YUMEI XUN
Phone: 1-403-***-****
e-mail: ********@*******.***
Page 1 of 4
OBJECTIVE: Senior instrumentation and control systems engineer in oil, gas, chemical, petrochemical, sawmill/planer looking for position where I can support programming of process control applications on DCS, PLCs, HMIs, carry out detailed design of instrumentation and develop various engineering deliverables. Support develop new grads on instrumentation and process control skills. MEMBERSHIP: Registered Professional Engineer with Alberta Association of Professional Engineer HIGHLIGHT OF QUALIFICATIONS:
• More than 20 years of Instrumentation, control systems design and engineering practice in the oil, gas, petrochemical, mining and sawmill industries.
• Skilled in instrumentations selection and design including temperature, pressure, level, flow transmitters and fire and gas systems.
• Experienced in Control System (DCS/SIS/FGS/PLC) programming, testing, commissioning and start-up gained in many large and complex projects.
• Successful in developing DCS/SIS/FGS/PLC functional design specifications, control and safeguarding narratives, testing procedures.
• Strong work ethic for liaising with internal and external customers to meet tight project schedules resulting in high quality work, under stressful and multi-tasking conditions.
• As project’s lead engineer, coordinated with other disciplines to incorporate their needs into control system scope, supervised, trained and managed other control system engineers to complete control system design, installation, configurations, FAT and commissioning of instrumentation & control systems.
EMPLOYMENT HISTORY:
PLC/Process Control Optimization Specialist
Eacom Timber Corporation, Timmins, Ontario Jan 2016 to present
• Identify Saw Mill/Planer’s problems, develop and implement solutions.
• Develop/support automation initiatives on many platforms (Modicon/RSLogix/Motion Control).
• Configure various automation systems: process control systems, safety instrumented systems, fire and gas systems including code development, specify hardware needed as per projects.
• Design and create the process control graphics using FactoryTalk View, Wonderware and Vijeo Designer.
YUMEI XUN
310 Wilson Ave Timmins
Canada ON P4N 2T5
Phone: 1-403-***-****
e-mail: ********@*******.***
Page 2 of 4
Senior Instrumentation and Control System P.Eng.
Saipem Canada Inc., Calgary, Alberta, Canada Mar 2014 to June 2015 Project: CNRL Hydrotreater Phase 3, Fort McMurray, AB, Canada
• Developed material requisition, inspection test requirement, instrument datasheets, purchase requisition and technical bid evaluation for level/temperature/flow/pressure instruments and gas detectors.
• Generated Instrument Level Installation Sketches using MicroStation. Senior Instrumentation and Control System P.Eng
Fluor, Vancouver, British Columbia, Canada May 2011 to Mar 2014 Project 1: Cerro Verde Production Unit Expansion Project, Peru
• Involved in Process Plant Network and Distributed Control System block diagrams.
• Developed Video Image Analysis/CCTV specifications, the scopes of work, block diagram, bill of material and technical bid evaluation.
• Generated DCS technical documents including specifications, bill of material, technical bid evaluations.
• Created I/O count for cost and work estimation.
• Developed control system and instrumentation power consumption and coordinated with electrical engineers to ensure UPS proper sizing.
• Created Profibus DP segment drawings using MicroStation and reviewed MCC/UPS schedule. Project 2: Oyu Tolgoi Project, South Gobi, Mongolia Technical Environment: Emerson DeltaV
• Analyzed clients’ requirements using clients’ specification and attended technical clarification meetings to ensure the total fulfillment of clients’ requirements.
• Configured and tested the simple/complex loops, motor’s control modules, process alarms and Created graphics using Emerson DeltaV, Allen Bradley PLC and SCADA.
• Participated in Hardware Acceptance Tests and Factory Acceptance Tests. Senior Instrumentation and Control System P.Eng
Bantrel (Bechtel Canada), Calgary, Alberta, Canada Sep 2006 to May 2011 Project 1: ConocoPhillips Surmont 2 Project, Fort McMurray, Alberta, Canada
• Developed DCS Functional Design Specifications and Template Narratives which gave foundations for preparing the process control narratives for all process units.
• Created Process Control Narrative, review and issue through the detailed design stage of the project.
YUMEI XUN
310 Wilson Ave Timmins
Canada ON P4N 2T5
Phone: 1-403-***-****
e-mail: ********@*******.***
Page 3 of 4
Project 2: Shell Canada Energy Scotford Upgrader Project, Fort Saskatchewan, Alberta, Canada
• Responsible for Honeywell Experion Distributed Control System implementation for the entire project in close cooperation with the Main Automation Contractor (MAC) - Honeywell.
• Participated in P&IDs, Cause & Effect (Shutdown keys), DCS/SIS/FGS panel layout drawing and Electrical drawing reviews through the detailed design development phases.
