Post Job Free
Sign in

Power Plant Manager

Location:
Hyderabad, Telangana, India
Salary:
10.5 lac year
Posted:
September 26, 2020

Contact this candidate

Resume:

RESUME

Name:- NIPESH KUMAR BISWAS

***.Urvashi Apartment

SBI COLONY.AYODHYA NAGAR.

MEHADIPATNAM.HYDERABAD-28

Mobile :081********

MAIL ID:******@*****.**.**

FOR THE POST OF : Manager_mechanical Maintenance

Personal Particulars:-

Father Name: Late.Narendranath Biswas

Date of Birth – 5TH JULY 1965/ Age 53-years.

Nationality – Indian

Language – Hindi, English,Telugu and Bengali,

Total years of Experience: I have 24 years experience in the STEEL PLANT & POWER, PLANT-PROJECT &MAINTANENCE WORK.at Present working M/s.Hitachi Zosen India Pvt, Ltd. worked as a Project Manager .Present project MSW Plant. Jabalpur. From:2015 continued.

EDUCATION

BE –Mechanical Engineering Passed 1987 Osmania University 75% 1stDiv

Intermediate Passed -1982. N.Junior Science College 69% 1stDiv,

10th HSC passed, A.P. Board Kesove Memorial H School, 1980, 53.2% 2nd,Div,

Hyderabad

Objective

A challenging and satisfying assignment, which exploits my experience and capability in the green field of project management. and maintenance.

Key Highlights of Experience

SPONGE IRON

During my tenure with sponge iron units, I have had the exposure to erection, commissioning and maintenance of plant and mechanical equipment such as Rotary Kiln, Rotary Cooler, Belt conveyors, Vibrating screens, Magnetic separators, Vibrating Feeders, Weighing system (weight feeder), De-dusting system (Bag Filter), Various types of Hydraulic & Pneumatic system etc.

STEEL MELTING & CASTING AREA.

During my tenure, I have acquired overall knowledge about operation and maintenance and erection of 300 tone capacity, EAF/LF, and casting area one to six-Stand casting vertical bending,billet making size is 125x14000mm long, Turret erection and alignment, Gega cutting, Cooling Bed, drive Gear box replacement Alignment, Turret erection & Maintenance mechanical HOT Metal and Casting area 300capacity DEMAG EOT CRANE Erection,General Maintenance work Bag House, Lime elevator, 300 ton Capa, Ladle car and ladle Shell & Housing Repairing, EAF panel, Electrodes arms, Clamps changing, Total entire the SMS & Casting area General maintenance and project work having plant knowledge sinter & Coke oven Plants excuatation, SMS, foundry furnace, work. Rolling Mill equipment replacement, and time to time maintenance, breakdown maintenance,

Breakdown and preventive Maintenance, daily maintenance and Central Workshop activity like,

Overhauling of equipment, Machining Turning Lathe work. Fabrication.

POWER PROJECT

In the Power project I had a good Experience in capacity 30 MW to 50 MW Thermal power plant, Captive Power plant form. Green Field to testing, Boiler & Turbine Make BHEL, CVL, Thermax T.B.W.IJT,TEIL-TG, Coal fired, Bagass Biomass, AFBC/CFBC Boiler. exposure to coal handling plant, including Water treatment

CIVIL WORK

In this domain I have had the exposure to RCC construction with design mixed concrete,multi grade equipment structural and foundation work like column footing, building structure, soil testing, load factor on building

Current Assignment

Presently working as a Project and Maintenance In charge, in HITACHI ZOSEN INDIA PVT, LTD. HO-Hyderabad, New technology setup 11.5 MW Waste Energy Power Plant, at Jabalpur.MP. working from : 2015 continued.

Engineering to Commissioning.

3.Correspondence with Consultant in various Techno

Commercial matters including follow-up of bills.

4. Preparation of early Cash flow Budget against the

Estimated work value. Material purchase,

5. Feed back to management for various aspects of cost Control. And time to time site reporting to HO

6. Scheduling and monitoring of commissioning activities

and Follow-up for final documentation of plant inspection.

