Post Job Free
Sign in

Data Engineer

Location:
Ooty, Tamil Nadu, India
Salary:
800000
Posted:
September 28, 2020

Contact this candidate

Resume:

Vijay Kumar

E-Mail:adghg1@r.postjobfree.com adghg1@r.postjobfree.com

Phone: +91-981*******, 989*******

Industry Preference: Engineering Construction Consultancies Senior Level Assignments: Geo-technical Instrumentation

“Versatile, high-energy professional,offering 13.5+ years of dynamic career inGeo-technical Instrumentation & 3D Monitoring; scaling new heights of success with hard work & dedication and leaving a mark of excellence on each step”

CORE COMPETENCIES

Strategic Planning

Installation & Commissioning

Operations & Maintenance

Documentation & reporting

Team Management & Leadership

ACADEMIC DETAILS

AMIE Completed H Grade with 82%

from AMIE Institute Kolkota, in

2009

Diploma Completed 1st Division with

79% (Instrumentation and Control

Engineering) from Govt. Polytechnice

Kanpur, U.P. in 2005

Others:

Comprehenive knowledge of Pressure

meter & Dilatometer Test for

Calculation of Stress

IT SKILLS

MS Office, Windows – XP / 7 / 8

Multilogger Software for Campbell

make Datalogger

Dt USB for data taker Thermofisher

make.

PERSONAL DETAILS

Date of Birth:10th April 1986

Languages Known:Hindi & English

Present Address: Room No. 32 Sarai

Khawaja, Moolchand Colony. Jhariya

Market, District- Haryana. -121003

Permanent Address: Vill. Palai Purwa

House No. 250 Malouli Gosai, Post :

Shankarpur, Distic : Basti U.P. - 272129

PROFILE SUMMARY

A Geo-technical Instrumentation and 3D monitoring of tunnels Expert with excellence in identifying appropriate control schemes / systems, addressing enquiry specifications and selecting instruments as per type of application; skilled in managing instrumentation & engineering / technology including system applications, principles, techniques & procedures to optimize productivity.

Incisive acumen in installation & commissioning activities for Geo- technical instruments for Cavern Projects (Dam, Spillways, and Power Houses), Bridges, Structures, Tunnels (NATM & TBM), Rail tunnels, Metro involving resource planning, in-process inspection, team building and co-ordination with internal / external departments.

Facilitated technical, solution development and project management expertise to various projects throughout the firm; developed solution architecture to support core business processes.

Leveraged skills in directing site operations and accountable for quality service & timely completion of the work.

Pivotal in implementing maintenance schedules for various field instruments, conducting periodic checks and managing documentation with a key focus on reduction in delays & equipment uptime.

Achievement oriented professional with excellent people management skills and capability to manage change with ease. ORGANISATIONAL EXPERIENCE

Since Sep’2011 Aimil Ltd., Delhi

as Senior Service Engineer (Grade E-2)

Project: Vizag Defence Cavern Project

Key Result Areas:

Providing installation, monitoring and servicing support for Geo- technical instruments.

Drafting reports and graphs from readings.

Scrutinizing the data and preparing the summary from the same

Spearheading activities involving working out various requirements & monitoring overall project operations regarding geo-technical instrumentation for ensuring timely completion

Inspecting the field instruments, installation, cabling etc. Preparing documentation for instrumentation and reviewing DDC drawings on installation & commissioning accordingly; reviewing & updating various engineering & vendor documents.

Project: Mumbai Metro Rail Project UGC Package-02

Key Result Areas:

Managing Geo-technical instruments project and pre and post building condition survey.

Providing installation, monitoring and servicing support for Geo-technical instruments.

Support in installation and monitoring of Data Acquisition System.

Providing support in online monitoring of critical and heritage structures.

Drafting reports and graphs from readings.

Scrutinizing the data and preparing the summary from the same

Spearheading activities involving working out various requirements & monitoring overall project operations regarding geo-technical instrumentation for ensuring timely completion

Inspecting the field instruments, installation, cabling etc.

Preparing documentation for instrumentation and reviewing DDC drawings on installation & commissioning accordingly; reviewing & updating various engineering & vendor documents.

