Job Objective

To integrate my current professional experience and transferable skills at middle Management level assignment, in Project Management and / or Operation domain for growth oriented Power Plants industry.

Professional Synopsis

Bachelor Of Engineering (Mechanical) and having Boiler Proficiency Certification with 19+ years of combined experience in Operation, Maintenance, and Project Management in Thermal Power Plant industries specifically CFBC / AFBC & WHRS Boilers and Steam Turbines and related auxiliaries for utility of Plants.

Actively participated in Thermal Power plant Operation of capacity 92 MW, 50 MW, 39.5 MW, 33MW & 12MW.

Displayed skills in managing and analyzing healthiness of Power Plant in order to ensure smooth uninterrupted Power plant operation by added skills in coordinating for predictive, preventive maintenance aspects of all assets with considerations and practices as per various Du Point Safety Standards.

Actively participated in various phases of Project Management domain, specifically managing the expansion projects including erection/commission of mechanical equipments.

An effective communicator with excellent relationship management skills and strong analytical, problem solving & organizational abilities. Confident for acquired transferable skills mainly Communication and Organizational that extend in variety of environment – fields.

Working knowledge of SAP-PP Module., Du Pont safety various standards.

Areas of Expertise/Exposure-

Power Plant Operation

Operating Thermal based Power plant Boilers – Turbines and related auxiliaries supported by modern DCS control systems – Foxboro I/A series and Maxcontrol Automation from ABB.

Taking care of all the aspects for smooth Operation of Power plant during shift duty cycle in order to maintain uninterrupted steam and power supply as per required demand of the Process plant ensuring optimum cost and fulfilling all the regulatory requirements for plant safety and environmental compliance.

Operation of AFBC and CFBC Boilers & WHRS Boiler, Extraction cum back-pressure, and Extraction cum condensing steam turbine.

Shift Planning & Control, Co-Ordination with support services and Maintenance Department, maintaining Check lists, plant process related data Compilation, Deciding and Implementing Autonomous Maintenance according to WCM norms, and resource planning specifically, man-power planning and management.

Changeover of Boiler, Turbine & its Auxiliaries, Troubleshooting, Preventive actions, Identification of Abnormality and Corrective actions, Preservation of Stand-By Equipment

In-depth expertise of Boiler and Turbine interlocks and critical parameters.

Installation & commissioning

Handling erection & commissioning of mechanical static and rotating equipments independently.

Testing the designed equipments against specified criteria and ensuring their operability at desired capacity meeting the specifications.

Troubleshooting and resolving for solutions of technical problems arising in the equipments and related system during commissioning phase.

Quality Control

Ensuring adherence to quality standards (ISO) defined guidelines, requirements and maintaining all related records and documents.

Implementing latest quality tools and executing process enhancement projects

Identifying areas of quality failures and take steps to rectify the system.

Team Management

Able to implement interpersonal skills in order to take lead for a team assigned for specific objective in order to achieve the expected objective for organization in time with remarkable quality parameters. Able to identify the hidden potential across all team members and allocating the right task to right person based on competency level and organization objective requirements.

WORK HISTORY

Actively engaged for various roles in below mentioned Organizations during respective periods of assignment exploring following skill sets.

Ensure effective control of plant operating parameters within the control limits.

Coordinate, monitor & control plant operation activities to improve existing operational efficiencies, eliminate deviations in critical process parameters.

Minimize operational losses of the raw materials & chemicals.

Raw material inventory Management.

Ensuring optimum plant availability by co-coordinating Predictive, preventive and breakdown maintenance work and Implementation of corrective actions.

Leading a special task for Annual Inspection of Boilers through Government Authority.

Compiling daily Power & Steam Generation report, Import / export report.

Root Cause Analysis with implementation of the identified corrective measures.

Ensuring redundancy of critical equipments by keeping stand-by Boilers, Turbine and related auxiliaries.

Planning & leading of Boiler & Turbine’s Changeover activities.

Monitor safety requirements for plant operating personnel and the equipments.

Having track records of successfully, aggressively participating and handling emergency situations during Annual Shut down activities of Boilers.

Internally transferred from Gujarat Cement Works – Kovaya Gujarat to Rajashree Cement Ltd –Karnataka (UltraTech Cement ltd - A Unit of Aditya Birla Group of company) as Assistant Manager (Shift In charge) - Power Plant Operation W.e.f. 31st May 2018.

Rajashree cement works plant is having following set up including its own power plant. The total power plant capacity is 61 MW, which consists of -

2 X 115 TPH C.F.B.C. boiler U-Beam Technology @ 111 kg/cm2 & 545 C Temp. Make:- Thermax Ltd.

2X25 MW condensing type Steam Turbine set with Air cooled condenser Make:- HTC-China

220 TPH coal handling plant

22 M3/Hr D.M.Plant.

11.00 MW WHRS Boiler & Turbine

Gujarat Cement Works – Kovaya (Ultra Tech Cement ltd. - A Unit of Aditya Birla Group of company) as Sr. Engineer (Shift In charge) - Power Plant Operation from 25th December 2008 to 28th May 2018.

