Post Job Free

Resume

Sign in

Precision Millwright

Location:
United States
Posted:
September 25, 2020

Contact this candidate

Resume:

Mar **** - Present

December **** - March ****

October 2017 - November 2017

July 2016 - September 2017

April 2016 - June 2016

Tony Mandujano

**** * *-** * Waskom, TX 75692

918-***-**** • adgeky@r.postjobfree.com

Work Experience

CB&I

Mechanical QA/QC

● -Review general arrangement drawings in IDOCS before inspections

● -Verify equipment is set in proper orientation

● -Ensure the equipment is installed per manufacturer specification or by API specification

● -Review survey report for elevation and plumb

● -Make sure the centerlines and elevation is within tolerance

● -Make sure the base is level and all shims are hard and anchor bolts tight

● -Check D.B.S.E and coupling gap, make sure the the coupling is installed properly

● -Witness the alignments are achieved and that the soft foot is eliminated

● -Check all pipe parallel with feeler gauges and high low off set

● -Fill out QSR reports on inspections and NCR reports on damaged equipment

● -Complete checklist for set equipment, anchor pocket grout, and foundation grout. Sign off checklist and upload the information into IDOCS

● -Work with the millwrights to complete A-sheets. Turner Industries

Precision Millwright

● -set pumps and motors

● -alignments with rotolign plus laser and dial indicators.

● -Sell off equipment for anchor pocket grout and for foundation grout

● -Laid out and shot in sole plates for scale and pipe stress

● -My alignments are on elevation, base is level and on centerlines and my alignments are under .002 horizontal and vertical even for anchor pocket grout Jacobs

Precision Millwright

● -Commissioning

● -Start up

● -Motor alignment

● -Inspection of equipment

CB&I

General Foreman

● -Held daily toolbox meeting and assigned daily job task

● -Scheduled lifts with crane

● -2 week look ahead in Supervisor meetings

● -Scheduled delivery of equipment

● -Staged equipment

● -Assured safety and orientation before every lift

● -Scheduled job completion within budget

Zachry Group

Precision Millwright

● -Layout

● -Set equipment

● -Motor alignment

December 2015 - March 2016

September 2015 - December 2015

May 2015 - August 2015

July 2014 - March 2015

March 2012 - July 2014

February 2012 - July 2014

January 2013

Robins & Morton

Precision Millwright

● -Installation of Alstrom Turbine

● -Inspection and maintenance on Toshiba Turbine

Fluor

Precision Millwright

● -Core Crew Preventative Maintenance

● -Inspection and Maintenance on valves, motors and pumps

● -Motor, pump and valve replacement

Robins & Morton

Millwright

● -Installation of new paper machine

Southern industrial Mechanical Maintenance

Precision Millwright

● -Set shims

● -Shot in base plates

● -Set columns from centerline

● -Flagged Crane operator and assisted Riggers

● -Certified Overhead Crane operator

● -Certified Forklift and Lull operator

● -Set motor base stands off of benchmark

● -Torqued bolts to specs

● -Measured shafts and couplings with mic

● -Put couplings on gearboxes and motors

● -Installation of gearboxes and motors

● -Welded on temporary jack bolts

● -Aligned motors with straight edge and dial indicator

● -Sold off motor with laser

● -Leveled and aligned motors with Transit

Aims

Journeyman Millwright

● -Shutdown Industrial Maintenance and Repair

Carter Brothers

Journeyman Millwright

● -Shutdown Maintenance and Repair in wood mills, paper mills and power plants -Inspected and adjusted conveyor

● -Inspected and repaired press

● -Cut and set cast motor bases to elevation

● -Installation and alignment of motors

● -Installed natural gas burners in power house

● -Installed and repaired couplings, bearings and chains

● -Raked sprockets

● -Operated drot or picker

● -overhead crane

● -Installed pipe and valves

● -Replaced O rings

Fluor

Journeyman Millwright

● -Shutdown Industrial Maintenance and Repair

Roustabout

April 2007 - March 2010

January 2012 - March 2013

August 1995 - May 1996

August 1994 - May 1996

Boothe Enviromental

March 2010 - March 2012

● -Installed gas well compressors

● -Maintenance and Repair in compressor stations

● -Operated Poly pipe welder

● -Operated backhoe and lull

● -Installation of shut off and ball valves

● -Operated bulldozer

Precipitator Service Group

Millwright

● -Shutdown Maintenance and Repair

● -Inspected and repaired hopper gates, valves rapper rooms, pre heaters and precipitators

● -Replaced expansion joints and baskets in Bag house

● -Replaced bottles and wires

● -Structural welding

● -Arc gouging

● -Operated Lull

● -Replaced conveyors and screw

● -Repaired and built new Bag houses

Education

Texarkana College

Welding

● -3 semesters

Arkansas High Vo Tech

Welding

● -2 semesters

Arkansas High Vo Tech

Auto Mechanics

● -4 semesters

References

Ricky Smithwick 501-***-****

Charlie Pollard 903-***-****

Ryan Kruzycki 337-***-****

NCCER

TWIC

Security Passport

Key Qualifications

● -Laser Motor alignment

● -Motor installation

● -Repair and Maintenance on valves and compressors

● -Turbine installation



Contact this candidate