Post Job Free

Resume

Sign in

Machine Operator Manager

Location:
Spring, TX
Posted:
October 13, 2020

Contact this candidate

Resume:

LEWIS MCGEE

**** ********* ***** **** **** Spring, TX, 77386 281-***-****

adgxvs@r.postjobfree.com

OBJECTIVE

Self-motivated, determined, and willing person who adheres to all company policies. Safety, integrity, customer satisfaction, and quality are essential to me. This is my representation of me for my employer.

EDUCATION

Lone Star College/North Harris: Houston, TX: Undergraduate/AAS Mechanic Engineer

Forest Brook High School: Diploma 1997-2001

PROFESSIONAL EXPERIENCE

CNC/Spare April 2019-May2020

Vallourec/Coupling Shop Houston, 77073

4.5’’, 5.5’’, 6’’, 10’’ Vam-Top, Vam21, DWC/C coupling

Performed daily parameters

Mechanical Ring Plug, Vernier Caliper, Thread height gage, Lead gage, Taper, Chamfer, Blue Plug, Seal gage, Run-out gage,

Forklift, Over Head Crane, Jib lift crane, coupling paint shop, load and unload Phosphate coupling, Mori Seiki machine operator, A.M.-P.M. articles.

Thread Line Inspector

Republic Tube July 2018-March 2019

Gages/Mechanical Ring Plug, Taper, Ring Gage, Lead Gage, Thread Height, Chamfer, Run-out Gage, Vernier Caliper

Performed daily parameter measurements

NCR, Log sheet

Quality Control Inspector

Lincoln Manufacturing January 2018-July 2018

Gages/Mechanical Ring Plug, Taper, Ring Gage, Thread Height, Chamfer, Run-out

NCR first and last article

DWC/is+, OCI, Buttress Thread, LCT Thread, STC Thread, R1, R2, R3 pipes

Perform daily parameter measurements

CNC Operator April 2017- August 2017

TMS Staffing-Essentra Pipe Protection Technologies

Prepare and operate CNC machines to perform tasks such as drilling, grinding, milling etc.

Understand specifications of the task at hand and the desired result by interpret blueprints, mechanical drawings etc.

Translate instructions into computer commands so the machines can perform the correct function

Prepare and load raw materials and parts onto the machines

Prepare a test run to check if the machines produce outputs according to specifications

Set machines to complete full cycles to fabricate large number of parts

Supervise the machines while they execute the tasks and make any necessary adjustments to produce a better result

Inspect and measure finished products and compare them with requirements to determine if the process has been completed properly

Check and maintain machinery daily to ensure functionality

Thread Line Inspector March 2014 – March 2016

OMK Tube

Performed thread parameter measurements

●Inspected P110, J55, N80Q, L80 pipe joints, 8 round and buttress threads

●Tapered/Lead Gauges, Thread Height, MRP, Protractor, Ring Gauge, Profile, and Calibrated Daily

●Used spread sheets daily and records of inspections

●Established standard operations

●Covered different positions

●Rack Remediation

●Correct visual imperfections

●Reapply the materials, and identify for traceability

●Applied protecting coating for storage

Safety Advisor October 2012 – July 2013

ACT Pipe N Supply

●Monitored and advised truckers, haulers, company’s, and DOT procedures

●Installed safety procedures

●Safety Data Entry

●Monitored cameras and kept records of all safety photos

●Ensured that the company was following health and safety regulations, legislation and policies and minimized occupational risk in the workplace

Mechanical Assembler/Power Houses March 2011 – July 2012

National Oil Well Varco

●Assemble Power Houses and Drillers Cabins

●Insulated houses with Styrofoam

●Skinned houses with .06 or .09 aluminum sheet panels doors

●Installed heavy loaded equipment into the house

●Buffed, primed, and painted the exterior wall

●Built frame and fab beauty pieces for the air handlers, positioned MCC’s, and plugged panels

●Framed windows with aluminum angles, cut and installed Shasta ceiling board material on ceiling

Warehouseman II September 2010- March 2011

Superior Energy Services, Inc.

●Adhered to on-call/off-call work schedule

●Ensured Standard Operating Procedures are followed and documented

●Conducted accurate and timely inventories of raw materials out of the assembly area

●Operated Forklift: Loading and Unloading, Shipping and Receiving

●Grinded, Buffed, Primed and Painted pipe joints

Quality Analyst March 2006- September 2009

Asurion Services

●Monitored customer services agent, provided feedback and documentations

●Provided leadership in the support, facilitation and coordination of business and quality standardization

●Processed optimization activities to ensure world class customer services

●Practiced and shared knowledge of quality methodologies

●Utilized lean practices and Project Management tools to achieve results

●Lead and influenced in a matrix environment that created operational excellence

●Compiled, verified, summarized, and interpreted data for report generation

●Established priorities and determined deadlines on a daily basis

Professional References:

●Allen McMillan: OMK Tube Plant Superintendent 281-***-**** ext 197

●Kenneth Sheffield: OMK Tube Logistic Manager 832-***-****

●Rodney Williams: National Oil Well Varco Human Resource Manager 832-***-****



Contact this candidate