VIGNESWARAN M
Email: adgm1j@r.postjobfree.com
Mobile: +91-875*******, 904-***-****
OBJECTIVE
To obtain a mechanical engineering position in a challenging environment where i can utilize my skills, knowledge and experience to provide significant contribution CAREER CONTOUR
EMPLOYER DESIGNATION LOCATION JOB PERIOD
1 Dickinson Group Of Companies Mechanical Engineer Mufulira,
Zambia
June 2019 – Sep 2019
( 4 Months)
2
Sterlite Copper,
Vedanta Resources Limited
Copper Smelter & Refinery (4 LMTPA)
Mechanical Engineer
Tuticorin,
Tamilnadu
Feb 2012 – June 2018
(6 Years 4 months )
3
Applicomp India Limited
(Videocon)
Graduate Trainee
Bangalore,
Karnataka
July 2011 – Aug 2011
(2 months)
PROFESSIONAL SUMMARY
A result driven professional with 6 + years of experience in Plant Maintenance, Project Planning, Project Management, Installation/Commissioning, Resource Deployment, Documentation Management, Contract Management, Asset Optimization, Spares Planning & Procurement, Shutdown Management and Inventory Control
Deft at handling Installation, Erection & Commissioning, Maintenance of field equipment s, and other various Rotary and Stationary machineries
Well versed with the concepts of handling various Pumps, Blowers, Air Compressors, Furnace, Drives, Fan, Heat exchanger s, Chillers, Cooling towers and Valves
Proficiency in handling, suggesting maintenance strategies, procedures and methods, diagnosing breakdown problems, monitoring and controlling maintenance costs
Facilitating the reliable and robust maintenance and achieving higher availability and improving OEE of the plant
Ability to take cross functional responsibility and an effective team player
Excellent relationship management, analytical and negotiation skills with deftness in swiftly ramping production and maintenance operations
Hands-on experience in Sap (PM&MM) modules- PM Processing, Workflow, Service Management, Materials Planning, Purchasing, Inventory Management and Invoice Verification
To achieve maximum reliability and availability of all mechanical equipment s in the plant
Participated in Risk analysis, RCA, Hazop,FMEA, TPM,OEE,5S, KAIZEN,CIP etc., AREAS OF EXPERTISE
Effectuating Predictive, Preventive breakdown and Pro-active Maintenance of Plant assets, Conducting periodic checks to ensure performance of various equipment s.
Hands on experience in Static and Rotary equipment’s like Centrifugal pumps,Fans, Blowers, Air Compressors, Heat exchangers, Chillers, Cooling towers, Valves and Piping s, Agitators, Drives and gear box.
Expertise in Replacement & Maintenance of Electric Arc Furnace, Rotary Furnace, and Water cooled double hood panels, Waste heat recovery Boiler and Heat exchangers.
Condition based monitoring for all rotary equipment s also having good knowledge in Hydraulic
& Pneumatic systems Maintenance, Overhauling & Equipment s Procurement
Maintenance, Fabrication, Erection of Structural, Low pressure & High pressure pipe lines, Ducts, layout designs, and other heavy fabrications
Delegation of maintenance jobs on daily basis and supervising all activities for completing it by giving emphasis on safety
Prepares mechanical maintenance reports by collecting, analyzing, and summarizing information and trends
PROJECT MANAGEMENT/DESIGNING & PROCESS ENHANCEMENT
Experienced in Asset Optimization tools like, LAM (Linear Asset Management – mainly piping circuits), VED (Vital, Essential & Desirable – classification of spares), BOM (Bill of material)- Mapping against equipment s, FMEA, ECA, MOC
Root cause analysis for the failure and implementing the recommendation (CA & PA) to obtain the desired result. Gathering product specifications & designing and modifying / upgrading existing designs
Conversant with important standards and codes like ANSI, DIN,ASME,ASW,API and condition monitoring techniques such as vibration analysis, thickness measurements, NDT.
Responsible for the calibration of QC/Equipment s inspection and engage Calibration database adding new equipment s, deleting broken pieces, etc.
