Jeremiah Harms
*** **** ***** *******, ** *****
adgv45@r.postjobfree.com
Experienced In: Safety / Planning / Scheduling / Estimating / Procurement / Systems Turnover/ Quality Control/ Sub Contract Coordinator / Material Coordinating / Engineering / Pipefitting / Structural Steel / Fabrication / Rigging / Heavy haul / Heavy lifts / Project Management / Project Controls / Heavy Civil / Underground Piping / Trenching / Excavation / Design Build
Computer Skills:
Microsoft Office software: MS Word, MS Excel, MS Access, Adobe Pro
Primavera Software: P3 / P6
Microsoft Project
Smartplant Software: SP Review / SP Materials
SAP
Sharepoint / Teams / Visio
Employment History:
Sr. Refinery Maintenance Planner / Project Manager, Marathon Petroleum, Martinez, Ca 7-2019 –Current
Garyville, LA 7-2014 thru 7-2019 Marathon Petroleum LLC
oResponsible for the safety and performance of all personnel on turnarounds during execution.
oDeveloped Turnaround Work List and developed detailed work scope activities, with craft type,
estimated hours and plans.
oCreated detailed work order notifications in SAP, tied the work order elements to the appropriate WBS element (Settlement rule) scheduled & released work orders
oGenerated PO’s in SAP, forwarded to PM for approval, followed up with vendors to ensure they received the PO & notified the supervisor in need that the materials or services were successfully ordered / scheduled & provided them with an ETA
oBuilt workplans and the P-6 schedule for execution.
oHosted schedule logic reviews with all key stakeholders.
oUpdated the master schedule during execution, reviewed schedule analytics and made adjustments to resources as needed to complete projects efficiently.
oTechnically completed work orders in SAP upon completion of work
oScheduled & coordinated specialty services such as field machining, specialty NDE, Roll patches, nozzle add-ons, baffle straightening, exchanger re-tubes Etc…
oCoordinated all support equipment needed such as cranes, extractors, specialty rigging, fresh air trailers, nitrogen trucks, Vac trucks Etc…
oCoordinated task execution between operations & subcontractor supervision to maintain critical path
oPerformed daily job walks to ensure progress was reported accurately
oAssessed each job to understand the optimal plan to achieve turnaround premises including low cost and safety
performance.
oEnsured that environmental plans for (waste disposal, lead/asbestos abatement, frac tanks, vac trucks, etc.) where
developed.
oCreated bill of materials for assigned work, requisitioned material, and ensured all materials where delivered before
feed out of unit.
oAssembled work packages with detailed information for planning and execution.
oIdentified, reviewed and escalated high-risk activities.
oPrepared logistics plans for the TA.
oConducted schedule logic reviews with the team.
oConducted resource level reviews & produced hiring plans.
oWork with the Lead Scheduler to optimize the master schedule.
oCommunicated key issues and risks to the TA manager.
oResponsible for updating the schedule for assigned work activities.
oServed as the Quality Captain for my area of responsibility including all aspects of quality & systems turnover.
oProvided critique of turnaround activities after completion.
oParticipated in Lessons Learned and the look back process.
oBalanced and delivered results in the 5 performance areas of safety, environmental, quality, schedule and
cost.
oDelivered results against industry (Solomon) benchmarks in turnaround cost and duration.
oMaintained strong relationships with the entire team during times of high energy and stress.
oWorked with site experts to develop skill sets for equipment unique to the individual site.
oGenerated purchase requisitions for major equipment, bulk items and subcontractor services
oControlled requisitions from engineering, purchase & delivery
oResponsible for validating all information submitted by engineering before it is sent for client review, vendor bid & purchase
oAided in bridging the gap between schedule, procurement, engineering deliverables, engineering work package development, construction sequencing & construction work package development
oDeveloped material milestone reports & construction sequences based on engineering & procurement deliverables
oCoordinated engineering deliverables with construction management priorities to aid in developing engineering work packages based on priority & deliverable date
oSupervised the fabrication & organization of field installation work packages that included digital photos, BOM, special tools, man-hours & step by step instructions on completing the job task
Turnaround Specialist / Project Manager Shell / Motiva Norco, La 2-2012 –7-2014 Shell Chemicals
oResponsible for the safety performance of all personnel on a Turnaround block during execution.
