To pursue a career in Building Construction field and obtain a
challenging position in any Architectural/Engineering Facade Works fitting with my related experienced, and enhance knowledge and Educations. Mr. Danilo Gregorio is a professional experienced in the Construction and Quality Supervision of Building Façade. He posses over 11 years professional experience in building construction in the Gulf Region in a landmark projects in UAE, Riyadh, KSA, in Doha, Qatar and Philippines. He has a strong work ethic and determination on any problematic situation and capable of working under pressure. He can able to manage a multi-tasking works and having full knowledge in construction/installation process with an extensive experience on inspection activities and coordination with contractor, consultant and clients. He is also familiar with American and British codes. 1995-2000 : Bachelor of Science in Electronics and Communication Engineering. (BSECE)
Technological Institute of the Philippines
936 Aurora Blvd. Cubao, Quezon City.
1991-1994: Marine Engineering
Technological Institute of the Philippines
936 Aurora Blvd. Cubao, Quezon City
Danilo Suba Gregorio
PERSONAL INFORMATION
Age : 46 years old
Date of birth : 24 April 1973
Place of birth : Manila, Philippines
Nationality : Filipino
Civil Status : Married
Permanent address:
Block 1 Lot 15 Parkdale
Subdivision Phase 1 Classic 1-A
Imus Cavite
Philippines 4103
CONTACTS
Mobile Phone Nos.:
Email Address:
adgmlr@r.postjobfree.com
EDUCATIONAL ATTAINMENT
SUMMARY OF QUALIFICATIONS
OBJECTIVE
Understanding the project in terms of scope, milestone and methodology. Coordination of work among trade supervisors assigned to ensure productivity is maximized.
Ensures Inspections and tests are conducted as per approved ITPs.
Performs random in process surveillance of ongoing structural works.
Performs random inspection of completed works.
Monitors inspection and testing register and monitor for respective problems, defects & non conforming works.
Performs technical audits assisted by QA Team;
Issues and closes out non- conformance reports.
Reviews proposed remedial actions and representative measures for non- conformance reports.
Prepare QC related reports including statistical analysis.
Conduct daily site walks of the construction site looking at the quality control aspects.
Perform other related tasks that may be assigned from time to time.
WORK EXPERIENCE
WORK
EXPERIENCE
MDC-BBI JV
MDBI
Position: QC Façade
Inspector
Period:
October 22, 2018 to
Present
Project Handled:
ATG Diamond
Ayala Triangle Makati
Philippines
DUTIES AND RESPONSIBILITIES
Mr. Danilo S. Gregorio shall be incharge of the over all management of work and function on Project site. He shall coordinate with SBSI home office and Plant Manager regarding the supply of materials, Tools, Equipment as well as other concerns relative of the project. He shall conduct Periodic inspections to verify the accuracy of accomplishment report submitted to him by the Project in-charge, QAQC, Safety in-charge. He shall attend the operations and coordination meetings as well as other meeting as per call by management and General Main contractor and shall be relay information SBSI Project Director.
WORK EXPERIENCE
ADMIRAL PROJECT
Roxas Boulevard Manila
Position: Facade
Assistant Project Manager
Period:
January 25, 2018 to
October 20, 2018
DUTIES AND RESPONSIBILITIES
Assist the Project Manager with Developing site Organization charts and project manpower requirements
With the Planning Engineer, prepare detailed work program and establish material procurement schedule.
With the Project Manager, initiate the mobilization of resources for its facilities and project set – up.
Implement construction program as directed by the Project Manager.
Prepare monthly outlooks of manpower and material requirements
Review daily work schedule, equipment and advise on all issues affecting project completion particularly quality, costs and schedules.
Review construction drawings and resolve any discrepancies with Engineering and/or the consultant.
Source materials required in accordance with specifications and prepare submittals for consultant’s approval
Monitor safety performance of all personnel on site and recommend improvements to safety procedures.
