CRISENCIO R. MAGDADARO JR. II
Discipline : ROLLER OPERATOR/STEEL FIXER
Date of Birth : 04 – March – 1978
Place of Birth : Cagayan De Oro City
Nationality : Filipino
Contact # : 094********
Email address : adgszt@r.postjobfree.com
QUALIFICATION
Secondary Graduate
AGUSAN NATIONAL HIGH SCHOOL
BATCH 1996
PROFESSIONAL EXPERIENCES
July 2013 – July 2016
HYUNDAI & SAMSUNG JOINT PROJECT
P.O.Box 12716, Ruwais, Abudhabi U.A.E
BAND SAW OPERATOR/STEEL FIXER/IRON WORKER/DUCT INSTALLER
Project: Nuclear Power Plant
To conduct machine and scale setting to properly monitor the weight of the cut materials based on the requirements.
Calculate the cutting length for every schedule of the item to be processed.
Responsible in preventive maintenance on machine.
Measure completed work pieces to verify conformance to
specifications, using micrometers, gauges, calipers,
templates and ruler.
Read work orders and production schedules to determine
specifications, such as materials to be used, locations of
cutting lines and dimensions and tolerances.
Load work pieces, plastic material or chemical solutions
into machines.
Turn controls to set cutting speeds, feed rates or table angles
for specified operations.
Turn valves to start flow of coolant against cutting areas or
to start airflow that blows cuttings away from kerfs.
Inform the superior in case of machine breakdown and other machine related problem.
Clean the machine after leaving the area
Clean the machine at the beginning and end of the shift.
Maintain the machine in good working condition.
Record the production data in the log sheet
Ensure that both the rigger and crane operator is familiar with the method of signal to be used.
Always use clear and distinct signals (either by the hand and radio) to control lifting operations in poor light conditions.
Be aware of the wind speed and direction and don’t forget to put barricade in the area.
Ensure that no load is to be lifted where the weight is not stated or unknown.
Familiar with lifting capabilities of the crane.
Check that the lifting equipment being used is in good condition and color coded.
Ensure tag lines are always attached to loads that are likely to swing.
Be aware of any obstruction within the crane radius and working area.
Check that the area around the load to be lifted is clear.
No personnel are below the load or stay under the suspended load.
Note: Machine used; US made by WF Wells-Semi-Automatic with 1” B1-Metal Blade, Carbide guide blocks, Manual vise operation, Normally controlled blade tension, Built in coolant system.
Blade Powered, Rotary cleaning brush, TEFC Motors-fused disconnect with low voltage protection.
Automatic end-of cut shut-off, quick & easy blade speed change, feed perssure monitor & regulator, electrcal to nfpa-79 standards, Safety standards.
IRON WORKER / DUCT INSTALLER
Installation of air duct supply and return to designated areas.
Assembly of air duct to straight and fitting of fabricate site constructions.
Hauling of air duct to designated area.
Installation of spiral duct and metal cladding.
Assist smoke and light air duct leak testing.
Can insulate of supply air duct and chilled water pipe.
Performed Lay-out of Air Ducts, offset and regular transition.
Calculate sheet metal bending allowance.
Able to lay-out, fabricate of square, rectangle and round duct.
Take actual measurement of different duct fittings,
Literate and understand any plan/ drawing related to ductworks.
Installation and assemble of ducts. Fixing the VCD, grills, lenear, diffusers and other kinds of duct works.
The work should check the drawing before starting the duct installation.
Check the duct elevation.
Work should coordinate with the foreman or the project engineer if there is any problem regarding to the project.
Check the drawing of the duct passage if there is no complete.
May 2008 – March 2011
AL HANI GENERAL CONSTRUCTION CO. (STRABAG INT’L+LIDCO)
BENGHAZI TRIPOLI LIBYA
ROLLER OPERATOR/ASST. ELECTRICIAN
Project: GENERAL CONSTRUCTION/HORIZONTAL (Roads, Curves and Gutters)
Operate Bomag Equipment for Compaction and Plaining.
Operate Bulldozer Caterpillar 6DR for Stockpiling.
Checked Equipment for Water Level, Oil Level, Break fluid etc.
OCT. 2006 – MAY 2007
AYTB (AL-YUSR TOWNSEND & BOTTOM) QATAR CO. LTD.
STEEL FABRICATOR
Cutting, fabricate and assemble any types of stirrups.
Installation of Beams, Slabs, Columns and Wall reinforcing steel bars.
Fabricate or bending and assemble any rebar works instructed by the supervisor at field site.
Assist any other civil related work required at site other than steel works,
Including carpentry, concreting and masonry.
AUG. 2005 – AUG. 2006
(CARE BUILDER COMPANY) (SUBCON OF SUMMA KUMAGAI INC.)
MASON HELPER
Project: Extension of De Lasalle University (15F)
Rebars, Concrete hallow blocks and tiles setting for boy’s and girl’s comfort
Room in 6th floor.
Lavatory and urine bowl setting.
FEB. 2002 – DEC.2002
DATEM CONSTRUCTION INC.
STEEL FIXER
Project: Makati Development Center
Fabricate all kinds of bars, plain, and deform bars and fabricate the order for inner or outer stirrups, vertical bar for column, dowel, and slabs bars, bottom bars,
top bars and beams.
Fabrication and installation
Followed the safety rules and regulation of the company.
JULY 2001 – DEC. 2001
BUILDERS FEDERAL PHILS. INC.
FABRICATOR
Fabrication of aluminum frame for door, window and partition for high rise
building.
Install glasses for every frame for door/window and partition.
Site installation.
MARCH – MAY 1999
ABB LUMMUS GLOBAL OVERSEAS CORP., SAN NICOLAS, ARUBA.
REBARMAN
Project: Coker Plant
As a re-barman, in charge for installation of steel reinforcement for footing
column, beam, slab, and wall.
In charge for bar bending in steelyard fabrication and direct installation of
re-bar for casting area.
Attend meeting with other worker and foremen to discuss matter and status
of the project.
JUNE – NOV. 1998
FIRST ASEAN METAL CORP.
INSULATOR
Apply hot and cold insulation after fabrication and installation.
JAN. – AUG. 1998
PEPSI COLA BOTTLING PLANT
YARD MAINTENANCE CREW
Responsible to arrange all damage cases, sweeping of all broken bottles and
deliver to stock are, and collect all reusable cases and deliver to bottling area.
Responsible also of all painting jobs at yard maintenance area.
Responsible also for re bar work, preparation of columns, tie beam and etc.
for plant expansion project.
APRIL – NOV. 1997
BISDAC DEVELOPMENT CORP.
ELECTRICAL HELPER
Project: Coresteel Pilipinas Corps.
Assist the electrician in installation of receiving station.
Assist in preparation of RSC conduit pipe and grounding installation.
Threading of RSC conduit pipe.
Assist in installation of current and potential transformer and chipping of
walls and floor for conduit pipe installation.
Assist in lighting installation.
FEB. 1996 – FEB. 1997
BISDAC DEVELOPMENT CORP.
REBARMAN
Project: Machine made Hollow Blocks
Preparation of materials for bending and fabricate as per design like columns, beams, walls, slab and etc.
SIGNATURE