Project Control & Planning Engineer with more than 3 years of work experience in Execution of EPC projects includes Planning, Scheduling, Coordination, & Execution of Plant Shutdown in Petrochemical & Oil/Gas industry. Personal Info.
Phone: +968-********
E mail: adgvup@r.postjobfree.com
https://www.linkedin.com/in/
Vahora fesal idrish bhai 028a713b/
Date of Birth: 06 03 1993
Marital Status: Unmarried
Valid Indian Driving License.
Address
#03, Rahi Soc., Anand,
NR.Vahora Soc, Bhalej
road, Anand
388001, GUJ.
Skills
Languages Known:
English, Hindi, Urdu, Gujarati, Arabic
Computer Proficiency:
MS Office, SAP PM, CCMS, Primavera
Core Competency
In Execution of EPC Projects,
Plant Major Shutdowns/Turn Around,
Piping, Structure, Pipeline Installation.
HSE Trainings
HSE – Safety leader ship
H2S Escape & Awareness
Permit to Work – Applicant, PDO
Authorized Gas Tester
IFR, OSHA, TBT, ISO: 14001
Project Control & Planning Engineer
Experience & Roles Played
• Preparing of L4 Schedule using Primavera and Monitoring progress.
• Preparing the BOM required for the project and follow up with Procurement Division.
• Coordination with Head office, Design Consultant and Sub Contractor to complete the project according to schedule.
• Preparing Daily Progress, Weekly Progress & Monthly Progress Reports.
• Ensure that the work is carried out as per AFC, maintaining quality & safety.
• Hands on Experience in Execution activities such as. 1. Erection of Gas boot, Bulk Separators, AP flare, Pumps, Coolers etc. 2. Fabrication & Erection of CS, SS, DSS, SDSS, LTCS, GI & threaded Piping. 3. Installation of AG/UG Pipeline, flow line, internal FBE coated flow line. 4. Erection of Storage tanks & associated Piping/ Steel structure. 5. Erection of heavy steel structure, Pump shed, Platforms, Pipe racks.
• Preparing the presentations for Plant Shut downs.
• Arrangement of activities like hydro testing, pneumatic testing etc.
• Experience of using SAP PM & Completion of activities through CCMS.
Work History
1. May 2018 to Present – Project Control & Planning Engineer Project: C311527 – Construction Services project PDO, Yibal Khuff. Scope: Construction of 8 Nos Cs Gas & oil export line around 97km
& 10”GRE water export line.it around 11km length.
6”High pressure (28Nos.) flow line around 78km length (Well to RMS). 2. May 2017 to April 2018 – Project Control & Planning Engineer Project: C311657 – Bahja EPCC Cluster – PDO, Bahja. Scope: 10+ EPC Projects in 8 Major PDO South Production stations. Including Erection of Pumps, Vessel, Compressors, Flare etc., with associated Piping, Steel structures, Shed & AG/UG Pipeline/ Flow line. Periodic Plant Shutdowns, Yearly Turn Around, Partial Shutdowns etc. 3. December 2016 to April 2017 – Planning Engineer/ Coordinator Project: Bulk Liquid Storage facility – Mina (Dubai), Salalah. Scope: Construction, Installation, Testing & Commissioning of 11 nos. Storage Tanks (Includes Fuel Storage Tanks, Slop Tank, Fire Water Tank) 4. February 2016 to Dec 2016 – Shutdown Planner/ Coordinator Project: MNPS Shutdown for Heater Replacement Project – PDO, Marmul. Scope: Plant partial Shutdown which includes 55 nos. Tie ins to isolate Existing Heaters by installing isolation valves.
Education
August 2011 to May 2015 – Bachelor of Engineering (Mechanical), First Class. University: Gujarat Technological University, Tuwa, Gujarat. College: Engineering. College Tuwa, Gujarat.
Certification Course
Nov 2017 – Primavera P6, Ver. 8.2