Ultra Tech Cement plant - the largest cement manufacturing plant at a single location with installed capacity of over 5.2 million tons of clinker / cement per annum with a captive power plant having installed capacity of 92.0 MW. It manufactures a range of the premium brand of cement, which caters demands of domestic, as well as Export markets.

The power plant consists of

4X 115 TPH C.F.B.C. boiler with Hot cyclone @ 100 kg/cm2 & 535 C Temp. Make:- DBG China

4X23 MW condensing type Steam Turbine set Make:- HTC-China

260TPH coal handling plant

60M3/Hr D.M.Plant.

PHILLIPS CARBON BLACK LTD (A Unit of RPG Group, Palej Dist. Bharuch, Gujarat) as Assistant Manager - Power Plant Operation & Maintenance from 17th December 2007 To 22nd December 2008.

Involved in Operation of 12 MW Captive Power Plant and 8 MW Export to Grid (GEB) having EMERSON DCS control system involving following equipments.

1 X 65 TPH, 66 Kg/Cm and 490 C Gas Fired WHRG Boiler. (Make-Thermal Systems Pvt. Ltd.-Hyderabad)(Control – EMERSON Distributed Control Systems)

1 X12 MW, Bleed cum condensing type steam turbines synchronized with Grid (Triveni Engg. -Make) (Control – 505 Digital Controls, Woodward Governor, U.S.A.)

2 x 76 M3 /hrs. & 85 kg/cm2 Boiler Feed water pump. (KSB make)

1 x 14.7 M3/min & 7kg/cm2 Reciprocating compressors (KG-Khosla-Carpelle)

Birla Cellulosic (A Unit of Grasim Industries Ltd., Kharach, Dist. Bharuch, Gujarat) as Power Plant Operation Engineer (Shift In charge-BOE) from 22nd May 2006 To 15th December 2007

Involved in Operation of 33 MW Co-Generation power plant having MAX -1000 Automation DCS control system having following equipments.

2 X 100 TPH, 65 Kg/Cm And 485 C Atmospheric Fluidized Bed Combustion Boiler. (BHEL-Make) (Control –MAX1000 Distributed Control Systems, U.S.A.)

2 X16.5 MW, Extraction cum Back Pressure Steam Turbines. (Shin Nippon, Japan-Make) (Control – 505 E Digital Controls, Woodward Governor, U.S.A.).

4 x 125 M3 /hrs. & 100 kg/cm2 Boiler Feed water pump. (KSB make)

3 x 14.7 M3/min & 7kg/cm2 Reciprocating compressors (KG-Khosla-Carpelle)

NIRMA LTD., Bhavnagar, Gujarat from February – 1999 to May 2006. (Jr. Panel officer-Utility)

Involved in Operation of 39.5 MW Co-generation power plant having DCS system from FOXBORO - I/A series. Able to interpret Engineering drawings and Actualizing based on P & ID, Piping isometrics, G.A. Drawings, Layout drawings, Line list.

Power plant and Utility section involves following equipments.

3 nos. CFBC IJT and Lentjes make Boilers, each of 100 TPH, 105 bar press. 505 deg C.

2 nos. Shin Nippon make double extraction cum condensing type steam turbines each of 16.5 MW.

1 no. 6.5 MW BHEL make back pressure type steam turbine.

4 nos. Turbo driven CO2 gas Screw compressors, GHH Borsigh make, 35000 NM3/Hr capacity.

3 nos. Sulzar make 165 bar press. 165 M3/Hr capacities Turbo driven Boiler Feed Pumps.

2 nos. Atlas Copco make screw air compressors 7200 NM3/Hr.

3 nos. K.G.Khosla make Reciprocating air compressors 1250 NM/Hr.

3 nos. IR make reciprocating air compressors 700 NM3/Hr.

EDUCATIONAL BACKGROUND

ACADEMIC:

Bechlor of Mechanical Engineering from S.S.Engineering college, Bhavnagar with First Class (63.33%) in April -2012 affiliated under Bhavnagar University.

Diploma in Mechanical Engineering from Sir Bhavsinhji Polytechnic, Bhavnagar in First Class with Distinction (71.60%) in October – 1998 under Technical Examination Board – Gandhinagar

PROFESSIONAL CERTIFICATIONS - TRAINING

Boiler Proficiency Second Class Certificate from Gujarat in July-2007.

CPMT from Technical Examination Board – Gandhinagar.

Computer Proficiency – MS – OFFICE and Internet

Working expertise of SAP- PP Module, WCM and Du Pont safety standards

PERSONAL DETAILS

Date of Birth – 13th July 1978

Sex - Male

Marital Status – Married.

Permanent Address - Sahajanand Society – 2

Block no. – ST-12, Street no. – 10

Behind Bus Station

Junagadh, Gujarat, India.

Present Salary - 11.19 Lacs. Per annum.

Expected Salary - As per Company Policy and my experience.

References - Provided upon request.



Contact this candidate