Post Job Free

Resume

Sign in

Red seal journeyman pipefitter

Location:
St. Albert, AB, Canada
Posted:
September 25, 2020

Contact this candidate

Resume:

Jeremy Millard,RSE

Red Seal Journeyman Steamfitter/Pipefitter

780-***-****

adgeb2@r.postjobfree.com

**-** *** ***** *****

St. Albert, AB T8N 3T1

1-780-***-****

Objectives

I have finished my Steamfitter Pipefitter program at Nait along with my Red Seal Endorsement and I am currently seeking a good opportunity to further my career in a fast paced work environment. I have a lot of experience in trades and industries. I pride myself on my work ethic, honesty, and believe that I would be a valuable asset to any company, with my impeccable safety record

Experience

Forth year steamfitter/pipefitter

Newcart contracting, Husky prince George, Strathmore, Lloydminster

While with Newcart we preformed all outage duties including bundle and exchanger removal and replacement. We as a group maintain an excellent safety record while completing all the projects well ahead of schedule

Journeyman Glycol Steam Tracer

Kaffer insulation Jan 2019-April 2019

While here I preformed typical glycol tracing duties continuing the construction of harvest black gold site while trouble shooting and repairing exisiting tracing on the project while maintaining perfect attendance and a perfect personal and crew safety record

3rd year steamfiiter/pipefitter NAIT patricia campus

Oct2018 Dec 2018

3rd Year Pipefitter/Steamfitter, Glycol tracing estimator

Ceda Meg Energy Conklin Ab July 2018-Oct 2018

While here I preformed normal pipefitter duties involved with project expansion while maintaining and perfect safety record and performing extensive and critical rigging into existing modules. And also estimated and ordered all necessary materials and tools necessary for the glycol tracing project expansion.

I left my position here only to continue my education in my trade

Journeyman glycol heat tracer Thomas Group, Harvest black gold

Jan 2018-July 2018

While here we were responsible for trouble shooting a system that was left for four years and no drawings or info of what was completed or done before the site shutting down. We were also tasked with the completion of construction and pneumatic testing of the system, we did this with Zero incidents or accidents and well ahead of schedule

3rd year steamfitter/pipefitter PCL Energy, Fort hills SE Construction April 2017- Dec 2017

While here I have maintained a perfect safety record and a very strong production factor while completing all 3rd year duties and most jman duties as well, putting my jman skill to the test has been a strong point for me starting jobs from scratch and running them to completion

3rd year pipefitter Newcart contracting Husky Upgrader Lloydminster

Shutdown/Outage 2017 June2017-June2017

While here I w

3rd year Pipefitter, JV Driver fabricating, maintenance and shutdown May 2015-Dec 2016

Worked for 8 months total in the Ore processing plant and Extraction areas for outages. Fabricating, prepping and rigging piping systems for modules. Reading and interpreting isometetric drawings, maintained a perfect safety record and I pride myself in that I worked in unison with some times 3 trades at once on the project at the same time

Pipefitter, Pillar Oilfield Projects January 2015 – May 2015

Reading and interpreting blueprints

installing and fabricating piping systems for oilfield modules

maintained a perfect safety record and perfect attendance

working within a team environment

3rd year pipefitter/Glycol Heat Tracing, JV Driver, May 2014 – December 2014

Scheduling and running crews of up 15 men and women I kept all schedules as per the agreed upon timeline Installing and testing ” and ” copper tubing on site facilities

Installing valve baskets and planning as well as installing leads to manifolds

Was promoted from Journeyman to Lead hand to Foreman

Maintaining a perfect safety record and very good attendance

Pipefitter, Quinn Construction, July 2012 – May 2014

Estimating and scheduling module projects and running crews while maintaining all schedules and keeping all projects on time Installing, testing ” stainless steel heat trace tubing on oilfield modules

Bending, installing valve baskets

Terminating bulkhead plates and pre insulated tubing (PIT), tray and strut

Maintaining a perfect safety record and very good attendance

, Glycol Heat Tracing/Pipefitter, Pillar Oilfield projects, November 2011 – June 2012

Installing ” stainless steel heat trace tubing on oilfield modules

Bending valve baskets, terminating bulkhead plates

Installing pre insulated tubing tray and strut

Machine opp/Pipe layer Gary Carter Excavating, May 2009-October 2011

Replacing and installing water and sewer service lines from main tie-in to houses and businesses and trenching in power services from prop line to house

Pipe layer, Eng Con, April 2007-May 2009

Installing various sizes of main line water and sewer lines in new subdivisions installing main valves, curb stops, hydrants

Education

NAIT Steamfitter Pipefitter 3rd year Program

Paul Kane High School

References

Dan Papannik- Foreman-Ceda 587-***-**** Evan Reid - General Foreman JV Driver 780-***-**** Jarrod Millard – Foreman Pillar/Quinn – 780-***-****

Pat Winters – Superintendent Pillar/Quinn – 587-***-****



Contact this candidate