STEPHEN F. HENNIGAN

Cell Phone 337-***-****

EXPERIENCE:

March 2020 – present Becah Services, LLC - consulting

Looking for work

**** – March 2020 SIERRA HAMILTON / PETROLEUM ENGINEERS, INC. – Lafayette, LA

Engineer/Project Manager

Engineer with 40+ years of drilling, workover, completion and environmental experience from operator and service perspectives; who works well at optimization of resources in most environments. Experience includes:

• Project Mgmt (up to 10 simultaneous opns) • Hydraulics

• PWP’s & AFE’s • Well Kill Procedures

• Drilling / Completion Fluids • Casing Design

• Engineering / Rig Modifications • Horizontal Drill-in Incl MPD & extended reach

• Office Supervision • Mud / Completion Fluid Programs

• Pore Pressure Plotting • Drillstring Design

• HPHT design (up to 460, 24000 psi) • Wellsite Supervisor (D, W&C)

• P&A Procedures • Environmental and Permitting

• Completions • Workovers

Areas of work:

Onshore/land: includes South Louisiana & North Louisiana, Alaska (Cook Inlet Basin, North Slope, West, Central), South Texas, West Texas, Central Texas and East Texas, South Arkansas, Mississippi, Alabama, Mid Con.

Alaska, Cook Inlet to North Slope, Gulf of Mexico & In-land waters (Louisiana & Texas). incl Deepwater (Atwater Valley, Green Canyon, Garden Banks, Ewing Banks, East Breaks, Mississippi Canyon).

Foreign: Russia, Australia & Syria.

2008- Pres: Oil Search Alaska, Armstrong, Nordaq, Buccaneer, BlueCrest, Royale, All-American, Cook Inlet Energy (now Glacier Oil and Gas), Doyon, Ahtna, Key Energy, Global, Interstates, Gardes Energy, etc

Project Manage, plan, AFE, permit and supervise onshore/ offshore operations including permitting (state, BLM), drilling, workover, completion, slick line, and coil tubing operations. Mostly in AK and LA.

2006 – 2008: PelTex, Whiting, Dune, Krescent, Caddo, Salinas, Leor, Patara, Petrogulf, and others

Project Manage, plan, AFE, permit and supervise onshore/ offshore operations including permitting (state, MMS & BLM), drilling, workover, completion, slick line, and coil tubing operations.

2004 – 2005: Palace, ZTI, Whiting, Wagner, Petroventures, Bridwell, Forest Oil, Inflow & Misc

Project Manage, plan, AFE, and supervise onshore/ offshore operations including permitting, drilling, workover, completion, slick line, and coil tubing operations.

2003: Forest Oil (Denver-Lafayette-New Orleans) – Exclusive for 6 months

Manage, plan, AFE, and supervise offshore operations including drilling, workover, completion, slick line, and coil tubing operations. Well plans for Alaska Cook Inlet

Others

Petroventures offshore project • Whiting Pinnacle Reef

Misc operators

2002: Remington Oil (Exclusive Supt. 10 months)

Manage, plan, AFE, and supervise offshore operations including drilling, workover, completion, slick line, and coil tubing operations. Plan and AFE floating (GB/MC area and East Breaks), jackup, and platform operations in the Gulf of Mexico. Plan and implement completion, workover, & P&A operations. Assist development of business plans, presentations, and assist in partner relations.

2001: Forest Oil (Lafayette-New Orleans) – Exclusive for one (1) year

Manage, plan, AFE, and supervise offshore operations including drilling, workover, completion, slick line, and coil tubing operations.

Plan and AFE floating (GB/MC area and East Breaks), jackup, and platform operations in the Gulf of Mexico.

Plan and implement completion, workover & P&A operations.

Assist development of business plans, presentations, and assist in partner relations.

