Mazen Amad

MANAGER

In the past **+ years, Mr. Amad, has served as QA/QC Manager, Construction Management, Testing and Commisioning Manager, Lead Electromechanical (MEP) Engineer, Lead Telecommunications / BMS/SCADA, Rail, Engineer for Infrastructural, Water, Wastewater, Desalination, and of all types of Buildings Projects.

His knowledge of the local & international laws and standards coupled with his experiance in building project construction and construction management with US and International Companies gives him a strong background for managing all aspects of a QA/QC programs including development and update of plans & ITP'S, monitor implementation of quality plans & forms, compliance auditing of materials /avtivities/forms/tests, monitor and help resolve non- conformities, plan and excecute testing & commissioning activities, training of project teams, prepering quality reports, communicating with project team.

Mr. Amad is also a highly qualified electrical/electromehanical (MEP) and low current system engineer in the buildings (residential, commercial, high rise, Industrial, hotels, banks, data center, etc.) including; BMS (Building Management System), Pumps, HVAC Systems, Elevators, Computer Networks, Fire Systems (Fire Detection Systems, Fire Fighting and Extinguishing Systems), Security Systems (Access, Burglary & CCTV), Telephone Systems(traditional, voip), TV& Satellite( analog, digital), Music & Sound Systems, UPS & Generation Plants, earthing (grounding), Lighting (Internal, External, Landscape), Power Systems (MV/LV Switchgear, Internal and External Networks, Power Panels), Lightning Protection, and Others which gives him strong qualifications for managing and resolving technical issues related to all electrical, electromechanical, and low current works making him a strong asset to the projects.

Proven ability to plan and lead the projects all over the project life stages and accomplish the intended project goals including Testing and commisioning and Hand Over. All is supported by a wide knowledge and experiance in QA/QC project management, construction management and very good tehnical background.

Selected Relevant Project Experience

December 2017 - August 05

QA/QC Manager MEP - CCC, BACS Riyadh Metro Project (Bechtel, Almabani, CCC and Siemens Consortium) Riyadh - Kingdom of Saudi Arabia.

Contractor - EPC (Hired to work on design and build of Lines 1 and 2 of the Riyadh metro network. These two lines will form part of the six-line metro system that will run for a total length of 176 kilometers across the city and includes 85 stations).

Key Responsibilities:

PROJECT SCOPE of work on Lines 1 and 2 encompasses detailed structural, architectural, electrical, mechanical, BMS, SCADA and transit system design together with construction, procurement of all products and materials, integration, testing and commissioning works and all the necessary support for project delivery. Line 1 stretch from north to south through the centre of Riyadh, along the Olaya-Batha corridor, covering 38 kilometers. The line will include 22 stations and 4 transfer stations where it will connect with other new metro lines. Much of Line 1 will be underground. Line 2 runs east to west along King Abdullah Road and will be built mostly at grade (15km) with some elevated sections. This line will run east to west and will extend more than 25 kilometers with 13 stations and 3 transfer stations.

Submit reports to the Project Controls Manager, on the performance of the self-executed and subcontractors under their remit for inclusion in the monthly report.

Manage, coordinate and supervise QC Engineers / Inspectors on the project.

Initiate, review, approve and maintain, as applicable, quality control procedures, inspection testing procedures and plans.

Supervise the first line inspection and test of constructed assets in accordance with approved Inspection and Test Plans.

Plan and coordinate with the QC Engineering team on a daily basis to allow for advance planning of the necessary inspections and testing for project activities in their particular section.

Monitor closely the ongoing work activities under their control and make sure that works are completed in accordance with the approved shop drawings and specification

Undertake independent inspections and tests to sample the works and the materials being brought to site and BACS store to verify compliance with the obligations of the contract.

Act as liaison between the Employer, Field Engineering team, Subcontractors QC team and the QC team for the establishing and coordination of inspection activities.

Manage all quality control staff and activities validating work is completed in accordance with project specifications, to the required quality standards and within prescribed timeframes including the allocation and mobilization of resources and the monitoring of use.

Attend meetings with Employer, Construction Team, Subcontractors as the Contractor representative on matters relating to quality control.

Perform inspections and audits of completed records & works and to confirm that they are complete.

Report Non Conformances identified (NCRs and CRs) within their section of the works as per the project Control of Non-Conforming items procedure.

Attend factory acceptance tests with owner representative and provide comments, recommendations and sign approvals.

Identify, and implement, areas of preventive action that will improve quality control on the project.

Prepare Inspection and Test Plans for work activities and review subcontractors ones in MEP field as per the project Field Inspection and Testing Procedure.