Directing project activities for strategic utilization of available resources as per schedules; executing cost saving techniques to achieve reduction in terms of man days, raw materials & energy consumption

Developing the engineering solutions to avoid repetitive failures & all other problems that adversely affect plant operations including capacity, quality, cost & regulatory compliance issues.

Involvement in the construction activity at site and preparation of details as per given support system. Project: Delhi Metro Rail Project UGC Package-20

Key Result Areas:

Managing Geo-technical instruments project and pre and post building condition survey.

Providing installation, monitoring and servicing support for Geo-technical instruments.

Support in installation and monitoring of Data Acquisition System.

Providing support in online monitoring of critical and heritage structures.

Drafting reports and graphs from readings.

Scrutinizing the data and preparing the summary from the same

Spearheading activities involving working out various requirements & monitoring overall project operations regarding geo-technical instrumentation for ensuring timely completion

Inspecting the field instruments, installation, cabling etc.

Preparing documentation for instrumentation and reviewing DDC drawings on installation & commissioning accordingly; reviewing & updating various engineering & vendor documents.

Directing project activities for strategic utilization of available resources as per schedules; executing cost saving techniques to achieve reduction in terms of man days, raw materials & energy consumption

Developing the engineering solutions to avoid repetitive failures & all other problems that adversely affect plant operations including capacity, quality, cost & regulatory compliance issues.

Involvement in the construction activity at site and preparation of details as per given support system. Project Name: Crude Oil Cavern Project Mangalore

Key Result Areas:

Installation of instruments (Convergence bolt with adapter and bi-reflex target or prism) for 3D optical monitoring

3D optical monitoring through total station for measuring the convergence in the tunnel.

Calculation of convergence using the data of 3D optical monitoring and preparation of monitoring report.

Analysis and interpretation of monitoring data.

Installation and monitoring of Vibrating wire type Multi Point (3, 4 or 5 point) and Single point Borehole Extensometer (MPBX).

Taking the data of MPBX, analysis and interpretation of data.

Installation and monitoring of Vibrating wire type Total pressure cell (Weldable type and embedded type).

Taking the data of pressure cell, analysis and interpretation of data.

Installation and monitoring of Piezometer (If required), taking the data, analysis and interpretation.

Installation and monitoring of Load cell (Vibrating wire or strain gauge type), taking the data, analysis and interpretation.

Preparation of monthly report consisting of details of all the instruments installed with its reading, analysis and interpretation.

Preparation of installation report of all the instruments installed.

Proper routing and cabling of all the instruments by using multi core cable through 10 or 12 way Switch cum junction boxes.

Keeping proper interaction with client for drawing, any changes of location installation etc. PREVIOUS EXPERIENCE

Feb’08 –Sep'11 Encardirite electronics Pvt. Ltd., Lucknow as Installation & Monitoring Engineer (Instrumentation) Feb’07 –Feb'08 Gail India Ltd., Pata Auraiya as Apprenticeship Trainee Jan’06 - Jan’07 Magion Construction Company., Pata Auraiya as Senior Technician PROJECT DETAILS

Project Name: Crude Oil Cavern Project

Year: Feb. 08 – April, 10

Location: Vizag Vishakhapatanam

Client: ISPRL

Main Project Features: Construction of 4.0Km long Main Cavern and rescue tunnel (each) using NATM. Construction of approximately 100m long saft.

Employer: M/s Encardio Rite Electronics Pvt. Ltd.

Position held: Installation & Monitoring Engineer

Activities performed:

Installation of instruments (Convergence bolt with adapter and bi-reflex target or prism) for 3D optical monitoring

3D optical monitoring through total station for measuring the convergence in the tunnel.

Calculation of convergence using the data of 3D optical monitoring and preparation of monitoring report.

Analysis and interpretation of monitoring data.

Installation and monitoring of Vibrating wire type Multi Point (3, 4 or 5 point) and Single point Borehole Extensometer (MPBX).

Taking the data of MPBX, analysis and interpretation of data.

Installation and monitoring of Piezometer (If required), taking the data, analysis and interpretation.

Preparation of monthly report consisting of details of all the instruments installed with its reading, analysis and interpretation.

