system for Leaving accommodation (150 Man) module - 500 TR Capacity
c.ONGC, Mumbai High North – Design and detailed engineering of HVAC system for Switchgear & Turbine generator module - 200 TR Capacity
5. Name of the organization: Aarco Engineering Projects Pvt, Ltd, Pune.
Manufacturer of HVAC equipment i.e Air Washer, Evaporative Cooling unit, Air Handling Unit, Blower, Dust Collector,Scrubber e.t.c. and executing large centralized A.C projects for Pharmaceutical (Clean room), automobile industries & power plants.
Job Profile: Senior HVAC Engineer
Duration: June 2007 – Dec 2009
Job Profile:
Preparation of Heat load calculation as per carrier & Ashrae standard.
Preparation of Air flow & balance diagram for HVAC system.
Establishing equipment duties and Psychometric chart analysis.
Duct design & routing in AUTOCAD.
Preparation of Air Pressure drop calculation as per SMACNA standard.
Duct fittings detailing i.e. grill, diffuser, and damper e.t.c.
Preparation of Equipment layout & installation detailing.
Equipment Design i.e. Air Handling Unit, Air Washer, Evaporating unit, Dust Collector, Scrubber for chemical fumes, Blower.
Co-Ordinate with customer for approval of duct layout and equipment drawings.
Blower & Air handling unit testing.
Commissioning of HVAC system i.e. Pressure & air flow balancing.
Project worked:
a.Genpharama Pvt Ltd, Pune – Design and detailed engineering of HVAC system for clean room application.
Work includes designing of HVAC equipment i.e. Air Handling units, Fans, Force draft units, Exhaust draft unit, Scrubber for chemical fumes & bag filter. Preparation of equipment and duct layout. Preparation of pressure drop calculation.
b.Emcure Pharmaceutical Ltd, Pune & Covalent Laboratories, Hyderabad – Design and detailed engineering of HVAC system for clean room application.
Work includes designing of HVAC equipment i.e. Air Handling units, Fans, Force draft units, Exhaust draft unit, Scrubber for chemical fumes & bag filter. Preparation of equipment and duct layout. Preparation of pressure drop calculation.
c.ACC Cement Ltd, Wadi - Design and detailed engineering of HVAC system for power plant.
Work includes designing of HVAC equipment i.e. Spray Air washer, Fans. Preparation of equipment and duct layout. Preparation of pressure drop calculation.
d.Ispat Ltd, Maithan, Odisa - Design and detailed engineering of HVAC system for steel plant.
Work includes designing of HVAC equipment i.e. Evaporative cooling units, fans. Preparation of equipment and duct layout. Preparation of pressure drop calculation.
6. Name of the organization: New AVM Systech Pvt Ltd., Pune.
Provides engineering and consultancy services for process and chemical industries
(Spray Dryer and Evaporator).
Job Profile: Senior Project Engineer
Duration: February 2005 – June 2007
Job Profile:
Co-Ordinate with client, Design, Purchase, Production and Materials Department for smooth execution of Project.
Preparation of Layout drawings, Equipment drawings, and Equipment installation drawings.
7. Name of the organization: Kam-Avida Enviro EngineersPvt. Ltd., Pune.
Manufacturing Sewerage Cleaning equipment i.e. Suction, Jetting, Garbage Collector machines, Sweeping machine, Hook loader & Drain cleaning machines.
Job Profile: Senior Engineer
Duration: February 2004 – February 2005
Job Profile:
CAD drafting of fabrication Parts.
Pneumatic and Hydraulic circuits in AUTOCAD.
Pressure Vessel design as per IS 2825 Section VIII (For Unfired Pressure Vessel), Power take off (Drive transmission), High pressure jetting system, Vacuum System.
Awareness of relevant standard and rules:
ASHRAE,SMACNA,DW144
SOLAS, AHRI
Computer Skills:
CAD Tools: CATIA V5, UG NX3, AutoCAD, AUTOLISP & Naviswork
Elite, Hevacomp and Carrier HAP 4.7 for heat load calculations.
Maquay Ducting Software and Pipenet, Sunrise software
ACADEMIC QUALIFICATION:
Examination
University/Board
Year
Percentage/Class
B.E (PRODUCTION)
Shivaji University
May 2003
62.07%
H.S.C
Pune Board
March 1998
60 %
S.S.C
Pune Board
March 1996
71.46%
Personal profile:
Sex: Male, Date of Birth: 18/02/1981
Marital Status: Married
Present Address:
Flat No.1216, Al Mahata Building,
King Abdul Aziz Street, Sharjah.
Signature
(Vaibhav G. Shinde)