Share "lessons learned" with relevant persons on the project team.

Monitor non-conformance system for identification, control and rectification of all nonconforming Items.

Establish the system for collection, indexing and filing of all QC records required for certification.

Provide Quality toolbox talks to project staff within their section on a biweekly basis and to their area requirement.

Assist with the determination of suitable correction, corrective and / or preventive action to address identified Non Conformances on the project.

Collate and issue Quality Concerns for further analysis, quality performance data as required by the established metrics for the project.

Review and propose approval of the quality control procedures and plans used by potential suppliers and sub-contractors to make sure that work will meet project requirements

Identify development and training needs within the department and make recommendations for appropriate training programmers.

June 2014 - September 2017

QA/QC Manager, PROGER (International Engineering Management Company) Kingdom of Saudi Arabia.

Consultant - CM (Hired to work on KAP3, engineering consultancy services of design review and construction supervision of some 3,400 buildings on 600 sites across Saudi Arabia for the implementation of His Highness the King of Saudi Arabia's Security Headquarters Development Project. Value; Works 2,4 billion EUR, services: 180 million EUR, Buildings: 3,400, Sites: 600 and Professionals: 800).

Key Responsibilities:

Project included a variety of 48 types of buildings; police stations, passport buildings, civil defense, hospitals, schools, clinics, residential buildings, stadium, training centers, data centers, facades, etc.

Create, update and maintain all project submittal platforms and all other project specific quality control documents and reports.

Manage and delegate tasks to a team of site quality control engineers and inspectors.

Manage and control quality system requirements for the project, develop and maintain requirements of inspection and testing quality control in order to achieve consistent product quality and standard of workmanship

Support the review of Electro-mechanical shop drawings and material submittals for conformance with project specifications by assisting the technical department manager with reviewing submitted documents, and by leveraging the knowledge and experience of others in the project team when necessary.

Provide technical support to Construction Team, identify and communicate product quality requirements / relevant standards to maintain consistency of product quality.

Create and improve quality awareness within the organization; and identify areas for improvements. Assist in assembling and forwarding project closeout documents that include O&M manuals and as-built.

Develop a quality & inspection program that meets the provisions of the Operations & Maintenance Activity at project closure phase.

Advise on the stoppage of work if necessary to resolve matters that affect safety, quality and/or inhibit the logical progress of work.

Monitor and help construction team in resolve of non- conformance reports.

Work with Contractor in producing the relevant ITP's.

Develop the final building system inspection, testing and commissioning plans, forms and documents.,

Review suppliers and contractors third party testing facilities and conduct periodic inspections and surveillances to assure product quality.

Perform audits on construction team inspections, documents and records to confirm completeness, correctness, authorized by relevant parties.

Perform review of developed project plans to assure conformity to the organization quality plan.

Evaluate and update quality system process and procedures.

Prepare QA/QC reports and communicate with other project parties.

April 2013 - June 2014

QC Manager, CDM Smith (US Contracting Company).

Contractor - EPC ( Hired to work on Well Flow Monitoring SCADA Project for 48 potable water wells located at sites throughout the West Bank and transmission of the flow monitoring data to a Central Control Building including Radio Communication System, Well Sites Mechanical & Electrical Systems (MEP), site stations buildings, Site PLCs & RTUs, SCADA Data Center Building)

Key Responsibilities:

Prepared estimated project budget of $8 million USD for the project.

Developed and oversaw QA/QC program implementation; analyzed and audited quality throughout project; reviewed drawings, materials, documentation and site to ensure international quality standards were met.

Delivered project two months ahead of schedule despite problems with original design; collaborated with team on developing solutions that kept project on time and maintained required levels of quality.

Led QA department staff of five; monitored work performance and guided in project completion.

Orchestrated RFP process; directed team in identifying suppliers and sourcing materials.

Discussed non-conformance reports with manger and implemented “fixes” according to QA/QC plan.

Created and implemented testing, start-up, commissioning and training plans.

Reviewed processes of quality control systems and refined accordingly to increase efficiency of operations and ensure project met milestones.

Delivered QA/QC reports to senior management.

December 2011 – February 2013

Lead Quality Control Manager, IRD (International Relief and Development) - US Company

Contractor - Hired to work on projects funded by USAID, Drilling and Pump Testing of Four (4) Water Supply Wells of Depths up to 1000m, Well #17 Pump Station Building, Facilities (MEP), and Conveyance System.

Key Responsibilities:

Delivered QA/QC reports to senior management

Developed and oversaw QA/QC program implementation; analyzed and audited quality throughout project; reviewed drawings, materials, documentation and site to ensure international quality standards were met.