oVerified work described in Turnaround Work List and developed detailed work scope activities, with craft type,
estimated hours and plans.
oAssessed each job to understand the optimal plan to achieve turnaround premises including low cost and safety
performance.
oEnsured that environmental plans for (waste disposal, lead/asbestos abatement, frac tanks, vac trucks, etc.) were
developed.
oCreated bill of materials for assigned work, requisitioned material, and ensured all materials where delivered before
feed out of unit.
oAssembled work packages with detailed information for planning and execution.
oBuilt workplans and the P-6 schedule for execution.
oHosted schedule logic reviews with all key stakeholders.
oUpdated the master schedule during execution, reviewed schedule analytics and made adjustments to resources as needed to complete projects efficiently.
oCreated, implemented & trained co-workers on the use of an electronic work package system (Shared document) used by all disciplines involved in package building in order to streamline & simplify the package building process and to keep all disciplines literally on the same page. (Planning, PEI, QC, Operations, Engineering Etc…) This requires the use of Adobe acrobat version 8 & excel (Simple but effective)
oImplemented the use of the electronic packages for operations during the TA for ease of permit writing
oIdentified, reviewed and escalated high-risk activities.
oPrepared logistics plans for the TA.
oEnsured compliance to plant orders, policies and procedures including, but not limited to Downstream One,
MOC, quality, and addenda processes.
oLoaded schedule logic to efficiently execute scope of work and resource level the plan.
oBuilt workplans and the P-6 schedule for execution.
oHosted schedule logic reviews with all key stakeholders.
oUpdated the master schedule during execution, reviewed schedule analytics and made adjustments to resources as needed to complete projects efficiently.
oCompleted the estimate of Direct Field Labor hours, overheads, materials, and equipment for assigned area.
oCommunicated key issues and risks to the TA Event Manager.
oResponsible for updating the schedule for assigned work activities.
oServed as the Quality Captain for my area of responsibility including all aspects of quality & systems turnover.
oProvided critique of turnaround activities after completion.
oParticipated in Lessons Learned and the look back process.
oIdentified opportunities to reduce turnaround work scope.
oPlanned and executed with low cost mindset.
oBalanced and delivered results in the 5 performance areas of safety, environmental, quality, schedule and
cost.
oDelivered results against industry (Solomon) benchmarks in turnaround cost and duration.
oMaintained strong relationships with the entire team during times of high energy and stress.
oWorked with site experts to develop skill sets for equipment unique to the individual site.
oGenerated purchase requisitions for major equipment, bulk items and subcontractor services
oControlled requisitions from engineering, purchase & delivery
oResponsible for validating all information submitted by engineering before it is sent for client review, vendor bid & purchase
oAided in bridging the gap between schedule, procurement, engineering deliverables, engineering work package development, construction sequencing & construction work package development
oDeveloped material milestone reports & construction sequences based on engineering & procurement deliverables
oCoordinated engineering deliverables with construction management priorities to aid in developing engineering work packages based on priority & deliverable date
Turnaround Planner Valero St. Charles, La- GDU, ULSD, HTHC TA’s 9-2010 –2-2012 Universal Personnel
oPlanned, estimated, scheduled & coordinated all turnaround activities to include safety, servicing exchangers, fin fans, columns, reactor catalyst change, vessels, heaters, stacks, rotating equipment, PSV’s, CCV’s, piping, retrofits Etc…
oBuilt workplans and the P-6 schedule for execution.
oHosted schedule logic reviews with all key stakeholders.
oUpdated the master schedule during execution, reviewed schedule analytics and made adjustments to resources as needed to complete projects efficiently.