• Involved in Process Control Narrative development, review and issue through the detailed design stage of the project.
• Programmed/Tested IOs and control strategies using Honeywell Experion PKS Control Builder and presented Hardware Acceptance Test (HAT).
• Checked the field’s analog, digital, foundation fieldbus software and hardware signals.
• Resolved various technical problems during commissioning and provided site support during commissioning phase.
• Coordinated and performed the Factory Acceptance Test’s (FAT), Site Acceptance Test’s
(SAT), field commissioning and start-up of DCS, SIS, FGS and PLC systems. Electrical, Control and Instrumentation Specialist Enerflex Systems Ltd., Calgary, Alberta, Canada Aug 2005 to Sep 2006
• Ensured instrumentation and controls meet domestic and international codes/standards including IEC, NEC, CSA, ANSI, NEMA, NFPA.
• Developed P&ID’s, prepared plant control and protection philosophy, reviewed HAZOP, evaluated technical bids and reviewed suppliers’ documents.
• Designed and verified engineering drawings and documents for detailed design including datasheets, wiring drawings, panel layouts, installation detail drawings, location drawings, cable schedules and bill of materials.
• Selected instruments to meet process requirements. This included but not limited to the following devices: temperature/flow/pressure/level instruments, I/P transducers, valves, solenoid valves and analyzers.
• Effectively handled technical queries with respect to engineering design/construction ensuring project proceeds according to specification, schedule and cost constraints.
• Supervised the installation of instruments, cable trays, junction boxes and cables terminations. Distributed Control System and Safety Instrumented Systems Engineer Yokogawa Software Engineering (Wuxi) Co., Ltd., China Oct 1997-Aug 2004 Project 1: South China Sea Off-Shore Project, which was invested by CNOOC and Shell 2003-2004 Technical Environment: Yokogawa System (In Singapore)
• As project’s lead engineer, coordinated and supervised control system design, installation, configurations and Factory Acceptance Test (FAT) for Lower Olefins Plant.
• Integrated communication networks consisting of industrial computer systems.
• Generated and debugged the Control Diagrams, Sequence Tables and Logic Charts, Sequence and Batch Oriented Language for the Furnace section of Lower Olefins Plant. YUMEI XUN
310 Wilson Ave Timmins
Canada ON P4N 2T5
Phone: 1-403-***-****
e-mail: ********@*******.***
Page 4 of 4
• Implemented analog, digital, foundation fieldbus and function blocks for process control, safety interlock, operator interfaces, report generation, and closed loop PID control (for temperature, level, pressure and flow control).
• Managed sub-system integration processes (e.g. Metering system, Reciprocating and Centrifugal compressors, Gas Turbine Generators, Tank Gauging and Machine Monitoring System etc..) ensuring a “Single Operator Window” philosophy.
• Participated in Factory Acceptance Tests for all devices and uploading the latest Foundation Fieldbus files.
Project 2: AR4 Project (4th Aromatics Plant, Iran) 2001 to 2002 Technical Environment: Yokogawa System (In China and Japan)
• As project’s lead engineer, coordinated and supervised control system design, installation, configurations, FAT and commissioning of instrumentation & control systems.
• Generated and debugged the Control Diagrams, Sequence Tables, Logic Charts, Sequence and Batch Oriented Language.
• Coordinated and Performed the In-house Testing and Factory Acceptance Test’s (FAT). Project 3: GASCO Project (GASCO NGL Plant, United Arab Emirates) 1998-2001 Technical Environment: Yokogawa System (In Singapore and Holland)
• Implemented Distributed Control Systems (DCS), Programmable Logic Controllers (PLC) and HMI (Human Machine Interface) programs.
• Generated and debugged the Control Diagrams, Sequence Tables and Logic Charts, customers’ static and dynamic graphics.
• Coordinated and Performed In-house Testing and Factory Acceptance Test’s (FAT). Mechanical and Chemical Process Engineer July 1987-Oct 1997 Wuxi Chemical Corp. China
• Responsible for the daily maintenance of variety of chemical equipment to ensure high operating efficiency of plants.
• Performed all kinds of instruments and control system daily maintenance, installation, calibration, repair, troubleshooting, and loop check.
• Designed a variety of process equipment including pressure vessels, plate/packed columns, towers, heat exchangers, storage tanks, mixers, cyclone separators, clarifiers and filters using AuotCAD.
EDUCATION:
Bachelor Degree of Chemical Machine Engineering, NanJing University of Technology 1983-1987 ROCKWELL TRAINING:
Studio 5000 Logix Designer, FactoryTalk View SE Programming and Motor/Drive Troubleshoot Managing Industrial Networks with Cisco Networking Technologies