Post Job Free
Sign in

Piping Safety

Location:
Patna, Bihar, India
Salary:
30 lacs per annum
Posted:
September 27, 2020

Contact this candidate

Resume:

SUDHAKARKUMAR

Mobile:+919*********,730******* E-Mail:adgfwj@r.postjobfree.com

PROCESSCOMMISSIONINGOPERATOR

ANOVERVIEW

Graduateengineer(CS)offeringnearly09yearsofexperienceinConstruction&CommissioningofGasPipeline, WaterpipelinesandPetrochemicalsplants.

CurrentlyassociatedwithLarsen&Toubro‘Hydrocarbon’,SaudiArabia,AsCommissioningOperator. Extensiveexperienceinmanagingofpre-commissioningandcommissioningactivitiesExpertiseininterpreting equipment,piping&pipelineconstructiondrawingsandP&ID. Excelentcommunication,planning,analyticalandproblem-solvingskils. CORECOMPETENCIES

InternalInspectionandBox-upofStaticequipmentsand Pre-commissioningactivitieslikePipingCleaning,Piping Hydro&PneumaticTesting,LeaktestingbyN2,Pigging,Dryingusingofdryaircompressortoachievedewpoint, Waterflushing,AirBlowing,CBD,OilFlushing,Inertizationbeforegas-in,DrawingMark-up,MCWalkdown,Punchlist generation&Liquidation,System&SubSystemGeneration,PTWSystem,Systemizationinputs. ORGANISATIONALSCAN

July’19–TillDatewithLarsen&Turbo(L&T),asManagerCommissioning. GrowthPath:

Jul’19-TildateasProcessCommissioningoperatoronFNPDCProject,KSA June’15–June’19withJaihindProjectsLimited,IndiaasServiceSupportEngineer GrowthPath:

June’15-’May’19asServicesupportengineer

Aug’11–May’15withJaihindProjectsLimited,IndiaasPre-commissioningOperator GrowthPath:

Aug’11-May’15asPre-commissioningOperator

KeyDeliverablesasProcessCommissioningOperator

OilGas&PetrochemicalServices•Mechanicalcompletion(MCC)•Pre-commissioning,Commissioning•Operations- Process Plants•InterpretandunderstandP&IDs,PFDs,Isometric & GA drawings.•SIMOPS Operations• Vessels/RotatingEquipmentinspection•PermittoWorkCoordination•Planningwithcommissioningleaderto establishcommissioning/start-upnetworkprioritiesanddurations•Perform folow upofprocesspunchlist& Generatepunchlistclearanceregisterforlaterfielduse•Ensurealhandoverrequirementsareanticipatedandthat finalhandoveroffacilitiesisachievedwithoutanydelay•StrongcommitmenttoQuality,Environmental,HSE, Providinginputsforflushingmark-upLeaktestmarkup,Preparationofleaktestprocedure,identificationofpotential hazardduringleaktestandinputsforpreparationofriskassessment. Ensuringequipmentconditionsand certificationsavailability.Preparationofpunchlistofactivities,strictlyimplementingofHSEprocedure. KEYPROJECTS

Larsen&ToubroHydrocarbon,SaudiArabia

Project:FarabiNormalparaffinderivativecomplex(FNPDCProject) Role:ProcessCommissioningoperatorinTankfarm,utilityblockandSleeperpiping Client:FYPC(FarabiYanbuPetroChemicalCompany)

Dealingwithclientondailybasisforinspectionofpre-commissioningactivities.

Attendingcommissioningmasstoolboxmeetings.

Applyingpermitforactivitiesassociatedwithpre-commissioningandcommissioning.

Ensureappropriatetoolsandtacklesareavailableduringworkexecution.

EnsuringProceduresandmark-updrawingsareavailableincoordinationwithcommissioningEngineer.

Providingpriorityforconstructioncompletioninordertoachievecommissioningsequence.

GenerationandReviewingofpunchlistitemsandfolowupwithconstructionforprioritycloseout.

RFSUwalkdown,punchgenerationandfolowupforcloseout.

Identificationofcommissioningandpre-commissioningconsumablestoolsandtackles.

Identificationofitemsforfabricationforpre-commissioningandcommissioningactivities. ResponsibilitiesDuringAirBlowing

LinetraceswithP&IDtomakesurelineisreadyforblowingwithreferencetoMark-updrawing.

GivingrequirementoftemporaryarrangementsrequiredforblowinglikePipingSpools,PGs,Hosesetc.

Arrangementsoftoolsandtackles

TemporaryarrangementtodraincontaminatedwateranddisposalasperRCguideline.