Attend all consultant Inspections and undertake necessary follow-up. WORK EXPERIENCE
Construction Development
Company LLC
Position:
Site Façade Engineer
Period:
July 14, 2016 to December 1, 2016
Project Handled: Administrative
Building 2 / AS2 /NPP
Doha, Qatar
DUTIES AND RESPONSIBILITIES
Inspections of delivered materials, installed curtain walls panels, structural support framework, fixing, insulation, weather barrier, fire stopping and architectural metalwork.
Conduct internal and external site inspection of mock-ups, benchmarks and completed works installations.
Monitoring specialist subcontractor’s activities to ensure correct sequencing & methods are undertaken.
Responsible for the preparation and issuance of reports site surveillance deficiency reports (SDR) and No-Conformance report
(NCR), Façade Site Inspection Reports and Summarize (updates of closed and open issues).
Supervise and guide contractor work through site surveillance.
Monitor site operation to confirm safe practices and proper coordination with other trades and accordance with the existing HSE procedures.
Assist in ensuring that installations meet specification and agreed quality benchmarks.
Liaise with specialist subcontractor regarding site issues and workmanship.
Monitor the quality of materials, workmanship and methods used for installation at are in accordance to approved specifications, shop drawing and method statements.
Perform Inspection Request in a timely manner and provide reports to confirm compliance with approved specifications, drawings and methods, or otherwise.
Prepare records of progress and highlight site issues that maybe slowing the progress of works.
Review specification, drawing and method statement.
Check and monitor daily manpower by the contractor at site.
Report to Façade Manager and discuss proposed corrective actions for the closure on NCR’s and other façade quality issues.
Review Documents such as detail drawings, method statements and Inspection and Test Plan (ITP’s) and quality procedure.
Inspection and witnessing of site testing such as pull-out test, non- destructive testing of welds, field water hose test and field air infiltration test.
Evaluate problems and make initial recommendations for possible corrective action
WORK EXPERIENCE
KEO International Consultants
Position:
Façade Site Inspector
Period:
Aug. 25, 2014 to June. 2016.
Project Handled:
Qatar Petroleum District
Doha, Qatar
DUTIES AND RESPONSIBILITIES
Understanding the project in terms of scope, milestone and methodology. Coordination of work among trade
supervisors assigned to ensure productivity is maximized.
Deployment of area targets. Review operations to promote safety and efficient utilization of labor, plant and materials.
Ensure that the labor force is instructed in methods of working to comply with company procedures, method
statements and safe working practices.
Carry out safety toolbox talks as directed by the safety officer.
Assist in the preparation of works instructions and method statements for works. Feedback comments or changes required to the description of the activities.
Analysis variances whenever noted on site for the following and be able to document such variances if influenced by unforeseen site conditions:
a. Manpower productivity
b. Equipment utilization
c. Fuel consumption for equipment
d. Variance of equipment loading and manpower loading.
Monitoring and preparation of weekly and monthly reports for submission to the Project superintendent inputs relating to his assigned trade on the ff:
a. Potential variation orders as seen on site relating to the AFC drawing being referred for construction
b. Construction problems
c. Work requirement
Ensuring rectification and closing issued Corrective Action/Preventive Action Required (CAPAR) raised
internally.
Maintain good relationships with the Client’s representative.
Maintain good industrial relations practices to comply with company policy and avoid undue conflict with the labor force.
Conduct weekly work and safety coordination meeting to be attended by all domestic and nominated subcontractors in his assigned area.
Coordinate with Engineering Group or the Project Superintendent for early resolution of technical queries of subcontractors of various disciplines
WORK EXPERIENCE
SAMSUNG C & T- CCE JV
Position:
CURTAIN WALL/FAÇADE
ENGINEER
Period:
November 2012 to October
2014
Project Handled:
TADAWUL
KAFD – King abdhula financial
distric at Riyadh
DUTIES AND RESPONSIBILITIES
Duties and responsibilities:
Reporting to: QA/QC Manager (BUILDING)
DUTIES: To ensure the quality of the station main arrangement works are consistent with the consortium's policy requirements together with the client's Specifications. Ensuring that all QA/QC matters are in accordance with head office QA/QC System.