Prepared estimated project budget for Well #17 Pump Station and Conveyance System.

Collaborated with team on developing solutions that kept project on time and maintained required levels of quality.

Led QA/QC department; monitored work performance and guided in project completion.

Orchestrated RFP process; directed team in identifying suppliers and sourcing materials.

Discussed non-conformance reports with manger and implemented “fixes” according to QA/QC plan.

Steered the instrumentation/electrical processes for construction projects, monitored key performance indicators and implemented continuous amendments to the maintenance work.

Created and implemented testing, start-up, commissioning and training plans.

Reviewed processes of quality control systems and refined accordingly to increase efficiency of operations and ensure project met milestones.

April 2009 -

September 2011

QA/QC Manager, MWH Americas Inc. (Montgomery -Watson - Harza), International Engineering and Management Company.

Consultant - CM ( Evaluated the existing electromechanical ( MEP) and structural conditions of the Palestinian Water Authority (PWA) existing well and pumping stations as program of rehabilitation of PWA Eastern Hebron Bulk Water Supply System and Facility Buildings funded by USAID.)

Key Responsibilities:

Prepared design for : new facilities, new buildings, rehabilitation of existing water pipe lines, construction of New Buildings, upgrade the 33KV, 3.3KV and 400V electrical systems, low current electrical systems, booster and deep Well pumps, water surge protection system, power panels and MCC’s, buildings (MEP) Systems ( Lighting, AC Systems, Earthing, Fire Alarm, Lightning Protection, etc.), instrumentation, control system, PLC & SCADA Systems.

Reviewed all contractor submissions, i.e. work method plans, materials, shop drawings, etc.

Prepared and delivered status updates and QC reports to Construction Manager.

Resolved issues associated with project and ensured project met designated milestones.

Inspected materials, completed work, issued site instructions and memos.

Led weekly QC and progress meetings with various stakeholders.

Enforced site safety and HSE plan.

Monitored project costs and approved contractor payments.

Oversaw pumping station building, system testing and final commissioning.

The Job

Purpose of the Job

Crossrail will deliver a railway that is fully integrated, tested and commissioned at opening. This requires the infrastructure, rail systems, rolling stock, operational procedures and railway staff to deliver a railway that is operable, maintainable and safe, meeting all the performance criteria and other requirements set by the Sponsors. A substantial part of the infrastructure that underpins this success is being installed and commissioning by the C610 Systemwide Mainworks contract.

The C610 Test and Commissioning Manager (C610 T&CM) will be the prime focal point for all T&C activity between C610 and the many other parties that interface with C610, from a design, planning, safety, construction, T&C and assurance perspective. This critical, senior leadership role will be responsible for holding the C610 Main Contractor to account and ensuring that our strategic and detailed T&C plans, and corresponding reports/metrics, are in place, are robust and evolve as required over time.

Principal Accountabilities

Accountable for providing technical expertise and know-how to all parties, anticipating potential issues ahead of time, providing trouble-shooting knowledge in the field.

Review and input to major safety critical areas, eg energisation protocols, managing works adjacent to live HV through stations and in the trace, LOTO, etc.

Input to the workstreams reviewing transition of temporary to permanent services, to ensure robust processes in place for E&B, stray currents etc.

Review planned T&C resource levels (and type) against level 4 & 5 plans, and CommLot skylines - and then verify competence once in the field.

Spend time on site to witness key testing hold points, and support teams with any major diagnostic fault finding challenges, injecting precious experience.

Responsible for maintaining and issuing T&C and Handover Dashboards each period, and working with the team to ensure progress remains on track.

Liaise with all relevant parties and act as the prime point of contact for all T&C activities for C610.

Main challenges of the job

This role will involve influencing many individuals, teams and organisations that may not report directly into this T&CM role. The scope extends to the full remit of C610, including all M&E, OHLE, switch rooms, and Permanent Ventilation.

Management and liaison with a substantial number of entities. Facilitating and coordinating the interfaces between all third parties and stakeholders.

Soliciting, managing and interpreting large quantities of data from other third parties.

Changing the culture and ethos from a construction job to a systems T&C job.

Managing the contractor to perform in accordance with the requirements of the contract, including safety, schedule, cost, self-assured quality etc.

Managing huge levels of complexity in a very fast-paced & challenging environment.

Person Specification

Extensive technical knowledge and practical experience of testing, pre-commissioning and commissioning large industrial systems, preferably within the rail industry.

Substantial knowledge of precedents in the T&C and operations areas and a broad knowledge of principles and practices of related areas.

Broad knowledge of industry and regulatory standards and criteria pertinent to Rail T&C, maintenance, operations, and testing.

