SHABEEB ABDUL AZEEZ
Q u a n t i t y S u r v e y o r / E s t i m a t o r
O B J E C T I V E
To pursue a career as Quantity Surveyor that provides me an opportunity to enhance my personal and professional skills in both technical and non- technical areas and to contribute effectively to the organization’s objectives. WORK E X P E R I E N C E
Quantity Surveyor/Estimator A p r i l ’ 1 8 – T i l l d a t e D o h a P e t r o l e u m C o n s t r u c t i o n C o m p a n y
( D O P E T ) Q a t a r
R e s p o n s i b i l i t i e s a s Q S :
- To prepare initial budget report for project.
- To create Project in SAP (PS Module) and define Budget and cost plan.
- Preparation / Verification of BOQ/BOM
- Sub-contracting: Preparation of SOW, Comparison, study and apply contractual clause like PGB, ABG, Warranty, Retention, LD etc, and other support for preparation of Service order using SAP MM Module.
- Review invoices related to Service order and create SES (Direct entry ML81N or RA Bill process zmm_rabill)
- Prepare monthly Project Cost Reports and monitor cost variance, forecasts, cost at completion, profit margin etc.
- Prepare Bi-monthly Cash flow report.
- Preparation of Client invoices in SAP using SD Module.
- Preparation of Change Orders.
R e s p o n s i b i l i t i e s a s E s t i m a t o r :
- Review the tender documents including scope of work (SOW), key contract dates, design requirements etc.
- To take part in the Site visit/pre-bid meeting.
- To prepare Technical Queries and to follow-up with the client.
- To send RFQ, conducting technical clarification and to analyse the prices for the material/services with vendors /subcontractors.
- Develop and verify MTOs, equipment and bulk quantities against P&IDs and drawings.
- Preparation of estimation (Manpower, material, equipment, civil, fabrication etc.) based on type of contract, SOW, technical spec. etc.
- To prepare/arrange required documents for bid submission.
- Prepare and submit Technical and commercial bid, follow-up until finalization.
C O N T A C T
Doha, Qatar
*******.***@*****.***
+974-******** (Qatar)
+91-965******* (India)
K E Y P O I N T S
o Experience: 5 years in Oil
& Gas sector – Qatar
o Knowledge in SAP
o Work experience with
major gas plants in Qatar-
QATARGAS (North &
South) and DOLPHIN
ENERGY
o Knowledge in PCI & EPC
Project Estimation
o Knowledge in project cost
controlling & reporting,
Variation orders, client
Invoicing etc.
S K I L L S
o SAP experience
o Good knowledge in MS
office
o Communication Skills
o Time Management
o Technical skills
o Confidence
o Excellent interpersonal
skills
o Patience
o Team Worker
Page 2 of 3
T R A I N I N G S
a)QATARGAS-SOUTH
o Work Management
System (WMS)
o H2S Training
o Safety induction
o class1 confined space
b) QATARGAS – NORTH
o PTW Training
o Life Saving Rule training
o H2S Training
c) DOLPHIN ENERGY
o PTW Training
o H2S Training
o Safety induction
L A N G U A G E S
o English
Speak, Read, Write
o Hindi
Speak, Read, Write
o Malayalam
(Mother Tongue)
Speak, Read, Write
Junior Engineer Aug’ 1 5 – M a r c h ’ 1 8
D O P E T, Q a t a r
- Assisting Project Engineer to mobilize manpower and construction materials to site as per project schedule.
- Preparation/arrangement of relevant documents for the permit like eMOC, Method of statement, lifting plan, pipe drawings, MSDS, Excavation certificate, confined space certificate, etc.
- Applying permit for all work as per the client permit procedure and communicating with the operations personnel.
- Co-ordination with Site supervisor to ensure that work is executing as per the permit and hazard control measures mentioned in the JSA.
- Progress reporting to management in weekly meeting.
- Ensure safe and quality work based on the management, HSE and quality policies.
M A J O R P R O J E C T S
PROJECTS IN QATAR GAS NORTH, QATAR
- EPC for Replacement of Fresh Water Exchangers in QG2 – LTC
/C/VEN/2615/16: EPC project to carry out the replacement of nine Fresh cooling water exchangers in QG2 Train 5 during Shutdown. PROJECTS IN QATAR GAS SOUTH (RASGAS), Qatar
- PCI for multidiscipline facilitating works for train-1&2 Analyzer system replacement: PCI project to demolish the existing analyser house in Train 1 & 2, installation testing & commissioning of new Analyzer house, associated electrical/instrumentation/F&G system, civil and mechanical piping activities.
- AKIS Upgrade Project in Compliance with QCDD Requirements Phase I & II: PCI project to carry out installation or modification of AKIS/AKMC facilities to meet the QCDD requirement, which includes Installation of new pump houses, installation/modification of HVAC system (installation of Fire Dampers, Ventilation systems, ducting system etc.), installation/modification of F&G system (Detectors, panels, Auto-diallers etc.)
- Partial replacement of common Train 6&7 off-gas (phase 4) piping: PCI project to remove 18” common off-gas after cooler outlet SS pipe in Train 6 & 7, which is effected from Chloride stress corrosion cracking (CLSCC), and replace with Incoloy 825 material.
- LP Steam 48” header tie-in job during shutdown – RGCP 691: To tie in 48” LP steam new line with the existing pipe line during train 6 & 7 shutdown.
- Removal of Girth flange of SRU reaction furnace (169-F001) - AKG-2 SHUTDOWN JOB: To cut and remove the Girth flange on the SRU reaction furnace (169-F001) and to weld with new 30mm thickness shell plate.
Page 3 of 3
R E F E R E N C E S
U p o n R e q u e s t
- Flare Elimination at start-up of train 5(Long loop recycle) project - RGCP 529: EPIC project of new pipe line associated valve, fittings, and instruments etc. for the purpose of recycling the gas instead of gas flaring during start-up of train 5.
PROJECTS IN DOLPHIN ENERGY, Qatar
- Replacement of Selected SEKO Make Dosing Pumps with alternate Reliable make Pump FMP-684: Replacement of existing SEKO make dosing pumps in DEL onshore plant (total21 no’s) which are identified as being in critical services and are having frequent failure and high maintenance cost.
I N D U S T R I A L T R A I N I N G
- Undergone 4-months Industrial training in WELCARE ENGINEERING AND SERVICES (P) LTD. (Authorized dealer of KIRLOSKAR OIL ENGINES)
- Undergone 3-month training as Mechanical Engineer in PEE KEY STEELS INDUSTRIES, Kerala.
E D U C A T I O N
B.Tech in Mechanical Engineering 2 0 1 1 - 2 0 1 5 C U S A T ( C o c h i n U n i v e r s i t y o f S c i e n c e a n d T e c h n o l o g y ), K e r a l a, I n d i a .
Higher Secondary (Plus two) 2008- 2 0 1 0
K e r a l a S t a t e B o a r d, K e r a l a I n d i a . SSLC (10th Std.) 2008
K e r a l a S t a t e B o a r d, K e r a l a, I n d i a P E R S O N A L D O S S I E R
Age & DOB : 28 years, 27-01-1992
Gender : Male
Nationality : Indian
Father’s Name : Abdul Azeez
Passport No. : M7296221
Visa Status : Qatar Resident Visa
Marital Status : Married