oCreated detailed work order notifications in SAP, tied the work order elements to the appropriate WBS element (Settlement rule) scheduled & released work orders
oGenerated PO’s in SAP, forwarded to PM for approval, followed up with vendors to ensure they received the PO & notified the supervisor in need that the materials or services were successfully ordered / scheduled & provided them with an ETA
oTechnically completed work orders in SAP upon completion of work
oScheduled & coordinated specialty services such as field machining, specialty NDE, Roll patches, nozzle add-ons, baffle straightening, exchanger re-tubes Etc…
oManaged the organization & distribution of information such as engineering revisions to P&ID’s, isometrics, structural drawings, plot plans & field changes
oCoordinated all support equipment needed such as cranes, extractors, specialty rigging, fresh air trailers, Vac trucks Etc…
oCoordinated task execution between operations & subcontractor supervision to maintain critical path
oPerformed daily job walks to ensure progress was reported accurately
oCreated detailed work packages to include: Safety requirements, Scope of work, Work order, NDE requirements, isolation plans, P&ID’s, Iso’s, U-1 data forms, internal drawings, lift procedures, step by step execution plan, BOM’s, plot plan & photos
oUpdated & reviewed the master schedule daily
Supervisor / Quality Control / Piping Rhodia Quench Tower Project / Exxon Mobil NRD Project / Shintech 2009 -2010
Cajun Constructors 7-10 Thru 9-10 / Bay LTD 11-12-09 Thru 5-10-10 / Performance Contractors 4-28-10 Thru 7-4-10 / Shaw 5-7-10 Thru 6-10-10
oResponsible for the overall safety of all persons involved in the project; planning, scheduling, estimating, procurement, field engineering & retrofit of a new quench tower
oServed as the onsite project engineer in regards to spec clarification, design issues & engineering errors
oSupervised proper installation of all civil, structural, piping & mechanical equipment based on project specifications & engineering plans
oManaged the organization & distribution of information such as engineering revisions to P&ID’s, isometrics, structural drawings, plot plans & field changes
oCommunicated discrepancies to the client, submitted RFI’s & change orders
oProposed path forward suggestions associated with out of scope work, design changes & engineering errors
oField verified coordinates of the existing & newly installed structural steel to aid in accurate piping installation
oDesigned, drafted & fabricated piping supports
oProvided AS-Built, Redlined drawings as needed
oCoordinated sell-off / systems turnover of employers scope of work with client
oGenerated purchase requisitions for major equipment, bulk items and subcontractor services
oControlled requisitions from engineering, purchase & delivery
oResponsible for validating all information submitted by engineering before it is sent for client review, vendor bid & purchase
oAided in bridging the gap between schedule, procurement, engineering deliverables, engineering work package development, construction sequencing & construction work package development
oDeveloped material milestone reports & construction sequences based on engineering & procurement deliverables
oCoordinated engineering deliverables with construction management priorities to aid in developing engineering work packages based on priority & deliverable date
oSupervised the fabrication & organization of field installation work packages that included digital photos, BOM, special tools, man-hours & step by step instructions on completing the job task
Industrial Field Engineer Americas Styrenics- EB Max Turnaround 9-8-09 Thru 10-29-09
Shaw Group
oPlanned & Scheduled the installation of new piping systems, turnaround activities & catalyst change of an ethyl benzene reactor
oOperated the Smartplant model software used for reference by the field supervisors
oServed as the onsite project engineer in regards to spec clarification, design issues & engineering errors
oServed as systems turnover lead- Managed the organization, marking up of P&ID’s by system and facilitated the system sell off process (PSSR) with the client
oManaged the organization & distribution of information such as engineering revisions to P&ID’s, isometrics, structural drawings, plot plans & field changes
oFacilitated field changes by discussing the issue with the client, obtaining written approval on path forward suggestions agreed upon & incorporated all of the information into a change order package, then issued to the field for execution
oCoordinated all support equipment needed such as cranes, extractors, specialty rigging, fresh air trailers, Vac trucks Etc…
oCoordinated task execution between operations & subcontractor supervision to maintain critical path
oPerformed daily job walks to ensure progress was reported accurately
