EDUCATION

Mechatronics engineer at Alexandria Higher Institute of Engineering & Technology

(AIET), Egypt.

Overall Grade: Good

Graduation date: June 2010

Project: Autonomous Mobile Manipulator for Mine Detection Graduation project: excellent

PROFESSIONAL EXPERIENCE

DIRECTOR OF THE WORKSHOP FOR THE PRESIDENT OF THE EGYPTIAN CONTRACTING COMPANY FROM DECEMBER 2019 TO DATE

• Maintenance of heavy equipment from Hrasat, Griddarad and Loader (diesel + hydraulic + pneumatic + welders)

• Maintenance of pick-up for Nissan Turbo and gasoline cars (Nissan Sunny + Hyundai Verna)

• Maintenance of Mercedes-Actors and Lacrosse tractors (diesel + hydraulic drive), trailer and sweepers

• Maintenance of cement mixer trucks, ready mix concrete plants and crushers

• Planning for maintenance, managing a group of maintenance technicians, planning work, and planning to purchase spare parts

• Maintenance and operation of cement, asphalt and mixers

• Maintenance and operation of interlock machine and cement mixer RELIABILITY PLANNING MAINTENANCE ENGINEER, NATIONAL PAPER COMPANY FROM AUGUST 2017 TO December 2019

• planning maintenance and scheduling (mechanical + electric + control)

• planning supply chain for spare part and estimating maintenance

• planning and maintenance heavy equipment and trucks and bus

• Maintenance mechanical rotating and static system

• Maintenance electric (motor + distribution panel+ control panel + PLC)

• make stop for maintenance is same time stop for product to didn’t stop works and if the maintenance makes in time product work make it fast

• make budget for maintenance and save cost for maintenance and make breakdown lower

• maintenance the equipment paper machine (mechanical + electric +control HVAC and fire fighting engineer, capital construction company from October 2016 to AUGUST 2017

• HVAC and firefighting design

• Installation HVAC (Chillers water & package split) for building and hospitals

• Designed chillers water system for separate rooms based on use

• Inspected the HVAC systems and maintenance it

• make report for cost and scheduled for HVAC

• Cost control work and schedule of projects

• Operation of a periodical maintenance and spare parts specification

• Installed fire fitting Systems for companies and workshops

• Cost control for project and planning cost and parchments and schedule Heavy Equipment Maintenance engineer at Alexandria for hydraulic from November 2015 to October 2016

• Maintenance work for heavy equipment (hydraulic + diesel)

• Work plans for the periodic maintenance of equipment

• Monitoring of spare parts and vendor comparisons

• Work to reduce costs and increase efficiency

• Work inventory count and expense control

• Ensure quality of maintenance and stomach efficiency

• make cost control and planning for spare parts and maintenance Maintenance engineer & Planning &cost control engineer Royal ceramic company Obour city,Egypt August 2013 - October 2015,

• Planning preventive maintenance by SAP program and implementation of all section’s factories maintenance (SAP. Planning Maintenance)

• Hydraulic maintenance for press and Clarke raises their efficiency and reduce corrective maintenance as much as possible

• Mechanical maintenance for production lines and raise their efficiency and reduce corrective maintenance as much as possible

• Mechanical maintenance for automated sorting and raise their efficiency and reduce corrective maintenance as much as possible

• Action 4 combinations ink jet (printing in ceramics) and modify the lines

• work order preventive maintenance and executed her time

• To raise the efficiency of all departments (Press - lines - loading and unloading

- Furnace - Automatic sorting)

• control the movement of spare parts from the warehouse and reduce them to reduce maintenance costs

• the purchase of ceramic materials manufacturing planning

• Followed up the inventory of raw materials and spare parts and cost

• ceramic pricing and audit costs and try to reduce the cost

• Followed-up to the rate of exchange of raw materials and the cost and find out reasons for the high rate of consumption and increase the cost

• Planning product material for years and followed material for monthly

• Followed up production orders and moderated and knowledge of the reasons for the imbalance if it occurs

• Cost control & estimating for products & materials product and spare parts

• make stop for maintenance is same time stop for product to didn't stop works and if the maintenance make in time product work make it fast and make preventive maintenance only and correct maintenance is lower

• planning control for product and maintenance

HVAC engineer, union air group Alexandria, Egypt

August 2012- August 2013,

• HVAC design (Chillers water & package split) by HAP & AutoCAD for small building