Preparation of installation report of all the instruments installed.

Proper routing and cabling of all the instruments by using multi core cable through 10 or 12 way Switch cum junction boxes.

Keeping proper interaction with client for drawing, any changes of location installation etc. Project Name: Tehri Hydro Power Project.

Year: April.2010 to September.2011

Location: Tehri Garhwal Uttarakhand

Client:THDC India Ltd.

Main Project Features:

Construction of 260.5m high and 500m long earth and rockfill Dam. Construction of Chute and Shaft Spillway.

Construction of 1000MW Power House.

Construction of 1000MW Pump Storage Plant. (Under Construction) Employer: M/s Encardio Rite Electronics Pvt. Ltd.

Position held: Installation & Monitoring Enginner

Activities performed:

Installation and Monitoring of Geo-Technical instruments as follows- i. Vibrating wire Piezometer.

ii. Vibrating wire Earth and concrete pressure cell. iii. Vibrating wire multi point borehole extensometer. iv. Vibrating wire Load Cell.

v. Inclinometer System.

vi. Tape Extensometer.

vii.Seepage measuring device (Automatic and Manual) viii.Reinforcement Load Gauge.

ix. Vibrating wire and mechanical joint meter.

x. Vibrating wire and mechanical type three dimensional joint meter. xi. Mechanical type two dimensional joint meter.

xii.installation of bi-reflex target in tunnels for monitoring of convergence.

Proper routing and cabling of all the instruments by using multi core (50 core) cable through 20 or 30 way Switch cum junction boxes.

Wiring of Data Acquisition System for connection of instruments.

Installation of Data Acquisition System for providing the automation in taking the data of all instruments from one control room.

Taking the data of all the instruments.

Analyzing the data, preparation of report on monthly basis.

Sending the data on daily and weekly basis to client.

Analysis and interpretation of data of instruments installed in Pump Storage plant of Tehri Project.

Preparation and submission of interpretation report.

Giving the training to the client staff.

Besides these activities some other activities related to the official and financial work like raising the bills, collecting the payments, C-forms, TDS certificate, checking the measurement books etc.

Recruiting the local persons as helper for work. GAIL INDIA LIMITED

TOTAL WORK EXPIREINCE: 1YEAR

Year: Feb ‘07 to Feb ’08

Location: Auraiya Pata

Main Project Features: Construction of Bagging Plat. Employer: M/s Gail India Ltd.

Position held: Apprentice Trainee

Activities performed:

Installation of Control Valve, Flow Meter, Pressure Transmitter, Ventury Tube, Mass Flow Meter, Temperature meter and pressure meter and also monitroered turbine equipment.

Installation, testing & commissioning of instruments as per project standards.

Responsible for smooth & safe operation of instruments.

Making Calibration plan for one week of the instrument like transmitter, RTD, Control valve pressure switches.

Performing the work activities by complying the HSE E&I safety standards & procedures.

Responsible for ordering the material which required for maintenance.

Assist the instrumentation team for testing & calibration of instruments & loop check. MAGION CONSTRUCTION COMPANY

TOTAL WORK EXPIREINCE: 1YEAR

Year: Jan ‘06 to Feb ’07

Location: Auraiya Pata

Client: Gail India Ltd.

Main Project Features: Instruments Installation & Monitoring. Employer: M/s Magin Construction Company

Position held: Sr. Technician

Activities performed:

Installation of Control Valve, Flow Meter, Pressure Transmitter, Ventury Tube, Mass Flow Meter, Temperature meter and pressure meter and also monitroered turbine equipment.

Installation, testing & commissioning of instruments as per project standards.

Responsible for smooth & safe operation of instruments.

Making Calibration plan for one week of the instrument like transmitter, RTD, Control valve pressure switches.

Performing the work activities by complying the HSE E&I safety standards & procedures.

Responsible for ordering the material which required for maintenance.

Assist the instrumentation team for testing & calibration of instruments & loop check. Deceleration

I hereby declare that the informations provided above are true to best of my knowledge. Date: 26.08.2020

Place: Faizabad (Uttar Pradesh) Vijay Kumar



Contact this candidate