Reviews work instructions (SMPs), Work with Department Area Representatives and supervision to help create and maintain all maintenance procedures SHUTDOWN PROJECTS HANDLED
Successfully carried 13.5MVA Furnace rebuild project in ZIMPLATS PLATINUM MINES, Zimbabwe .The rebuild consists of replacing the entire furnace crucible and wrap around equipment s,structural steels, piping s, Ducting, pumps and fans
Successfully carried Replacement of Entire Rotary furnace’s in STERLITE COPPER, VEDANTA RESOURCES LIMITED, Tuticorin within scheduled time with all safety measures. (Pierce.smith.converter / Slag cleaning furnace / Anode furnace). MAJOR PROJECTS HANDLED
Complete Overhauling of Blowers (Ingersoll rand), Induced draft fans (Siemens) and Succeed Installation of mechanical seals to centrifugal pumps in Granulation areas.
Conducted Erection and Commissioning of Electrostatic precipitator (ESP) and PDC systems also Drag chain conveyor for lime pneumatic dust conveying system.
Successfully completed a Major shut down in Sterlite copper (Vedanta limited) within a scheduled time of 28 days in 2014
Completed Continuous improvement project on “Reduction in breakdown of granulation pumps"- To increase reliability and availability of slag cleaning furnace.
Experienced in Dismantling and Erection of Water Cooled double hood panels and Gas Cooling System also in Structural & Piping s
Handled 80M Height Stack Dismantling&erection for maintenance& inner FRV provision.
Commissioning of Flue gas SO2 desulphurization scrubbing system CONTINOUS IMPROVEMENTS PROJECTS
Continual Improvement Project (CIP) FY 2014-15 for “Reduction of Copper Anode Conical Rejection From 11% To 4%”.
IDEAS IMPLEMENTED: Installation of Auto Punching Machine System instead of Manual Punching Machine in Converter Operations (Make: Heath& Sherwood, Canada)
Increased Caster Wheel Hydraulic Pushers life by design modification from 3 months to 18 months, Realized recurring benefits 10 Lakhs per Annum
Succeeded Main Stores Inventory Reduction from 29Crs to 25Crs CAREER ACHIEVEMENTS
Internal Auditor for implementation of EnMS (Energy Management System) ISO 50001:2011
Awarded Best Idea / KAIZEN Suggestion and Implementer by COO for “Total Employee Engagement Program” during Kaizen week celebrations.
Internal Trainer by Dr. HL Kaila BBS-Project Director as a Behavior based safety lead trainer
Internal Auditor for Effective Implementation of 5S concepts
Support the development and realization of a “Zero Incident culture” in a way that serious injuries are prevented and best in class HSE performance is achieved
Act as Best Safety Steward (Responsible of work at height and Scaffolding Erection & Safety).
SPA (Single point Accountability)Team Member for Safe Machine Guards Compliance SOFTWARE PROFICIENCY
SAP ( PM & MM), MS Office Tools, Advanced Excel, AutoCAD USAGE OF STANDARDS
ISO-9001:2008, ISO-14001:2004, ISO-50001:2011,ISO-14164:2008,OHSAS-18001:2007 PERSONAL SKILLS
Strong verbal and written communication skills
Strong leadership skills& Managerial courage
Inclination to learn new things and exploit the opportunities
Team player supporting and appreciating members
Good negotiation skills with a Go- and-get-it attitude SCHOLASTICS
BACHELOR OF ENGINEERING IN MECHANICAL
Graduated with 73% (First Class), July 2007 to April 2011, Sardar Raja College of Engineering, Anna University - Tirunelveli, and Tamilnadu, India PERSONAL DETAILS
DOB : 08/04/1990
Sex : Male
Marital status : Single
Nationality : Indian
Languages known : English (fluent), Tamil (native), Hindi (Beginner)
Passport Detail : N 8351316 (DOI: 10/03/2016 & DOE: 09/03/2026)
Permanent Address : 36A,Aravind Nagar, Sankar Nagar, Tirunelveli, Tamilnadu, India DECLARATION
I hereby declare that the above furnished details are true and up to the best of my knowledge. DATE: VIGNESWARAN M