Post Job Free

Resume

Sign in

Construction Manager Architect

Location:
Jeddah, Makkah, Saudi Arabia
Posted:
September 28, 2020

Contact this candidate

Resume:

Eight years of experience in the Engineering & Construction field in mixed-use projects,

including RESIDENTIAL & COMMERCIAL.Highly skilled in typical, GRC, GRP and pre-cast construction building and high quality finishes selection internal and external installation with Extensive site experience in executing, monitoring and controlling.Approved Architect at

(Royal Commission Yanbu) as well a construction manager for royal commission head quarter tower project . well oriented in local (SASO, SABIC, RC, ARAMCO) and international design, construction and building codes such as international building codes (IBC), ASTM, uniform building codes.Demonstrates excellent communication skills and the ability to maintain positive internal and external relationships with construction and planning team. work e x p e r i e n c e

MANAGEMENT

50%

PRODUCTION

35%

DESIGN

15%

Company : ALFAAL ARABIA FOR CONTRACTING

EPOXY FLOORING

ROAD MARKING AND SIGNAGE

BROOM AND STAMPED CONCRETE

LANDSCAPE AND IRRIGATION

FOUNTAIN AND PUMPS ROOM

SKILLS

BILAL DAHDOULI

ARCHITECT BUILT ENVIRONMENT

Nationality : Lebanon

Age : 32

City state : Jeddah

Tell:+966-*********

KEYROLE

• Schedule the project in logical steps and budget time required to meet deadlines.

• Determine manpower requirements and dispatch workers to construction sites.

• Inspect and review projects to monitor compliance with building and safety codes

• Interpret and explain plans and contract terms to all stakeholders.

• Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors

• Obtain all necessary permits and licenses.

• Direct and supervise team members

• Analyze job specifications to determine appropriate construction methods.

• Select subcontractor and oversee manpower who complete specific piaces of the project

• Requisition supplies and materials to complete construction projects.

• Prepare and submit budget estimates,progress and cost tracking reports

• Develop and implement quality control programs.

• Take actions to deal with the results of delays or emergencies at construction site. T IMELINE

P R O F I L E

Position : Construction manager

Project : Construction of two floors parking with basement, hardscape & landscape work Client : Royal commision yanbu

Total built up area : 3500 m

FROM DATE : 26 DECEMBER 2019 until present Project details: Consist of two floor and basement

Total area : 7600 m

CLADING BY VARIOUS TYPE OF STONE'S

CMU BLOCK WORK

1 - 3

1.BA.ARCHITECTURE BUILT ENVIRONMENTS (LIMKOKWING UNIVERSITY MALAYSIA) 2. PARTICIPATION IN IMAGINAGTION VISUAL

3. CERTIFIED PROFESSIONAL AUTODESK (REVIT) SPECIALIZED BIM 4. CERTFIED PMP FROM PMI INSTITUTE COURSE

5. LEED GREEN BUILDING CERTIFICATED COURSE

C E R T I F I C A T E S

Mail:adghb3@r.postjobfree.com

work e x p e r i e n c e

Structure arches and dooms

Company : ALFAAL ARABIA FOR CONTRACTING

Position : Project Architect

Project : Construction of Mosque & commercial building Client : Royal commision yanbu

Total built up area : 8500 m

FROM DATE : 12 JANUARY 2019 Until present

• Attaining approval of the design drawings from all the involved authorities

• Check / Review the as-built,IFC and shop drawings, project technical specifications, and submittal of materials.

•Coordinate with Project/Construction Manager regarding project status

• Direct meetings with subcontractors and procurement to stay into budget

• Monitoring and controlling the site on regular basis

• submit all RFI related to work and check quality of the work made

• modify and re-design the IFC drawing to solve any design issue

• Analyze job specifications to determine appropriate construction methods.

• Identify areas of improvement and propose new design approach in collaboration with technical studies architect where needed

• Prepared technical documents following the technical specifications, conceptual plans and scope of work descriptions.

Project details:

Consist of mosque & commercial building

Total area : 12000 m

CMU BLOCK WORK

interior and exterior work

PRODUCTION

50%

MANAGEMENT

25%

DESIGN

25%

KEYROLE

SAFE DESIGN FOR KIDS

Company : ALFAAL ARABIA FOR CONTRACTING

Position : Project Architect

Project : Construction of kindergarten schools

Client : Royal commision yanbu

Total built up area : 3500 m

FROM DATE : 18 FEB 2018 UNTIL 25 DEC 2019

• specify the nature and quality of materials required to be used

• create plans and designs, Preliminary, sanction & detailed drawings.

•Coordinate with Project/Construction Manager regarding project status

• Follow day-to-day operations related to own job to ensure continuity of work.

• Inspect work for conformance with approved plans, specifications and standards,

• submit all RFI related to work and check quality of the work made

• modify and re-design the IFC drawing to solve design issue

• Analyze job specifications to determine appropriate construction methods.

• Prepared project closing documents

Project details:

Consist of two floors building and parking

Total area : 7000 m

CMU BLOCK WORK

INTERIOR & EXTERIOR WORK

PRODUCTION

50%

DESIGN

35%

MANAGEMENT

15%

KEYROLE

Company : PREMCO (BINLADIN GROUP )

Position : Architect

Project : Construction of HARAMIN RAILWAY STATION

Client : ROAD & TRANSPORTATION MINISTRY

Total built up area : 316.000 m

FROM DATE : 12 APRIL 2014 UNTIL 22 JANUARY 2018

• create plans and designs, Preliminary, sanction & detailed drawings.

• inspect the production of GRP panels as per design drawings

• Analyze job specifications to determine appropriate construction methods.

• perform load tests to determine the load can be tolerated and assure as per the specs

• modify and fabricate molds to expedite production

• Follow day-to-day operations related to own job to ensure continuity of work.

• Direct and supervise team members

Project details:

Consist of GRP, SKY LIGHT & WALKWAYS

Total area :635.000 m

GRP PANELS

GRP TILES WORK

PRODUCTION

60%

DESIGN

30%

MANAGEMENT

10%

KEYROLE

2 - 3

PRODUCTION

60%

DESIGN

30%

MANAGEMENT

10%

• create plans and designs, Preliminary, section & detailed drawings.

• inspect the production of precast & GRC panels as per design drawings

• Analyze job specifications to determine appropriate construction methods.

• perform panels check and accelerate work by re-fabricating other mould to fit in other panels shape to meet schedule

• modify and fabricate molds and specify type of fabrication ex fiber, CNC steel moulds, rubber and wood to expedite production

• Monitoring and controlling the site on regular basis

• create plans and designs, Preliminary, sanction & detailed drawings.

• Prepared technical documents following the technical specifications, conceptual plans and scope of work descriptions.

Company : PREMCO (BINLADIN GROUP )

Position : Architect

Project : Construction of KUDAI TOWERS

Client : BINLADIN GROUP

FROM DATE : 12 FEB 2012 UNTIL 22 MARCH 2014 Project details: Consist of GRC, CONCRETE PRECAST

Total area :25000 m

PRECAST PANELS

GRC CLADDING WORK

KEYROLE

3 - 3

R E C E N T W O R K

work e x p e r i e n c e



Contact this candidate