Post Job Free
Sign in

Electrical Engineer Maintenance

Location:
Pretoria, Gauteng, South Africa
Salary:
R500k pa
Posted:
September 25, 2020

Contact this candidate

Resume:

* ***** *** ***** **

Ext ** Rivercresent Witbank 1042

1034

Johann Lamprecht

Cell no: 083-***-****

Email: **********@*****.***

Skype: Johannlamp83

Personal details

Surname:

Lamprecht

Names:

Hendrik Johannes

ID Number:

830**********

Gender:

Male

Race:

White

Drivers Licence:

Code 08

Home or Alternative Number:

+27-13-693-****

Computer Literacy:

SAP, MS Office Suite, MS Projects, AutoCAD Electrical

Educational Qualifications – National Diploma Electrical Engineering

Qualification

Institution

Year Completed

S4 – Diploma

TUT Witbank Campus

2006

Employment History

Company

Position

Period

Samancor Ferrometals

Maintenance Specialist

Feb 2017 to present

Ariogenix

Maintenance Planner

May 2016 to Jan 2017

Highveld Steel

Engineering Foreman

June 2014 to May 2016

Eaton Electric

Engineer

May 2013 – May 2014

Xstrata Alloys

Senior Planner

July 2010 – April 2013

Highveld Steel

Planning Foreman

Apr 2006 – Jun 2010

Highveld Steel

Junior Technician

Jun 2006 – Mar 2008

Highveld Steel

Student (in service training)

Jan 2005 – May 2006

Informal Qualifications (Additional Training)

Course Name

Date

Boiler Making Aide – CTC

2002

Electrical Phase 1 – CTC

2005

SHEQ Awareness – Transvaal Training

2005

SAP PM – PM101 &102 – Michael Management

2016

Work Experience

Samancor Ferrometals

Maintenance Specialist – Feb 2017 to present

Maintenance specialist for submerged arc furnaces at Ferrometals. Furnace range from 22 to 63MVA and my responsibility include:

Preventative maintenance reviews and updates

Auxiliary equipment include, conveyors, transformers, MCC’s, fans etc.

RCFA ‘s done according plant failure, availability and Pareto’s

Maintenance audits

Shutdowns and planning

Transformer maintenance and condition monitoring

Diverter operations tracking (MR Drives)

Diverter drive and oil filter units including Vacutaps

Transformer testing and general maintenance

Furnace Transformer replacements

Ariogenix

Maintenance Planner – May 2016 to Jan 2017 (Contracted)

I was contracted for the maintenance planning project at Eskom

Review of task lists and updating of planned maintenance schedules

Highveld Steel & Vanadium, Witbank

Engineering Foreman (Mechanical & Electrical) – June 2014 to May 2016

(Retrenched)

Team leading (16 x Artisans & 4 x operators)

Technical problem solving electrical & mechanical and the implementation of improvement strategies to eliminate future failures

Replacements of centrifugal slurry pumps (Envirotech ME 15 &20)

Replacements of multistage high pressure pumps (Curro & KSB)

Clarifier operation & maintenance (water quality control)

Daily toolbox talks and work allocation to all personnel

Mechanical & electrical standby duties

Ordering of spares and outside orders for repairs on equipment (pumps, welding machines, electrical motors, transformers & circuit breakers)

Shutdowns – testing of all transformer trip inputs & outputs, protection relay injection testing, circuit breaker replacements & functionality testing

Transformer maintenance and condition monitoring

Diverter operations tracking (MR Drives)

Diverter drive and oil filter units including Vacutaps

Transformer testing and general maintenance

Other activities include: replacement of LV switchgear, VSD, Soft Starters, motors, oil pumps, welding sockets, lights, cooling tower sprayers, pumps gland packing, water valves, v-belts & gearboxes

Maintenance control measures: water quality samples, thermal scanning of electrical connections, transformer oil samples, tailings dam samples, water usage, gearbox & pump lubrication

Eaton Electrical, Witbank

Engineer – May 2013 to May 2014

Project management (manufacturing of substation to final commissioning)

Technical assistance to all customers on installed equipment (VSD’s, Soft starters, Newelec & Simocode)

All electrical drawings as required by design & functionality

Customer relations, marketing of Eaton branded equipment & FATs

PLC I/O design as per customer requirements (no programming)

Successfully completed more than 100 projects ranging from inserts to complete substations

Onsite installations with the field service technicians

Product knowledge gained as per different designs (ABB, Siemens, Newelec, Allen Bradley, Yaskawa & Eaton products)

Xstrata Alloys, Rustenburg

Senior Planner – July 2010 to April 2013

SAP PM master data updating

Task list and maintenance plan reviews (implementation of Prometheus)

Monthly plant equipment utilization & availability report

Weekly CAPEX, OPEX, outstanding PM, PM confirmation & breakdown reports

Budget transfers (CAPEX / OPEX )

Team leading (3 x planners & 3 x clerks)

Asset register & equipment replacement updates

Technical assistance on electrical equipment & drawings

Condition monitoring with 3rd party service provider (thermal & vibration)

Projects (facilities), planning repairs as per SAP notifications

Implantation of the SAP PM structure for the Tswelopele plant at Xstrata Rustenburg, established the blue print requirements with my planning team & engineers, created the FLOC’s, planner groups, work centre’s, task lists, maintenance plans, cost centre’s, material numbers added to equipment, OEM manuals loaded with equipment specifications, drawings and permits.

Note: all the added information was made accessible to the end user with Prometheus

Highveld Steel & Vanadium, Witbank

Planning Foreman – May 2008 to June 2010

SAP Phoenix project, implementation of SAP at Highveld Steel & Vanadium

Established the blue print requirements with the SAP consultants by adding & creating the FLOC’s, planner groups, work centre’s, task lists, & maintenance plans

Continued review of planned maintenance (task lists, maintenance plans and FLOC structure)

Daily confirmations of PM cards with over inspections

Daily notification report and work allocation as per requests

Save working procedures review and updates

Electrical problem solving as required by various sections

Shutdown planning, ordering of spares and equipment, resource allocation for the required tasks

Monthly availability & OPEX reports

Team leading, work allocation and safety talks (8 x artisans)

Junior Technician – June 2006 to April 2008

33kV circuit breakers, isolators, insulators, capacitors and transformer replacements

Transformer maintenance and condition monitoring

Diverter drive and oil filter units (Drive & selector switch replacements)

Daily maintenance & inspections on the 33kV reticulation grid, transformer temperature readings, oil levels of equipment, breaker & tap changer operations counts, thermal scanning and monthly oil samples on all transformers

Transformer online oil filtration (with 3rd party service provider)

Shutdowns – testing of all transformer trip inputs & outputs, protection relay injection testing, circuit breaker replacements & functionality testing

Other activities include: replacement of LV switchgear, VSD, Soft Starters, motors, oil pumps, welding sockets & lights

Student (In service training P1 & 2) – January 2005 to May 2006

Assisted the project electrical engineer with the rebuild of Furnace 5

Substation installation with 3rd party contractor

Commissioning of the all the furnace auxiliary equipment

Electrical contractor management

All transformer maintenance with guidance of the senior electrical personnel

Personal Note

I am a hard working dedicated, loyal and neat person, who takes pride in giving only the best. I maintain a positive attitude as well as a positive image and get along well with people. Most of my skills gained are based around the maintenance activities in the manufacturing industry and I believe that this will benefit any maintenance focused company.



Contact this candidate