Resume:

JUSTIN IZARD

*** *** ******* ***** ****• HUTTO, T X 78634 • PHONE 737-***-****

adggx0@r.postjobfree.com

OBJECTIVE

To obtain a position that will allow me to apply my management skills, quality assurance, and program implementation in the pipeline, semiconductor, pharmaceutical, biotech and heavy construction industry.

SKILLS

•Aptitude to multitask and prioritize work to meet deadlines

•Ability to distribute tasks appropriately as per the competencies and skills of the welders and field support

•Sound knowledge of advanced welding processes, procedures and material

•Proficient at interpreting various related codes such as ASME B31.3 and B31.1

•Maintain relations with both customers and co workers

•Proficient in writing procedures for mechanical installation, pressure testing, and welding

•Admirable experience in working on complex construction sites both domestic and international

EXPERIENCE

February 2014-Present Brandt Engineering

Quality Control Supervisor

•Assisted in originating the processes and procedures for the industrial division of the company from ground up

•Reviewed hygienic welding processes and provided recommendations for process improvements

•Prepared all client turnover packages based on installation and qualification documentation per cGMP requirements

•Trained and instructed employees to cGMP practices

•Served as a liaison between the client and contractor

•Ensured all work is performed to documented procedures

•Planned, Coordinated and Verified pressure testing and hydrostatic testing of multiple site systems

•Provided expediting support for critical equipment orders

•Compiled Welding Procedure Specifications (W.P.S), Procedure Qualification Records (P.Q.R.), and Welder Performance Qualifications (W.P.Q.) for accuracy and section IX compliance

•Reviewed and interpreted film

•Purchased and received materials per system specifications

•Operated as Project Superintendent for Texas Instruments (TI) R Fab to ensure project deadlines were met

Global Foundries (Malta, NY)

Allergan (Waco, TX)

Dr. Reddy (Shreveport, LA)

Mary Kay (Carrollton, TX)

March 2009-February 2014 Total Facility Solutions

Quality Manager (Central U.S. and Mexico)

•Reviewed hygienic welding processes and provided recommendations for process improvements

•Prepared all client turnover packages based on installation and qualification documentation per cGMP requirements

•Trained and instructed employees on cGMP practices

•Served as a liaison between the client and contractor

•Ensured all work is performed to documented procedures

•Planned, Coordinated and Verified pressure testing and hydrostatic testing of multiple site systems

•Provided expediting support for critical equipment orders

•Reviewed Welding Procedure Specifications (W.P.S), Procedure Qualification Records (P.Q.R.), and Welder Performance Qualifications (W.P.Q.) for accuracy and section IX compliance

•Performed P&ID verification to ensure accurate “as-built” conditions (component, valve orientation, etc.)

•Reviewed and interpreted film

Samsung Austin Semiconductor (Austin, TX)

Beiersdorf (Leon, Mexico)

Global Foundries (Malta, NY)

Intel (Phoenix, AZ)

May 2007-February 2009 Quality Assurance Management (QAM)

Project Manager, Source Inspection Services

•Conducted pre-inspection meetings and documented accordingly as per purchase order requirements

•Trained and instructed employees on cGMP practices

•Prepared and verified equipment documentation necessary for process validation

•Served as a liaison between equipment manufacturer and the end user for inspection purposes

•Reviewed hygienic welding processes and provided recommendations on process improvements

•Performed P&ID verification to ensure accurate “as-built” conditions (component, valve orientation, etc.)

•Completed installation and qualification documentation

•Managed non-destructive testing, reviewed performance and verified and recorded results

•Planned, Coordinated and Verified pressure testing and hydrostatic testing of multiple site systems

•Performed Mass Spectrometer leak testing of fluid systems, including toxic gas lines

•Executed analytical testing which included particle counting, oxygen, moisture, hydrocarbon and TOC analyses

•Achieved gas line certification for tool multiple tool installs

•Completed installation and qualification (I.Q.) chapters I, II, and III for FDA validation

Intel Fab 23 (Colorado Springs, CO)

Texas Instruments (Dallas, TX)

Semetech (Austin, TX)

Jacobs Engineering (Worldwide)

October 1999-May 2007 Purity Systems, Inc.

Vendor Inspection/Project Manager

•Audited manufacturers of sanitary pharmaceutical and biotech process equipment including bioreactors, centrifuges, heat exchangers, CIP skids, bioreactor skids, sterilization units and filtration skids

•Utilized effective problem-solving skills and served as a liaison between customers and contractor

•Coordinated and monitored the installation of high purity systems into large and small scale processes for use in both upstream and downstream manufacturing

•Analyzed specifications, documentation and equipment drawings to ensure all aspects of the project and site requirements were followed Instructed and trained contractors in cGMP and ASME BPE standards

•Inspected and performed factory acceptance testing to include authorizing, executing and approving documentation for equipment use in pharmaceutical, biotech processes, general construction and petrochemical

•Composed extensive reports detailing information found during audits, inspections and meetings

•Performed bore scoping in IPEX acid waste lines

•Supervised the installation of high purity piping and drain lines for semiconductor manufacturing facilities

•Achieved gas line certification for tool multiple tool installs

•Achieved pre-manufacturing shop audits

•Completed installation and qualification (I.Q.) chapters I, II, and III for FDA validation

Applied Material (Sunnyvale, CA)

Intel (Sunnyvale, CA)

Jacobs Engineering (Worldwide)

June 1997-October 1999 Marine Drilling Co.

•Monitored and mixed all drilling fluids and chemicals as per chemical requirements for each formation and zone drilling

•Maintained the drive motors and generators for all electrical and mechanical rig operations

•Completed oil wells and fractured for production services

•Fabricated mud delivery systems to shakers and tanks for fluid preparation

•Set multiple size casings throughout drilling operations

•Pressure tested blow out preventers (BOP’s) at 10,000 psi for the safety of all offshore personnel

•Fabricated and designed piping systems for gathering stations

May 1995-June 1997 Helmrich & Payne Drilling Co.

•Monitored and mixed all drilling fluids and chemicals as per chemical requirements for each form and zone drilling

•Maintained the drive motors and generators for all electrical and mechanical rig operations

•Performed horizontal drilling in many different formations and zones with multiple bottom hole assemblies (BHA)

•Performed complete rig break downs and moves every 28-30 days

•Regulated the viscosity and weight of synthetic, oil, and water base fluids throughout the drilling process

June 1994-October 1995 Jalco Oil Field Services

•Served as a liaison between client and contractor

•Ensured all work was performed to documented procedures

•Conducted pre-fabrication meetings and documented appropriately as per purchase order requirements

•Provided expediting support for critical equipment orders

•Performed P&ID audits to ensure all valves, instruments and piping are installed property

•Tested and gauged oil tank batteries daily for distribution

•Logged daily readings of natural gas meter runs for sales

•Installed natural gas flow lines between compressor stations

•Maintained and installed tank batteries, heat treaters, gas separators and defoamers for production services

CERTIFICATIONS

•CWI, AWS QC1 Certified Welding Inspector CWI# 01120211

•ACCP Level II Visual and Optical Testing Inspector

•General Industry/Pressure Equipment (GI; PE)

•ASNT SNT-TC-1A Level II Visual Testing Inspector

•ASNT SNT-YC-1A Level II Mass Spectrometer Leak Testing Inspector

•Toxic Gas Ordinance Training

•Certified Thermoplastics Welding Inspector

•Positive Material Identification certified (PMI)

•OSHA 30 Certified



Contact this candidate