Carry out inspection with site engineers & subcontractors in accordance with Inspection Test Plan (ITP) drawings etc. and ensure correct documentation is prepared for Inspection Test Request (ITR)
Assist with site engineers over materials and ensure that correct materials approval documentation is in place for Engineers review.
Follow up non-conformance reports and to ensure
recommended actions are acted upon before closure by Engineer.
Coordinate quality matters with all the site engineers, sub- contractors and vendors.
Coordinate rejected (ITR’s) when required and liaise with head office QA/QC to closure point.
Verify that the quality related site activities are in accordance with the applicable method statements, drawings, codes and standards.
Liaise with head office on quality audits and inspections.
Assist in the implement the QA/QC management procedures at site.
Ensure all quality control documentation is complied and completed for handover to head office QA/QC for Engineers review and approval.
Ensure The safety is adhering to at site
WORK EXPERIENCE
Obayashi Kajima Yapi
Merkezi
Position: QA/QC Engineer
LOCATION: P.O. Box 182845,
Dubai, United Arab Emirates
PROJECT: Dubai Metro Project
DURATION: AUGUST 28, 2008
TO APRIL 10, 2011
DUTIES AND RESPONSIBILITIES
On site administrator of the QA/QC Program for 47-storey building in Makati city Philippines. A stick curtain wall, punch windows, aluminum louvers, and cladding on HIGH-RISE office residential building
Responsibilities includes full authority to order site work stoppage as deem necessary, over all approving authority for subcontractor works or Supplied materials, Submittals, etc.,
Offers rectification methodology for defective works to ensure satisfaction of consultant/owners.
Prepares punch-listing reports on installed aluminum windows, doors, curtain walls, Louvers, claddings.
Prepares rectification work and progress reports.
Observes site safety practices.
Supervises and monitors rectification works
(dismantling/installation) of curtain wall and punch windows prior to water test.
Supervises water testing on installed window panels, based on ASTME 1105-23, Standard Test Method for Field
Determination of Water Penetration of installed windows and curtain wall.
Prepares inspection report, documentation of water testing reports, rectification reports and non- compliance report to be submitted to the client.
WORK EXPERIENCE
HILLMARC’S CONSTRUCTION
COMPANY
Position: Facade
QA/QC Engineer
Period:
July 2007 to August 2008
Project Handled:
Joya Lofts & Tower at Rockwell
center Makati City Philippines
DUTIES AND RESPONSIBILITIES
Check if header flashing is properly installed..
Check the installation of flap gasket. Length must be equal to pressure
plate.
Check the weep holes, must free from any blockage
(size:5 x 18mm)
Check the screws at pressure plate; we used 12 x L
(PHSTS)
Check the continuity of sealant bed with backer rod at glass.
Check the weep holes of pressure plate cover it must be at the bottom of the cover and free from any
blockage. Check the size of weep holes.
Check the continuity of the push-in/wedge gasket
Check if there is bulb gasket (EPW 284) at header
(subhead)
Check if there is a sealant in between spigot and mullion prior to installation and bolt head nut.
Must have aluminum filler (should be anodized finish) at every mullion jamb,
Contact on aluminum
Check weep holes of sill transom, must be free from any blockage or miss- aligned sill transom.
Check the installation of sill flashing.
Check if there is sealant applied in between
Must be well sealed
Check weep holes, must be free from any blockage
Check the rubber stopper screwed L/4 of the section.
Screws must be head sealed/thread must have
sealant prior to installation.
Check the installation, compression and continuity of gasket. Weather sealant. Structural sealant.
Check if there is powder coated aluminum filler at every operable window opening, fastened at pressure plate. Setting block and weather seal.
Check weep holes (not acceptable if done at site) at operable window perimeter, must be free from any
blockage. Powder coated aluminum filler at operable window perimeter must be free from any blockage.
WORK EXPERIENCE
ARLO ALUMINUM COMPANY
Unit 903 Prestige Tower, Emerald
Avenue Ortigas Center, Pasig City
Philippines
Position: Facade
Inspector
Period:
March 2007 to September 2007
Project Handled:
Joya Lofts & Tower at Rockwell
center Makati City Philippines
DUTIES AND RESPONSIBILITIES