oDiscussed safety, work scope, execution, logistics, contractual disputes & contingency plans with team members & client
oCreated detailed work packages to include: Safety requirements, work order, NDE requirements, isolation plans, P&ID’s, Iso’s, U-1 data forms, internal drawings, lift procedures, step by step execution plan, BOM’s, plot plan & photos
oUpdated & reviewed the master schedule daily
Project Controls / Procurement / Material Coordinator Suncor Refinery Expansion 12-1-2008 Thru 7-6-2009
URS Corporation
oGenerated purchase requisitions for major equipment, bulk items and subcontractor services
oControlled requisitions from engineering, purchase & delivery
oResponsible for validating all information submitted by engineering before it is sent for client review, vendor bid & purchase
oAided in bridging the gap between schedule, procurement, engineering deliverables, engineering work package development, construction sequencing & construction work package development
oDeveloped material milestone reports & construction sequences based on engineering & procurement deliverables
oCoordinated engineering deliverables with construction management priorities to aid in developing engineering work packages based on priority & deliverable date
oSupervised the fabrication & organization of field installation work packages that included digital photos, BOM, special tools, man-hours & step by step instructions on completing the job task
oInput procurement schedule information into the P3 project schedule & updated as needed
Major Projects Planner Conoco Phillips SCR / WHR Project 8-1- 2007 Thru 11-2008
Universal Personnel
oPlanned & scheduled the fabrication, delivery & retrofit of a SCR / WHR reactor
oAttended design reviews & made suggestions based on plant layout & real estate
oOrganized, reviewed & submitted engineering requisitions for purchase
oSolicited vendor bids for fabricated items & services
oAuthorized vendors to proceed with fabrication or services & issued purchase orders
oVisited vendor shops as needed to verify progress & quality
oBuilt workplans and the P-6 schedule for execution.
oHosted schedule logic reviews with all key stakeholders.
oUpdated the master schedule during execution, reviewed schedule analytics and made adjustments to resources as needed to complete projects efficiently.
oDefined critical path activities
oHeld risk review & MOC meetings in addition to turnaround schedule meetings
oCoordinated all support equipment needed such as cranes, extractors, specialty rigging, fresh air trailers, Vac trucks Etc…
oCoordinated task execution between operations & subcontractor supervision to maintain critical path
oManaged the organization & distribution of information such as engineering revisions to P&ID’s, isometrics, structural drawings, plot plans & field changes
oPerformed daily job walks to ensure progress was reported accurately
oServed as systems turnover lead- Managed the organization, marking up of P&ID’s by system and facilitated the system sell off process (PSSR) with the client
oDiscussed safety, work scope, execution, logistics, contractual disputes & contingency plans with team members & client
oCreated detailed work packages to include: Safety requirements, Work order, NDE requirements, isolation plans, P&ID’s, Iso’s, U-1 data forms, internal drawings, lift procedures, step by step execution plan, BOM’s, plot plan & photos
oUpdated & reviewed the master schedule daily
Construction Engineer Shintech VCM Project 10-16-06 Thru 8-2-07
Shaw Group
oServed as the onsite project engineer in regards to spec clarification, design issues & engineering errors
oOperated the Smartplant model software used for reference by the field supervisors
oServed as systems turnover lead- Managed the organization, marking up of P&ID’s by system and facilitated the system sell off process (PSSR) with the client
oManaged the organization & distribution of information such as engineering revisions to P&ID’s, isometrics, structural drawings, plot plans & field changes
oFacilitated field changes by discussing the issue with the client, obtaining written approval on path forward suggestions agreed upon & incorporated all of the information into a change order package, then issued to the field for execution
oCoordinated all support equipment needed such as cranes, extractors, specialty rigging, fresh air trailers, Vac trucks Etc…
oCoordinated task execution between operations & subcontractor supervision to maintain critical path
oPerformed daily job walks to ensure progress was reported accurately
oDiscussed safety, work scope, execution, logistics, contractual disputes & contingency plans with team members & client
oCreated detailed work packages to include: Safety requirements, Work order, NDE requirements, isolation plans, P&ID’s, Iso’s, U-1 data forms, internal drawings, lift procedures, step by step execution plan, BOM’s, plot plan & photos
oUpdated & reviewed the master schedule daily
