Post Job Free
Sign in

Quantity Surveyor/Estimator

Location:
Al Dafna, Qatar
Posted:
September 27, 2020

Contact this candidate

Resume:

Page * of *

SHABEEB ABDUL AZEEZ

Q u a n t i t y S u r v e y o r / E s t i m a t o r

O B J E C T I V E

To pursue a career as Quantity Surveyor that provides me an opportunity to enhance my personal and professional skills in both technical and non- technical areas and to contribute effectively to the organization’s objectives. WORK E X P E R I E N C E

Quantity Surveyor/Estimator A p r i l ’ 1 8 – T i l l d a t e D o h a P e t r o l e u m C o n s t r u c t i o n C o m p a n y

( D O P E T ) Q a t a r

R e s p o n s i b i l i t i e s a s Q S :

- To prepare initial budget report for project.

- To create Project in SAP (PS Module) and define Budget and cost plan.

- Preparation / Verification of BOQ/BOM

- Sub-contracting: Preparation of SOW, Comparison, study and apply contractual clause like PGB, ABG, Warranty, Retention, LD etc, and other support for preparation of Service order using SAP MM Module.

- Review invoices related to Service order and create SES (Direct entry ML81N or RA Bill process zmm_rabill)

- Prepare monthly Project Cost Reports and monitor cost variance, forecasts, cost at completion, profit margin etc.

- Prepare Bi-monthly Cash flow report.

- Preparation of Client invoices in SAP using SD Module.

- Preparation of Change Orders.

R e s p o n s i b i l i t i e s a s E s t i m a t o r :

- Review the tender documents including scope of work (SOW), key contract dates, design requirements etc.

- To take part in the Site visit/pre-bid meeting.

- To prepare Technical Queries and to follow-up with the client.

- To send RFQ, conducting technical clarification and to analyse the prices for the material/services with vendors /subcontractors.

- Develop and verify MTOs, equipment and bulk quantities against P&IDs and drawings.

- Preparation of estimation (Manpower, material, equipment, civil, fabrication etc.) based on type of contract, SOW, technical spec. etc.

- To prepare/arrange required documents for bid submission.

- Prepare and submit Technical and commercial bid, follow-up until finalization.

C O N T A C T

Doha, Qatar

adgf78@r.postjobfree.com

+974-******** (Qatar)

+91-965******* (India)

K E Y P O I N T S

o Experience: 5 years in Oil

& Gas sector – Qatar

o Knowledge in SAP

o Work experience with

major gas plants in Qatar-

QATARGAS (North &

South) and DOLPHIN

ENERGY

o Knowledge in PCI & EPC

Project Estimation

o Knowledge in project cost

controlling & reporting,

Variation orders, client

Invoicing etc.

S K I L L S

o SAP experience

o Good knowledge in MS

office

o Communication Skills

o Time Management

o Technical skills

o Confidence

o Excellent interpersonal

skills

o Patience

o Team Worker

Page 2 of 3

T R A I N I N G S

a)QATARGAS-SOUTH

o Work Management

System (WMS)

o H2S Training

o Safety induction

o class1 confined space

b) QATARGAS – NORTH

o PTW Training

o Life Saving Rule training

o H2S Training

c) DOLPHIN ENERGY

o PTW Training

o H2S Training

o Safety induction

L A N G U A G E S

o English

Speak, Read, Write

o Hindi

Speak, Read, Write

o Malayalam

(Mother Tongue)

Speak, Read, Write

Junior Engineer Aug’ 1 5 – M a r c h ’ 1 8

D O P E T, Q a t a r

- Assisting Project Engineer to mobilize manpower and construction materials to site as per project schedule.

- Preparation/arrangement of relevant documents for the permit like eMOC, Method of statement, lifting plan, pipe drawings, MSDS, Excavation certificate, confined space certificate, etc.

- Applying permit for all work as per the client permit procedure and communicating with the operations personnel.

- Co-ordination with Site supervisor to ensure that work is executing as per the permit and hazard control measures mentioned in the JSA.

- Progress reporting to management in weekly meeting.

- Ensure safe and quality work based on the management, HSE and quality policies.

M A J O R P R O J E C T S

PROJECTS IN QATAR GAS NORTH, QATAR

- EPC for Replacement of Fresh Water Exchangers in QG2 – LTC

/C/VEN/2615/16: EPC project to carry out the replacement of nine Fresh cooling water exchangers in QG2 Train 5 during Shutdown. PROJECTS IN QATAR GAS SOUTH (RASGAS), Qatar

- PCI for multidiscipline facilitating works for train-1&2 Analyzer system replacement: PCI project to demolish the existing analyser house in Train 1 & 2, installation testing & commissioning of new Analyzer house, associated electrical/instrumentation/F&G system, civil and mechanical piping activities.

- AKIS Upgrade Project in Compliance with QCDD Requirements Phase I & II: PCI project to carry out installation or modification of AKIS/AKMC facilities to meet the QCDD requirement, which includes Installation of new pump houses, installation/modification of HVAC system (installation of Fire Dampers, Ventilation systems, ducting system etc.), installation/modification of F&G system (Detectors, panels, Auto-diallers etc.)

- Partial replacement of common Train 6&7 off-gas (phase 4) piping: PCI project to remove 18” common off-gas after cooler outlet SS pipe in Train 6 & 7, which is effected from Chloride stress corrosion cracking (CLSCC), and replace with Incoloy 825 material.

- LP Steam 48” header tie-in job during shutdown – RGCP 691: To tie in 48” LP steam new line with the existing pipe line during train 6 & 7 shutdown.

- Removal of Girth flange of SRU reaction furnace (169-F001) - AKG-2 SHUTDOWN JOB: To cut and remove the Girth flange on the SRU reaction furnace (169-F001) and to weld with new 30mm thickness shell plate.

Page 3 of 3

R E F E R E N C E S

U p o n R e q u e s t

- Flare Elimination at start-up of train 5(Long loop recycle) project - RGCP 529: EPIC project of new pipe line associated valve, fittings, and instruments etc. for the purpose of recycling the gas instead of gas flaring during start-up of train 5.

PROJECTS IN DOLPHIN ENERGY, Qatar

- Replacement of Selected SEKO Make Dosing Pumps with alternate Reliable make Pump FMP-684: Replacement of existing SEKO make dosing pumps in DEL onshore plant (total21 no’s) which are identified as being in critical services and are having frequent failure and high maintenance cost.

I N D U S T R I A L T R A I N I N G

- Undergone 4-months Industrial training in WELCARE ENGINEERING AND SERVICES (P) LTD. (Authorized dealer of KIRLOSKAR OIL ENGINES)

- Undergone 3-month training as Mechanical Engineer in PEE KEY STEELS INDUSTRIES, Kerala.

E D U C A T I O N

B.Tech in Mechanical Engineering 2 0 1 1 - 2 0 1 5 C U S A T ( C o c h i n U n i v e r s i t y o f S c i e n c e a n d T e c h n o l o g y ), K e r a l a, I n d i a .

Higher Secondary (Plus two) 2008- 2 0 1 0

K e r a l a S t a t e B o a r d, K e r a l a I n d i a . SSLC (10th Std.) 2008

K e r a l a S t a t e B o a r d, K e r a l a, I n d i a P E R S O N A L D O S S I E R

Age & DOB : 28 years, 27-01-1992

Gender : Male

Nationality : Indian

Father’s Name : Abdul Azeez

Passport No. : M7296221

Visa Status : Qatar Resident Visa

Marital Status : Married



Contact this candidate