Process orders and Preparation of various commercial

Documentation including tendering

Previous work experience:-

M/s.Global Board Limited, The unit is in Mahad, Dist. Raigad. work as Junior Engineer, From: 1987 to 1989,Boiler House and Pulp Mill responsibility looking and associates with Jr, Engineers. for General Maintenance and Fabrication works.

Saudi Iron And Steel Co, HADEED. Al Jubail, Saudia Arabia. Worked as Sr.Engineer, from ;1989 to 1995.responsbility activity Melting shop, Continued Casting, area with Ladle section, And others works. General Maintenance and Ladle Repairing, Cooling Bed,Occultation Bending Zone Replacement & Repair, and taken care of breakout of the plant, EAF- Running maintenance, shell patch, panel repairing. Scrap yard Shearing Machine repairing, Furnace, Tundesh, Ladle as on time to time Relining, power cable repairing and change during the time of breakout the power cable. And forging plant equipment erection and maintenance.

Deccan Industrial Boiler Services. Hyderabad base Contracting Company, worked as Site Chief-Engineer, working from: 1995 to 2000. job responsibly various site in India Erection,Fabrication& maintenance depend on the contact.

Ganpati Sugar Industries Ltd, Sangareddy, Medak Dis. 5000/TCD, Sugar Plant worked as Co-Generation Manager,75/tph Bagass fire Boiler and 15.5.MW Turbine, Erection and Testing work From: 2000 to 2002.

Madhya Bharat Papers Ltd,Champa, CG. work as Project Consultancy of 10MW FBC coal Base power plant from green field to Testing complete on schedule working period from 2002 To 2004.

Ispat Industries Ltd,Dolvi, Plant, Dist.Raigargh.MS. large integrated steel plant,250 ton x,3, EAF & 2x250 ton LF, worked as Project & Maintenance Manager, from :2004 to 2006.and looking Sinter plant project complete on time and Coal Injection Plant all the fabrication & Erection under our supervision, Utility plant modification & Maintenance piping and pumps. Caster equipment’s, Ladle Car Rail Track alignment, DRI Conveyors maintenance, Rolling Mill Tunnel furnace, Repairing of BF-taping area, Cold blast pipelines, Skip car Structural fabrication & erection,Plate patch work.with refractory work inspection.

Sunil Hi-tech Engineering Ltd. Project is RGTPS,600MW. Reliance Energy Ltd, Barwala,Haryana.ther completed 8000 ton, TG, Buildup Beam Fabrication & Erection completed on time. From:2007 to 2008.

ISGEC JhonThompson:various project in India worked as Sr. Project Manager, from 2008 to 2013, 190/tph to 425/tph Boiler Erection and Fabrication with Commissioning of CFBC,AFBC, Coal and Bagass base like Biomass Power plant Boilers also Erection.& Commissioning.

Mishan Energy Solution pvt, Ltd, HO-DLF Tower New Delhi.. Present Site Nawanshahr Power Pvt,Ltd., setup two Numbers of 1x70/tph Boiler Erection, Testing and commissioning 15 Mw Captive Power Plant, worked as Project Head. Clint is Nawanshahr Co-operative Sugar Ltd.. Working from: 2013 to 2015

My Strength :I am confident that my expertise can be deployed in Formation, Evaluation, Implementation and Execution of right kind Project Management for smooth execution and operation of the projects including civil foundations for Machinery on Erection turnkey basis for any engineering projects mainly power & Steel Plant, Heavy structural fabrication & erection of Melting, Roll shop and others.

Related Experience: 13,years working in SMS are and Continued Casting Area and other steel melting shop area and Ferro Alloy Utility. And, Refractory work. Material handling Vibratar, screen vibrator,

Present drawing salary : 9.5/- lakh per annum

Expected salary :

,

Notice Period : One month.

I hereby declare that all the information given above is true and I hold the responsibility of its authenticity

Thanking You

Yours Truly

NIPESH KUMAR BISWAS

Place: Hyderabad



Contact this candidate