2000: Blue Star Operating (Lafayette, LA-Dallas, TX) – Exclusive for one (1) year

Engineering (Office – Field) –HPHT UBD project in E. Texas

Plan and AFE Texas/LA Projects

1998 – 1999: Forest Oil (Lafayette, LA-Denver, CO) – Exclusive for two (2) years

Plan, AFE, and supervise in-land and on-shore operations, LA (Mississippi to Sabine) to Texas (All) including drilling, workover, completion, slick line, and coil tubing operations.

Plan and AFE floating (Ewing Bank/MC area and East Breaks), jackup, and platform operations in the Gulf of Mexico.

Plan and implement completion, workover, & P&A operations. HPHT wells in East Texas and West Texas.

Ocean Energy / UPRC / PetroQuest

Plan and AFE land and jackup operations.

Plan and implement P&A operations.

1995 – 1998: Kerr McGee Corp. (Lafayette, LA) Engineer

As an “in-house” engineer for over three (3) years, performed the required engineering functions to successfully drill a number of deep Gulf Coast wells and specialty work in Alaska NS. Duties included:

• Coordinate fluid recommendations • Hydraulics programs

• Pressure plotting • Casing & drill string design

• Well control procedures • Horizontal drill-in & completion (8.5-16.0 ppg)

• Land to 2332’ water depth (Well Planning) • Workover/comp fluid design & displacements

• General Engineering projects including rig modifications.

Lagoven – (Venezuela)

Assist with pressure plotting, mud and drilling program for proposed work.

OTV – (Lafayette) Project Engineer

Design procedures, cost estimation, etc. for turnkey prospects and for other non-turnkey clients.

1988 – 1994 MARATHON OIL COMPANY – Lafayette, LA / Houston, TX

Drilling Foreman / Wellsite Engineer

Worked several jobs overseas as a wellsite supervisor/engineer with all jobs completed under AFE (Russia, Syria & Australia).

Drilling with weighted mud systems and heavy water systems.

Design & implementation experience in well remediation.

Design & implementation experience in flow testing, drillstem testing and simple completions.

Assisted in platform and rig design and modifications.

Pressure plotting – competent with DWC, Anadrill and Pennebaker methods.

1991: Advanced Drilling Engineer/Foreman

Well planning/project engineer on floating and land operations (All wells under AFE).

Assisted in platform and rig design and modifications.

Foreman on floating, land and jack up rigs.

1988 – 1991: Engineering Associate

Responsible for optimization of drilling mud solids control, completion fluids, environment, training, etc. Reduced mud cost per foot from +$48 per foot to +$22 per foot. Reduced completion and workover fluid costs approximately $1,000,000 annually. All areas of Gulf of Mexico, Louisiana and Texas Gulf coast. All types of systems. Assisted in platform and rig design and modifications. Responsible for most pore pressure prediction and plotting. Numerous special projects including hydraulics and hole cleaning analysis. Performed instructional seminars. Assisted all MOC areas at times.

1986 – 1988: FLO TREND SYSTEMS – Lafayette, LA

Sales Manager:

Responsible for profitable technical sales of solids control equipment, filtration & water clean-up oilfield and industrial.

1985 – 1986: CHROMALLOY DRILLING FLUIDS – Lafayette, LA

Manager – Completion Fluids Eastern Region:

Extensive work with corrosion, formation damage, mineral oils, polymers and bromides to 21.0 ppg, 24,500' and 400 F. Responsible for profit center management, technical sales & research coordination.

1974 – 1985: NL BAROID, NL INDUSTRIES, INC.

1982-1985 Region Manager – Lafayette, LA: Accountable to Vice President of Business and Technical Development. Responsible for profit center management and technical sales, development and service of completion, workover and drilling fluids in Southwest Louisiana, North Louisiana, East Texas, Arkansas, and offshore Southwest Louisiana and Northeast United States. Includes plant design and M & R, coating, fluid compatibilities, hydraulics, solid/liquid separation, corrosion, etc.

1980-1982 Completion Workover Fluid Technical Sales Representative – Lafayette, LA: Responsibilities included technical sales and service programming, training, trouble-shooting, and special research of fluid, corrosion and filtering studies.