Inspections / Logistics Coordinator Belle Chasse Naval Air Base 9-2005 Thru 9-2006
HKA Enterprise
oHurricane recovery effort
oField engineer, site assessment, trailer tracking & set up
oRFO, moving applicants into temporary housing after set up was complete
oQC inspected units pre & post- move in
oCoordinated sub contractors in & out of the Belle Chasse Naval Air Base
Construction Engineer Conoco Phillips-ULSD Ponca City, Ok 9-27-05 Thru 10-14-05 & 5-2-05 Thru 9-12-05
Shaw Group
oPlanned & Scheduled the new installation of a ULSD unit & the associated turnaround tie-ins
oOperated the Smartplant model software used for reference by the field supervisors
oServed as the onsite project engineer in regards to spec clarification, design issues & engineering errors
oServed as systems turnover lead- Managed the organization, marking up of P&ID’s by system and facilitated the system sell off process (PSSR) with the client
oFacilitated field changes by discussing the issue with the client, obtaining written approval on path forward suggestions agreed upon & incorporated all of the information into a change order package, then issued to the field for execution
oCoordinated all support equipment needed such as cranes, extractors, specialty rigging, fresh air trailers, Vac trucks Etc…
oCoordinated task execution between operations & subcontractor supervision to maintain critical path
oPerformed daily job walks to ensure progress was reported accurately
oDiscussed safety, work scope, execution, logistics, contractual disputes & contingency plans with team members & client
oCreated detailed work packages to include: Safety requirements, Work order, NDE requirements, isolation plans, P&ID’s, Iso’s, U-1 data forms, internal drawings, lift procedures, step by step execution plan, BOM’s, plot plan & photos
Turnaround Planner / Pipefitter Foreman / Pipefitter Shell Norco / Motiva Convent / Shell Geismar 10-2002 Thru 4-2005
Turner Industries
oPlanned & Scheduled turnaround activities for the change-out of acid piping in the sulfur unit from CS to 304SS
oPlanned & Scheduled maintenance projects
oBuilt workplans and the P-3 schedule for execution.
oHosted schedule logic reviews with all key stakeholders.
oUpdated the master schedule during execution, reviewed schedule analytics and made adjustments to resources as needed to complete projects efficiently.
oInput estimated man-hour values, tasks & material descriptions into SAP
oOrdered, received & staged materials
oField sketched all isometrics used for the acid piping change-out
oSupervised piping crew during fabrication & installation during the turnaround
oCoordinated daily work scope with operations & relevant support crafts
oFabricated, installed, repaired piping systems & supports as needed
oPulled & serviced exchangers, made repairs on the coker, cat-cracker, reactor, various tanks, columns, drums, fin fans, process piping & pumps during turnarounds, maintenance & call-outs
oPerformed walk-downs on piping systems Pre & Post Hydro for sell off to client
oWorked with operations regarding safety, permits, sequence, inspections & environmental regulations
Turnaround Planner Dow Taft -Acrylics & Spu Turnaround 4-2000 Thru 10-2002
Shaw Group
oPlanned & Scheduled turnaround activities for the acrylics & spu turnaround
oOrganized and submitted engineering requisitions
oSolicited vendor bids for fabricated items and services
oSelected vendors based on reputation, location and availability
oAuthorized vendors to proceed with services & issued purchase orders
oCreated detailed work packages to include: Safety requirements, Work order, NDE requirements, isolation plans, P&ID’s, Iso’s, U-1 data forms, internal drawings, lift procedures, step by step execution plan, BOM’s, plot plan & photos
oInput values, tasks and material descriptions into MS Excel & Gemts
oOrganized Project plans, scheduled delivery of services and materials with vendors and subcontractors
oDefined critical path activities, worked with operations regarding safety, permits, sequence, inspections & environmental regulations
oUpdated & reviewed the master schedule daily
Pipefitter / Foreman / Turnarounds & New Construction 1995-2000
Bronco Construction / Performance Contractors / Turner Industries / MEI / Shaw / SLC Contractors /
S&B / Volks Constructors / Anderson Scaffolding
oFabricated, installed & repaired piping systems in accordance with project specific & industry standards
oPerformed walk-downs on piping systems Pre & Post Hydro for sell off to client
Education:
Associated Builders & Contractors
oWork Process Management
oComputerized Planning and Scheduling with P-3
oSupervision Developmental Skills
Certifications
oComputerized Planning & Scheduling- November 29, 2001
oPrimavera P3 Certification- February 8, 2005
oPrimavera P6 Certification- June 16, 2008- June 20, 2008
oNCCER certified pipefitter
Credentials
oCurrent TWIC card