Mar **** - Present
October 2017 - November 2017
July 2016 - September 2017
April 2016 - June 2016
Tony Mandujano
**** * *-** * Waskom, TX 75692
918-***-**** • **************@*****.***
Work Experience
CB&I
Mechanical QA/QC
● -Review general arrangement drawings in IDOCS before inspections
● -Verify equipment is set in proper orientation
● -Ensure the equipment is installed per manufacturer specification or by API specification
● -Review survey report for elevation and plumb
● -Make sure the centerlines and elevation is within tolerance
● -Make sure the base is level and all shims are hard and anchor bolts tight
● -Check D.B.S.E and coupling gap, make sure the the coupling is installed properly
● -Witness the alignments are achieved and that the soft foot is eliminated
● -Check all pipe parallel with feeler gauges and high low off set
● -Fill out QSR reports on inspections and NCR reports on damaged equipment
● -Complete checklist for set equipment, anchor pocket grout, and foundation grout. Sign off checklist and upload the information into IDOCS
● -Work with the millwrights to complete A-sheets. Turner Industries
Precision Millwright
● -set pumps and motors
● -alignments with rotolign plus laser and dial indicators.
● -Sell off equipment for anchor pocket grout and for foundation grout
● -Laid out and shot in sole plates for scale and pipe stress
● -My alignments are on elevation, base is level and on centerlines and my alignments are under .002 horizontal and vertical even for anchor pocket grout Jacobs
Precision Millwright
● -Commissioning
● -Start up
● -Motor alignment
● -Inspection of equipment
CB&I
General Foreman
● -Held daily toolbox meeting and assigned daily job task
● -Scheduled lifts with crane
● -2 week look ahead in Supervisor meetings
● -Scheduled delivery of equipment
● -Staged equipment
● -Assured safety and orientation before every lift
● -Scheduled job completion within budget
Zachry Group
Precision Millwright
● -Layout
● -Set equipment
● -Motor alignment
December 2015 - March 2016
September 2015 - December 2015
May 2015 - August 2015
July 2014 - March 2015
March 2012 - July 2014
February 2012 - July 2014
January 2013
Robins & Morton
Precision Millwright
● -Installation of Alstrom Turbine
● -Inspection and maintenance on Toshiba Turbine
Fluor
Precision Millwright
● -Core Crew Preventative Maintenance
● -Inspection and Maintenance on valves, motors and pumps
● -Motor, pump and valve replacement
Robins & Morton
Millwright
● -Installation of new paper machine
Southern industrial Mechanical Maintenance
Precision Millwright
● -Set shims
● -Shot in base plates
● -Set columns from centerline
● -Flagged Crane operator and assisted Riggers
● -Certified Overhead Crane operator
● -Certified Forklift and Lull operator
● -Set motor base stands off of benchmark
● -Torqued bolts to specs
● -Measured shafts and couplings with mic
● -Put couplings on gearboxes and motors
● -Installation of gearboxes and motors
● -Welded on temporary jack bolts
● -Aligned motors with straight edge and dial indicator
● -Sold off motor with laser
● -Leveled and aligned motors with Transit
Aims
Journeyman Millwright
● -Shutdown Industrial Maintenance and Repair
Carter Brothers
Journeyman Millwright
● -Shutdown Maintenance and Repair in wood mills, paper mills and power plants -Inspected and adjusted conveyor
● -Inspected and repaired press
● -Cut and set cast motor bases to elevation
● -Installation and alignment of motors
● -Installed natural gas burners in power house
● -Installed and repaired couplings, bearings and chains
● -Raked sprockets
● -Operated drot or picker
● -overhead crane
● -Installed pipe and valves
● -Replaced O rings
Fluor
Journeyman Millwright
● -Shutdown Industrial Maintenance and Repair
Roustabout
April 2007 - March 2010
January 2012 - March 2013
August 1995 - May 1996
August 1994 - May 1996
Boothe Enviromental
March 2010 - March 2012
● -Installed gas well compressors
● -Maintenance and Repair in compressor stations
● -Operated Poly pipe welder
● -Operated backhoe and lull
● -Installation of shut off and ball valves
● -Operated bulldozer
Precipitator Service Group
Millwright
● -Shutdown Maintenance and Repair
● -Inspected and repaired hopper gates, valves rapper rooms, pre heaters and precipitators
● -Replaced expansion joints and baskets in Bag house
● -Replaced bottles and wires
● -Structural welding
● -Arc gouging
● -Operated Lull
● -Replaced conveyors and screw
● -Repaired and built new Bag houses
Education
Texarkana College
Welding
● -3 semesters
Arkansas High Vo Tech
Welding
● -2 semesters
Arkansas High Vo Tech
Auto Mechanics
● -4 semesters
References
Ricky Smithwick 501-***-****
Charlie Pollard 903-***-****
Ryan Kruzycki 337-***-****
NCCER
TWIC
Security Passport
Key Qualifications
● -Laser Motor alignment
● -Motor installation
● -Repair and Maintenance on valves and compressors
● -Turbine installation