1976-1980 Region Engineer I and II – New Orleans, LA: Responsibilities included pressure plotting and mud programming, training, trouble-shooting, special projects (hydraulics, material analysis, corrosion, solids control, etc.). Area of responsibility: Tuscaloosa Trend and all land and offshore areas east of the Atchafalaya River and north including East Coast. Extensive experience in deep, hot, high pressure drilling in 10-40% sour gas areas and deep water drilling. Several internally published articles.

1975-1976 Regional Staff Engineer – Lafayette, LA: Duties included pressure plotting and mud programming, training, solids control, trouble-shooting, and special technical projects coordinator. Responsible for North and Southwest Louisiana and offshore areas.

1974-1975 Sales Engineer I and II (ADT Engineer) – Lake Charles, LA

Worked as mud engineer and trouble-shooter. Worked as Applied Drilling Technology engineer to predict formation pore pressures while drilling.

1974: PPG INDUSTRIES – Lake Charles, LA

OSHA Engineer

Responsible for bringing plants to OSHA Specifications - completed.

1967 – 1974 Worked toward getting 2 degrees (BS Math & MS Engineering) and working my way through college.

EDUCATION:

MS Engineering Management – University of Southwestern Louisiana - 1991

Graduate School, Math – McNeese State University - 1973

BS Mathematics – McNeese State University – 1971 (Minor in Economics)

Mechanical Engineering Major – Louisiana State University – 1967/1968

INDUSTRY ORGANIZATIONS:

1975-Present – Member SPE – Life Member

1982-Present – Member API

1985-Present – Member AADE

1988-2005 – Member API Committee 13

1990-2005 – API TG 6 Testing of Heavy Brines – Chairman 1 year, member

2008-Present – Member SIPES

2013– LAGCOE Board

CERTIFICATIONS:

LA License for Waste Disposal and Site Rehabilitation

MMS Certification for Drilling, Completion, Workover, and Well Servicing Supervisor

STOP Certified

H2S Certified

Hazwoper Plus Certified

INS Cert

ICS Cert

SPECIAL TRAINING AND DEVELOPMENT:

• Preston Moore Drilling Practices • Applied Drilling Technology

• Amoco Drilling Practices • Mud Logging

• Self Motivation • Profit Center Management

• Chromalloy Drilling & Completion Fluids • Management & Supervision by Objectives

• SPE Clay Chemistry, Short Course • Bill Cagle Solids Control School

• Marathon Mud School • Charles Prentice Advanced Well Control

• Randy Smith Well Control • Casing & Tubing

• Safety – H2S • Flo Trend Solids Control & Filtration

• API Squeeze Cementing Symposium • Drillstring Inspection

• Well Planning • Baroid Solids Control

• Completion & Workover Fluids • Introductory Well Control

• Advanced Profit Center Management • Fire Fighting – Basic

• Problem Solving • Marathon Squeeze Cementing School

• Charles Prentice Well Planning • Hazwoper Plus

• Cementing Remedial • McClure’s Pressure Prediction

• Stuck Pipe Prevention • TRUE Training (4)

• Expandable Equipment-casings and tools • K&M Technology Extended Reach Drilling

ARTICLES PUBLISHED AND/OR WRITTEN FOR PUBLICATION:

Risk-Fish or Sidetrack

Quality, A Perspective

Simulation of Drillstring Sticking Costs

Well Planning is Cost Effective

Notes on Iron Contamination (of drilling, completion, and workover fluids)

Drilling Railroad Tracks

Psychological Aspects of Total Quality Management

Special Accomplishments:

First drill-in in the GOM with Calcium Bromide

Record HPHT well Onshore Louisiana (Deepest, highest pressure, highest temperature)

with best cost compared to subsequent OBO

Planned first drill well known to be drilled in AK with a workover rig

2017 North Slope Exploration Drill Project <50% of the AFE done by previous operator

Record Cook Inlet onshore drill

CBM