Highly desirable to have practical experience with design, development, configuration, testing of SCADA, fieldbus, PLC, DCS system, and management of such projects.

Demonstrated skill in leadership, collaboration and making things happen.

Member of a relevant professional institution. Chartered Engineer preferred.

University degree in an engineering or construction related subject.

Proven track record of delivering substantial T&C programs of comparable size & complexity.

Experience working within the rail industry sector, and delivering rail systems.

Proven ability to develop, nurture, influence and manage complex and demanding stakeholders. Evidence of personable and effective leadership style.

Technical familiarity throughout the delivery project lifecycle.

Evidence of high energy, collaborative, can-do attitude.

Proven ability to develop, nurture & manage complex and demanding stakeholders

January 2008 - April 2009

Construction Manager, Future Iron Pipes LTD, Hebron.

Owner Representative (Recruited to manage construction of large factory building and electromechanical Systems ( MEP) for iron pipes manufacturing, PE coating and internal cement lining of steel pipes.)

Key Responsibilities :

Prepared design for: new facilities (MEP), new buildings (MEP), the 33KV, 3.3KV and 400V electrical systems, low current electrical systems, production lines, power panels and MCC’s, buildings MEP Systems (Lighting, AC Systems, Earthling, Fire Alarm, Lightning Protection, etc.), instrumentation, control system, BMS, PLC & SCADA Systems, Water Cooling Towers, Pumping Stations, Factory HVAC System, Plumping, Fire Fighting Systems, Security Systems, Offices MEP Systems, etc.

Liaised between owners, authorities, factory equipment manufacturers, suppliers and utilities.

Orchestrated schedule of contractors to ensure project stayed on target quality and estimated timeline.

Selected materials and equipment; identified sub-contractors and procured resources.

August 2007 - October 16, 2008

Project Manager, SAK (Saqqa and Khoudary General Contracting Co.).

Contractor (Coordinated and directed project activities; prepared construction plans and managed implementation of project strategies for Package 4C – West Bank Water Resources Program funded by USAID.)

Key Responsibilities:

Responsible Directed staff of 25 from various departments and seven sub-contractors; managed $21million budget.

Delivered Project within the estimated cost, budget and time.

Prepared and negotiated cost estimates, budgets, and work timetables.

Orchestrated the selection of all products, equipment and sub-contractors.

Selected appropriate construction methods, and strategies.

Interpreted and explained contracts and technical information to workers, subcontractors, and other professionals.

Collaborate with Subcontractors, engineers, and other construction and building specialists

Instructed and supervised construction personnel and activities onsite, reviewed subcontractor work progress, led weekly status meetings and reported on progress.

Responded to work delays and other problems and emergencies.

Complied with legal requirements, building and safety codes, and other regulation

Managed System Testing and Commissioning Plan; developed plan, planed resource levels, participated in testing and commission of system and components, including: civil, power, control, pumps, piping, valves, and operators to ensure functionality.

Monitored the Training of customer employees on new systems.

December 2004 - February 2007

Resident Engineer, CH2MHILL INT., US Engineering and Construction Management Company

Engineer (Reviewed engineering design and bidding documents for Phase Three West Bank Water Resources Program, Eastern Hebron Bulk Water Supply Project funded by USAID by constructing 2 new well pumping stations buildings, 2 new booster pumping stations buildings, water pipe lines, 1 power substation building, 33KV power overhead line (30Km), 33KV underground power line (100) km and 1 reservoir; prepared amendments to align with bid documents.)

The Duties and Responsibilities included:

Oversaw contractor work to ensure work complied with specifications; resolved and clarified issues that arose.

Authored and distributed memos and site instructions.

Steered the instrumentation/electrical processes for construction projects, monitored key performance indicators.

Administered various elements of the maintenance program, including PLC, Instrumentation/Control system, SCADA system, etc. and analyzed device calibrations as well as spare parts availability.

Streamlined procedures, equipment tools and evaluated project overview for testing/commissioning of high, medium/low voltage power systems/networks, Overhead Lines, Underground Cables, Switchgear, Transformers, Distribution Stations, etc.

Interfaced with operators, mechanics, vendors, contractors, management and other groups to meet project objectives.

Constructively resolved conflicts among the project team thus fostering their cooperation/collaboration.

Oversaw the functioning of Instrumentation/Control Systems to verify the maintenance of water stations piping/pumping, Main Electrical Networks, Main Electrical Distribution Stations/Substations.

Prepare O&M manuals and training technical team.

