Post Job Free
Sign in

Power Plant Operator

Location:
Makati, Philippines
Posted:
October 09, 2020

Contact this candidate

Resume:

CRISENCIO R. MAGDADARO JR. II

Discipline : ROLLER OPERATOR/STEEL FIXER

Date of Birth : 04 – March – 1978

Place of Birth : Cagayan De Oro City

Nationality : Filipino

Contact # : 094********

Email address : adgszt@r.postjobfree.com

QUALIFICATION

Secondary Graduate

AGUSAN NATIONAL HIGH SCHOOL

BATCH 1996

PROFESSIONAL EXPERIENCES

July 2013 – July 2016

HYUNDAI & SAMSUNG JOINT PROJECT

P.O.Box 12716, Ruwais, Abudhabi U.A.E

BAND SAW OPERATOR/STEEL FIXER/IRON WORKER/DUCT INSTALLER

Project: Nuclear Power Plant

To conduct machine and scale setting to properly monitor the weight of the cut materials based on the requirements.

Calculate the cutting length for every schedule of the item to be processed.

Responsible in preventive maintenance on machine.

Measure completed work pieces to verify conformance to

specifications, using micrometers, gauges, calipers,

templates and ruler.

Read work orders and production schedules to determine

specifications, such as materials to be used, locations of

cutting lines and dimensions and tolerances.

Load work pieces, plastic material or chemical solutions

into machines.

Turn controls to set cutting speeds, feed rates or table angles

for specified operations.

Turn valves to start flow of coolant against cutting areas or

to start airflow that blows cuttings away from kerfs.

Inform the superior in case of machine breakdown and other machine related problem.

Clean the machine after leaving the area

Clean the machine at the beginning and end of the shift.

Maintain the machine in good working condition.

Record the production data in the log sheet

Ensure that both the rigger and crane operator is familiar with the method of signal to be used.

Always use clear and distinct signals (either by the hand and radio) to control lifting operations in poor light conditions.

Be aware of the wind speed and direction and don’t forget to put barricade in the area.

Ensure that no load is to be lifted where the weight is not stated or unknown.

Familiar with lifting capabilities of the crane.

Check that the lifting equipment being used is in good condition and color coded.

Ensure tag lines are always attached to loads that are likely to swing.

Be aware of any obstruction within the crane radius and working area.

Check that the area around the load to be lifted is clear.

No personnel are below the load or stay under the suspended load.

Note: Machine used; US made by WF Wells-Semi-Automatic with 1” B1-Metal Blade, Carbide guide blocks, Manual vise operation, Normally controlled blade tension, Built in coolant system.

Blade Powered, Rotary cleaning brush, TEFC Motors-fused disconnect with low voltage protection.

Automatic end-of cut shut-off, quick & easy blade speed change, feed perssure monitor & regulator, electrcal to nfpa-79 standards, Safety standards.

IRON WORKER / DUCT INSTALLER

Installation of air duct supply and return to designated areas.

Assembly of air duct to straight and fitting of fabricate site constructions.

Hauling of air duct to designated area.

Installation of spiral duct and metal cladding.

Assist smoke and light air duct leak testing.

Can insulate of supply air duct and chilled water pipe.

Performed Lay-out of Air Ducts, offset and regular transition.

Calculate sheet metal bending allowance.

Able to lay-out, fabricate of square, rectangle and round duct.

Take actual measurement of different duct fittings,

Literate and understand any plan/ drawing related to ductworks.

Installation and assemble of ducts. Fixing the VCD, grills, lenear, diffusers and other kinds of duct works.

The work should check the drawing before starting the duct installation.

Check the duct elevation.

Work should coordinate with the foreman or the project engineer if there is any problem regarding to the project.

Check the drawing of the duct passage if there is no complete.

May 2008 – March 2011

AL HANI GENERAL CONSTRUCTION CO. (STRABAG INT’L+LIDCO)

BENGHAZI TRIPOLI LIBYA

ROLLER OPERATOR/ASST. ELECTRICIAN

Project: GENERAL CONSTRUCTION/HORIZONTAL (Roads, Curves and Gutters)

Operate Bomag Equipment for Compaction and Plaining.

Operate Bulldozer Caterpillar 6DR for Stockpiling.

Checked Equipment for Water Level, Oil Level, Break fluid etc.

OCT. 2006 – MAY 2007

AYTB (AL-YUSR TOWNSEND & BOTTOM) QATAR CO. LTD.

STEEL FABRICATOR

Cutting, fabricate and assemble any types of stirrups.

Installation of Beams, Slabs, Columns and Wall reinforcing steel bars.

Fabricate or bending and assemble any rebar works instructed by the supervisor at field site.

Assist any other civil related work required at site other than steel works,

Including carpentry, concreting and masonry.

AUG. 2005 – AUG. 2006

(CARE BUILDER COMPANY) (SUBCON OF SUMMA KUMAGAI INC.)

MASON HELPER

Project: Extension of De Lasalle University (15F)

Rebars, Concrete hallow blocks and tiles setting for boy’s and girl’s comfort

Room in 6th floor.

Lavatory and urine bowl setting.

FEB. 2002 – DEC.2002

DATEM CONSTRUCTION INC.

STEEL FIXER

Project: Makati Development Center

Fabricate all kinds of bars, plain, and deform bars and fabricate the order for inner or outer stirrups, vertical bar for column, dowel, and slabs bars, bottom bars,

top bars and beams.

Fabrication and installation

Followed the safety rules and regulation of the company.

JULY 2001 – DEC. 2001

BUILDERS FEDERAL PHILS. INC.

FABRICATOR

Fabrication of aluminum frame for door, window and partition for high rise

building.

Install glasses for every frame for door/window and partition.

Site installation.

MARCH – MAY 1999

ABB LUMMUS GLOBAL OVERSEAS CORP., SAN NICOLAS, ARUBA.

REBARMAN

Project: Coker Plant

As a re-barman, in charge for installation of steel reinforcement for footing

column, beam, slab, and wall.

In charge for bar bending in steelyard fabrication and direct installation of

re-bar for casting area.

Attend meeting with other worker and foremen to discuss matter and status

of the project.

JUNE – NOV. 1998

FIRST ASEAN METAL CORP.

INSULATOR

Apply hot and cold insulation after fabrication and installation.

JAN. – AUG. 1998

PEPSI COLA BOTTLING PLANT

YARD MAINTENANCE CREW

Responsible to arrange all damage cases, sweeping of all broken bottles and

deliver to stock are, and collect all reusable cases and deliver to bottling area.

Responsible also of all painting jobs at yard maintenance area.

Responsible also for re bar work, preparation of columns, tie beam and etc.

for plant expansion project.

APRIL – NOV. 1997

BISDAC DEVELOPMENT CORP.

ELECTRICAL HELPER

Project: Coresteel Pilipinas Corps.

Assist the electrician in installation of receiving station.

Assist in preparation of RSC conduit pipe and grounding installation.

Threading of RSC conduit pipe.

Assist in installation of current and potential transformer and chipping of

walls and floor for conduit pipe installation.

Assist in lighting installation.

FEB. 1996 – FEB. 1997

BISDAC DEVELOPMENT CORP.

REBARMAN

Project: Machine made Hollow Blocks

Preparation of materials for bending and fabricate as per design like columns, beams, walls, slab and etc.

SIGNATURE



Contact this candidate