• Installation HVAC (Chillers water & package split) for building and hospitals

• Designed chillers water system for separate rooms based on use

• Inspected the HVAC systems and maintenance it

• make report for cost and scheduled for HVAC

• make plumbing for HVAC

Fire Fitting engineer United Engineers Office Alexandria, Egypt August 2011- August 2012

• Fire alarm system maintenance, CCTV maintenance to Arab Academy for Science Technology & Maritime Transport (AASTMT)

• Installed fire fitting Systems for companies and workshops

• Installed fire alarm, telephone network and CCTV of Burg Al Arab companies

• maintenance mechanical and electric for fire fitting companies and workshops

• maintenance fire alarm and CCTV for companies and workshops Inspection welding & maintenance engineer, EL-Dalil Contractors August 2010- August 2011

• Inspected welding by :liquid penetration test,visible test, ultrasonic test

, read films for radiographic test

• Using AutoCAD design of Flinches and gables, pipes and elbows,tanks

• make welding by MIG and TIG welding or electric arc & inspection on the welds by considering abstract . Liquid penetration test &.magnetic penetration test by read films for imaging by gamma rays and beta inspecting the quality of colours and make report for qual. for welding

• Mechanical maintenance for heavy equipment (hydraulic &diesel engine)

• electric maintenance for machines and distribution for company and make insulation for The company

• make preventive maintenance for machine and must make check for welding machines and tools and make check for wire and arc for welding in workshop to sure that work not stop and make order if spare part is near to end

• make cost for product and must make the material ( steel and welding arc or wire) and make time to end work fast

• design and manufacture and disclosure of welds and work Alumni used and the electrical connections and control

• Implementation of the welds and implementation of design

• Implementation and crane manufacturing plant and implementation of factories and maintenance of heavy equipment

• Implement the seams and completing the designs and work to increase the efficiency of workers and working and determine a way to increase efficiency

• monitor the implementation of paint and sanding and inspecting the quality of the paint and sanding work properly

• make insulation pipe line for water and oil

INTERNSHIP EXPERIENCE

9 June 2007- 28 August 2007

Ford Motors

• Maintenance centre cars both diesel and gas cars)

• Mechanical and electrical maintenance

• maintenance the heavy cars

13Jule 2008 - 24Jule 2008 (Steel Plant)

26 Jule 2009- 6August 2009 (Direct reduction plant) Ezz El. Dekheila Steel - AZDK

1. Steel Plant

• Continuous casting furnaces explained to her and both maintenance and electrical mechanics of the oven

• continuous casting machine to run both maintenance and mechanical and electrical

• electrical distribution plant

• control the plant by PLC & SCADA

• maintenance of continuous casting lines

• types Alssanzor used and connections

• raw materials used for the manufacture of steel

• maintenance of hydraulic circuits

• electrical distribution of the plant fully and transformers

• CCM Continuous Casting Machine, how it work & maintennance for it 2. DR plant

• Frane definition DRI

• Maintenance belt types and how to maintain them and installed

• Electrical distribution and control rooms

• Hydraulic circuits in DRI

• Engineering design of vibration

• Maintenance of control devices

• Preventive maintenance work and planning her schedule

• Maintenance of cooling towers

CERTIFICATES AND TRAININGS

1. Microcontroller AVR 2. Liquid penetration test 3. Magnetic penetration test 4. Radiographic test 5. Ultrasonic test 6.PLC 7. Primavera P.6 8. SCADA 9. AutoCAD 10. HVAC 11. firefighting 12. Plumbing 13. Hydraulics &Pneumatic 14. Project Financial Management 15. PMP 16.Planning and schedule Maintenance 17. Lean construction Management 18. Operations Management 19. Contracts classification 20. Lean six sigma 21. Rail Vehicle Engineering 22. Value Management

TOOLS ANDTECHNOLOGIES

Duct size, HAP, Primavera P6, AutoCAD 2D. PLC soft ware, SAP, Elite Software KEYSKILLS

Site engineer, Installation( HVAC,,Fire alarm, Fire Fitting,plumbing ), project management, Planning &Cost control engineer,Hydraulic maintance, Total Productive Maintenance (TPM) Total Quality Management (TQM),,Supply Chain

,Hydraulic Design, Team Leader, Product planning,line product maintenance, Planning maintenance Engineer, Hard worker, Problem Solver, Maintance engineer,SAP user,Planner product, Liquid penetration test penetration test, ultrasonic test, radiographic test, AutoCAD 2D, SAP Materials Management (SAP MM)