December 2003 - December 2004

Lead QA/QC Electrical Engineer, CDM (Camp Dresser & McKee Incorporated), US Contracting Company

Contractor / EPC (Designed and Evaluated, Bid and Procure, Oversaw and coordinated site safety in compliance with local safety codes; supervised and coordinated all site activities for construction and renovation of pump stations, water systems, waste water treatment plans (WWTB) and sanitation systems in the West Bank and Gaza under Environmental Health Project (EHP) – Task Order 804 funded by the United States Agency for International Development (USAID)).

The Duties and Responsibilities included:

Envisaged engineering designs for the construction of restructured Pump Stations, Water Systems, Waste Water Treatment Plans(WWTB) and Sanitation Systems, assisted in the establishment of site EH&S plan and monitored all aspects of EH&S at site thus promoting project maintenance/operations.

Analyzed/executed project requirements and reviewed projects to monitor compliance with safety codes and company policies/procedures. Resolved any unexpected technical difficulties, identified bottlenecks and effected systems reengineering.

Engineered construction/maintenance of structures and perpetuated maintenance/commissioning of computer networks, fire systems, security systems, etc.

Ascertained apposite construction means/methods and optimal cost effective plans/schedules. Oversaw the selection and requisition of materials for use in construction, quality control and safety matters on the site.

Supervised, executed and authorized critical pre-inception surveys of existing / proposed infrastructure, with associated modalities pertaining to project construction and maintenance.

Assured clear channel of communication between various participating contractors and subcontractors to negotiate contracts, ensure strict adherence to quality standards, deliverables, schedules and budgets.

April 2001 – November 2003

Lead QA/QC Electrical Engineer, Contrack International Inc. ( US Contracting Company).

Contractor (Led and directed project QC and electrical activities of USAID funded project was designed to provide a reliable source of clean water across the West Bank and Gaza. It included Construction of four pump stations buildings, drilling five deep wells, installation of high-pressure transmission lines and connecting permanent power for five existing pump stations).

The Duties and Responsibilities:

Spearheaded the overall department activities like quality control techniques, quality assurance, inspection, testing and commissioning of electromechanical and instrumentation systems.

Presented monthly data of project performance parameters, along with O&M manuals, to the senior management and Technical Team Training

Directed daily QA staff activities/needs, interfaced with project work teams and acted as facilitator / coach in areas of quality control techniques.

Steered the instrumentation/electrical processes for construction projects, monitored key performance indicators and implemented continuous amendments to the maintenance work.

Administered various elements of the maintenance program, including PLC, Instrumentation/Control system, SCADA system, etc. and analyzed device calibrations as well as spare parts availability.

Streamlined procedures, equipment tools and evaluated project overview for testing/commissioning of high, medium/low voltage power systems/networks, Overhead Lines, Underground Cables, Switchgear, Transformers, Distribution Stations, etc.

Oversaw the functioning of Instrumentation/Control Systems to verify the maintenance of water stations piping/pumping, Main Electrical Networks, Main Electrical Distribution Stations/Substations.

July 1989 – March 2001

Senior Electrical Engineer, Center for Engineering and Planning, Ramallah.

Consultant (Construction Management, Engineering Design, Projects Supervision and Site Support) for various Projects;

Public Sector Buildings: Construction of School Facilities for Basic Education in the West Bank - Japan International Cooperation Agency (JICA), The Extension of School Facilities in the West Bank - UNDP, Awdah Housing Project.

Private Sector Buildings: Jericho Resort Village, Palestine Securities Exchange, Palestine International Bank, Commercial Bank of Palestine, Ministry of Economy-Trade-and Industry.

END

Personal Data

Nationality Jordanian.

Birth Male, Nablus 1966.

+970-***-***-*** / +970-***-***-***.

+970-***-**-***.

Mail adgw00@r.postjobfree.com / adgw00@r.postjobfree.com.

Qualification Highlights

B.Sc., Electrical Engineering, University of Jordan, Amman, Jordan; 1989

M.Sc. Electrical Engineering, University of Jordan, Amman, Jordan; 1994

20 years of demonstrated experience in Quality Assurance/Control of Projects MEP Systems.

Strong Project Management, Construction Management, Leading Project Teams & Subcontractors, Lead Project Testing and commissioning Plan, and Team work skills.

Courses; PMP (1995 & 2012), Primavera (2007), SCADA & PLCs (2001), Power Flow and Power Distribution (1995), Total Quality Management (2018), Internal Auditor-ISO 9001:2015(2016), Internal Auditor-ISO 14001:2015 (2016), OSHA Construction Industry Safety and Health Standards (2016).

High Computer Skills (Software and Hardware).

Fluent in both English and Arabic.



Contact this candidate