Post Job Free
Sign in

Fabrication erection modifications test package punch list restatemen

Location:
Patna, Bihar, India
Salary:
As per company
Posted:
October 01, 2020

Contact this candidate

Resume:

CURRICULUM VITE

LAVKUSH KUMAR SINGH (PIPING FOREMAN)

S/O-GOPAL SINGH MOB-+918*********,

620-***-****

VILL+POST-BAGWAN adgjv9@r.postjobfree.com

DIST-BHOJPUR (ARA) passport no =M 4576214

Professional Objective

A growth driven self motivated professional with 10 years experience in inspection

And execution of project related oil & gas industry petro chemicals, power plant

Natural gas transmission, distribution pipeline and gas plant project construction

And fabrication erection welding activities and quality control test pack as built

Control sheet and very well isometrics and p & id with hydro test punch list

Work experience

> Piping foreman : Emdad Services Abu Dhabi (23.01.2020 to 16.03.2020)

> Some of the responsibilities

e Maintaining the standards of safety and quality as per the company procedures

eResponsible for all aspects of the day- to- day fabrication and erection activities of the

project in terms of safety, quality and timely manner.

eunderstand the scope of work and coordinates with the different disciplines in order to

mitigate the interference/clashes

e preparing the TRA(task risk assessment) considering the fabrication,erection & precommis-

sioning activity and ensure all the hazards &risk associated with the activities are undertake

> Piping foreman: Qatar engineering & construction company will Qatar

(Mar.2019 to Apr. 2019)

> Some of the responsibilities

e Ensure the all punch list items are resolved; client handover is satisfactorily concluded and

there is no prolongation of project that

e Handling all piping technical queries and investigating all field pipe work related problems

including the drawing of field sketches when necessary.

e Preparation of field piping system test packages, including system limit on P&ID and piping

e Monitoring the progress and performance of the fabrication & erection Crew in order to

ensure the productivity, Quality and standards are maintained

e Ensure that hydro test reinstatement is to be done as per procedure.

e Facilitate timely problem resolution with the construction crew.

> Piping foreman: Doha petroleum construction co.Itd (jan.2018 to apr.2018)

e Coordinating with the design engineers at the engineering stage in order to mitigate/avoid

The hazards &risk during the fabrication &erection activities

e Responsible for carrying out mechanical clearance conducting hydro and pneumatic test

Fulfilling commissioning and pre-commissioning requirement for the project



Contact this candidate