VisualInspectionofHosesforphysicalconditionandensuringcolorcodeisimplemented.

Ensuringpressuregaugesarecalibratedandvalidcalibrationcertificateisavailable.

OfferingWitnessrequesttoP&MforAircompressorreadinessandgettingfitnesscertificates.

EnsuringFireextinguisherisavailableatworklocation.

ApplyingPermitforwork(ColdWork,HotWork,WorkatHeightetc..)

ProvidingToolboxtalktoworkmenbeforecommencementofwork.

EnsuringPPErequirementandimplementationduringworkexecution(likehandgloves,helmets,safety glasses,reflectivejacket.safety shoes.lanyards.Safetyharness,earplugs,earmuffetc.) ResponsibilitiesDuringAirLeaktest

LinetraceswithP&IDtomakesurelineisreadyforblowingwithreferencetoMark-updrawing.

IdentificationofAirconnectionpoint

Ensuringgasketsareavailableatsiteifrequiredtoreplaceduringleaktest.

EnsuringflangejointsarewrappedwithMaskingtapes.

Ensuringareaisbarricadedandsignboardsareplaced.

Ensuringsoapsolutionisavailabletocheckleaks.

OfferingclientinspectionandgettingICAPschecksheetsign-off.

EnsuringBox-upofdisturbedjointsarecompletedandbox-upprotocolissign-offbyclient. ResponsibilitiesDuringInertization

EnsuringsystemisreadyforInertization.

IdentifyingN2hoseconnectionpoints.

ApplyingdifferentmethodsforInertization(ContinuousPurging,PDPmethod)toensuresystem isO2free andreadytoreceivehydrocarbon.

EnsuringO2meteriscalibratedandavailableatworklocation.

Ensuringareaisbarricadedandsignboardsareplaced.

Ensuringproperannouncementismadeforworkmenworkingnearby.

OfferingclientinspectionandgettingICAPschecksheetsign-off.

EnsuringBox-upofdisturbedjointsarecompletedandbox-upprotocolissign-offbyclient. ResponsibilitiesDuringStaticEquipmentBox-up(Vessels&Tanks)

Ensuringpermitisavailabletoworkinsideconfinedspace.

Ensuringalpersonnelarehavingconfinedspaceentrytraining.

Ensuringventilationplanisimplemented

EnsuringwholewatcherisdeployedatentrypointandkeepingtherecordsforIn/Out.

ConfirmingGastestingbeforeentryinside.

Ensuringexhaustfansareworkingfineandproperventilationtoavoidoxygendeficiency.

Ensuringuseof24Vhandlampforlightingonlyinsideconfinedspace.

EnsuringUseofdustmasksanddisposalcoveralduringinternalcleaningoftanksandvessels.

Ensuringarrangementisdoneasperrescueplan

Offeringinternalinspectionofequipmentstoclient.

Ensuringaltheinternalpunchesareclosedraisedbyclientbeforebox-up

EnsuringICAPschecksheetsaresign-off.

Company:JaihindProjectsltd

Project-CityGasDistributionProject,Anjar,Adipur&GandhidhamCity,PipelineDia.8”,Length22.5Km. Role:ServiceSupportEngineer

Executedprojectinpipelineswheremyrolesareasfolowed.

Hydrotest.

Swabbing.

Pigging.

Drying

NitrogenPurging

Commissioningofpipelines.

Project-PolypropyleneUnit(PPU) MangaloreRefineryphaseIII Role:Pre-commissioningOperator.

Executedprojectinpipelineswheremyrolesareasfolowed.

Hydrotest

Swabbing

Pigging

Drying

NitrogenPurging

AndCommissioningofpipelines.

CERTIFICATIONS

14DaysvocationaltraininginBokaroSteelPlant.

EDUCATION

B.Techin ComputerSciencefromTechnicalUniversityJalandhar,Punjab,Indiain2010.

IntermediateinSciencefromSDSColegeofBIEC,Patna,Indiain2003.

MatricinSciencefromSonahulaHighSchoolGopalganjofBSEB,Patna,Indiain2001. ITSKILLS

CertificationinJava

MicrosoftOffice(Word,PowerPoint&Excel)

InternetApplications

PERSONALDOSSIER

DateofBirth :05thFeb1987

Address :YanbuSaudiArabia

PassportNo. :K6338019

DrivingLicense :India

No.ofDependants :5

Nationality :Indian

MaritalStatus :Married

LanguagesKnown :English,Hindi&Arabic(Beginner)

I hereby declarethattheabovefurnished details are true tothebestofmyknowledge. Name:SudhakarKumar

Date:



Contact this candidate